7021EE/ED-III/LED LAMPS BLOCK-D PWD/13IMPVT. OF IEI IN THE BLDG. OF PWD COMPLEX AT KHOYATHONG WITH ENERGY SAVING LAMPS (REPLACEMENT OF LAMPS WITH LED IN THE BLOCK -D))PWDImphal-West10.073.00Others17/03/20202018-2019Project Status
7022EE/ED-III/LED LAMPS BLOCK-C PWD/12IMPVT. OF IEI IN THE BLDG. OF PWD COMPLEX AT KHOYATHONG WITH ENERGY SAVING LAMPS (REPLACEMENT OF LAMPS WITH LED IN THE BLOCK -C)PWDImphal-West5.744.00Others17/03/20202018-2019Project Status
7023EE/ED-III/LED LAMPS BLOCK-B PWD/11IMPVT. OF IEI IN THE BLDG. OF PWD COMPLEX AT KHOYATHONG WITH ENERGY SAVING LAMPS (REPLACEMENT OF LAMPS WITH LED IN THE BLOCK -B)PWDImphal-West17.144.00Others17/03/20202018-2019Project Status
7024EE/ED-III/LED LAMPS BLOCK-A PWD/10IMPVT. OF IEI IN THE BLDG. OF PWD COMPLEX AT KHOYATHONG WITH ENERGY SAVING LAMPS (REPLACEMENT OF LAMPS WITH LED IN THE BLOCK -A)PWDImphal-West21.970.00Others17/03/20202018-2019Project Status
7025IED/SDO-Keirao/398Constn. of SDO Keirao Bitra (SH: Constn. of SDO & SDC office and land developmentPWDImphal-East212.380.00State Plan17/03/20202018-2019Project Status
7026BD-II/AE-III/MLA Flat/2019-20Renovation of MLA Flat at Babupara.PWDImphal-East58.250.00Others17/03/20202019-2020Project Status
7027IED/Slab culvert-Line drain/397Constn. of Slab culvert 5m span RCC culvert, Chana, 5m span at Lamlai Karthong, 4m span at Lamlai Maning Leikai, 5m span at Sheijang Teramakhong .....PWDImphal-East200.000State Plan16/03/20202016-2017Project Status
7028IED/Kshetrigao/Idigah/396M/o road from Kshetrigao/Idigah road to Top Western side of Iril riverPWDImphal-East19.978.00State Plan16/03/20202017-2018Project Status
702962/9/2018/SPP/DC/MANIREDA(IE)Conversion of Off grid to Grid Interactive SPV Power Plant,Imphal EastMANIREDAImphal-East82.440State Plan16/03/20202019-2020Project Status
7030TML/Eleng-Chaton/44Improvement of road from Eleng to Chaton - 7 kmPWDTamenglong29.960.00State Plan16/03/20202018-2019Project Status
7031MANIDCO_C&I_31CONSTRUCTION OF COMPOUND FENCING OF DIC/ACTC (WESTERN & SOUTHERN SIDE), POROMPAT, DIC, IMPHAL EASTCommerce and IndustriesImphal-East59.970State Plan16/03/20202019-2020Project Status
7032TML/Thiulon-Vachengphai/43Impvt. of road from Thiulon to Vachengphai IVRPWDTamenglong29.980.00State Plan16/03/20202018-2019Project Status
7033TML/Old-New Lenglong/42Impvt. of road from Old Lenglong to New Lenglong IVRPWDTamenglong29.930.00State Plan16/03/20202018-2019Project Status
7034TML/Ndetning-Kuiling/41Impvt. of road from Ndetning to Kuilong-II IVRPWDTamenglong29.940.00State Plan16/03/20202018-2019Project Status
7035TML/Ningdi-Chrinapeng/40Improvement of road from Ningdi to ChrinapengPWDTamenglong29.990.00State Plan16/03/20202018-2019Project Status
7036IWD/Thingom-Khwai Ningthou/148M/o road Thingom Leikai and Khwai Ningthou LeikaiPWDImphal-West35.0024State Plan16/03/20202018-2019Project Status
7037IWD/Pukhrambam Thangjam Leirak/147M/o roads Pukrambam Leirak, Thangjam LeirakPWDImphal-West15.0011State Plan16/03/20202019-2020Project Status
7038IWD/North Kangla Gate/149Restoration of Norther Kangla gate to KhuyathongPWDImphal-West20.000State Plan16/03/20202018-2019Project Status
7039IWD/Nambulan Jail/146M/o of Nambulan Jail road internal roadPWDImphal-West16.0010State Plan16/03/20202019-2020Project Status
7040IWD/Mantri Leikai/145M/o of road Mantri Leikai Maning LeirakPWDImphal-West20.000.00State Plan16/03/20202018-2019Project Status