Project Updates
Showing 15,821-15,840 of 31,151 items.
#Project CodeProject NameDepartmentDistrictPhaseProgress StatusApprove Date
     
15821WRD-FCW-241Construction of RR masonry wall at Khujairok River, Moreh, TengnoupalWater Resources Department (WRD)Tengnoupal1In progress18/11/2021
15822WRD-FCW-226Construction of CC retaining wall with RCC bored pile on LBB of Nambul River, Imphal West, Portion-2Water Resources Department (WRD)Imphal-West01Completes18/11/2021
15823WRD-FCW-225Construction of CC retaining wall with RCC bored pile on LBB of Nambul River, Imphal West, Manipur, Portion-1Water Resources Department (WRD)Imphal-West01Completed18/11/2021
15824WRD-FCW-236Construction of pucca drain at Tang Loubuk Loukol, Chandel DistrictWater Resources Department (WRD)Chandel1In progress18/11/2021
15825WRD-FCW-233Construction of RR Masonry wall Komla Lok River at NampaoWater Resources Department (WRD)Chandel1In. Progress18/11/2021
15826IED/Waithou-Imp Yairi-langdum(8.36-9.66)/710M/o Waithou to Imphal Yairipok road via Langdum (Ch. 8.36 Km to 9.66Km)PWDImphal-East1Completed18/11/2021
15827JBM/Dibong Khunou-Patchao Jiri College/28Impvt. of road from Dibong Khunou to Patchao Jiri College road 2 kmsPWDJiribam1st40%18/11/2021
15828IED/Kangla Helipat/502Removal and clearance of rubbish and grasses from Kangla Helipat and RDS school in connection with the visit of Hon'ble Prime Minister of India ...PWDImphal-EastNACompleted18/11/2021
15829IED/Side Berm-Khongman-Panthoibi(0-2)/451M/o side berm at Khongman Mangjil to Panthoibi Bazar Ch. 0.00Km to 2.00 KmPWDImphal-East1Completed18/11/2021
15830IED/Side Berm-Khongman-Panthoibi(0-2)/451M/o side berm at Khongman Mangjil to Panthoibi Bazar Ch. 0.00Km to 2.00 KmPWDImphal-East1Completed18/11/2021
15831IED/berm-Kongba-Takhok(2.40-5)(19.934)/726M/o side berm at Kongba Bazar to Takhok Bridge Ch. 2.40 Km to 5.00 KmPWDImphal-East1Completed18/11/2021
15832IED/berm-Kongba-Standard Coll(2-4.10)/452M/o side berm at Kongba Bazar to Standard College via Uchekon Khunou Ch. 2.00 Km to 4.10 kmPWDImphal-East1Completed18/11/2021
15833IED/Berm-Sanjenthong-Singj Kongba(1.9-4)/723M/o side berm at Sanjenthong to Singjamei Kongba road Ch. 1.90 Km to 4.00 kmPWDImphal-East1Completed18/11/2021
15834IED/Side Berm -Thumbu- Imp Yari(1.5-2.5)714M/o side berm at New Thumbuthong to Imphal Yairipok road Ch. 1.5 Km to 2.5 KmPWDImphal-East1Completed18/11/2021
15835IED/Side Berm -Thumbu- Imp Yari(0-1.5)713M/o side berm at New Thumbuthong to Imphal Yairipok road Ch. 0.00 Km to 1.50 KmPWDImphal-East1Completed18/11/2021
15836IED/berm-Singjamei-Kongba(4.10-6)/455M/o side berm at Singjamei Bridge to Kongba Road Ch. 4.10 km to 6.00 KmPWDImphal-East1Completed18/11/2021
15837IED/berm-Singjamei-Kongba(0-2.00)/460M/o side berm at Singjamei Bridge to Kongba Road Ch. 0.00 km to 2.00 KmPWDImphal-East1Completed18/11/2021
15838IED/berm-Singjamei-Kongba(2.00-4.10)/456M/o side berm at Singjamei Bridge to Kongba Road Ch. 2.00 km to 4.10 KmPWDImphal-East1Completed18/11/2021
15839IED/Side Berm Langdum(0-2km)/701M/o side berm at Langdum road ch. 0.00 to 2.00 KmPWDImphal-East1Completed18/11/2021
15840IED/Side Berm Langdum(2-4.5 km)/702M/o side berm at Langdum road ch. 2.00 to 4.50 KmPWDImphal-East1Completed18/11/2021