Project Updates
Showing 90,721-90,740 of 91,655 items.
#Project CodeProject NameDepartmentDistrictPhaseProgress StatusApprove Date
     
90721MSPCLB2INSTALLATION OF 2x12.5 MVA, 132/33 kV S/S AT THANLON WITH ASSOCIATED LINEPOWER (MSPCL)ChurachandpurThanlon 132/33kv100%
90722MSPCLB2INSTALLATION OF 2x12.5 MVA, 132/33 kV S/S AT THANLON WITH ASSOCIATED LINEPOWER (MSPCL)ChurachandpurThanlon 132/33kv100%
90723MSPCLB2INSTALLATION OF 2x12.5 MVA, 132/33 kV S/S AT THANLON WITH ASSOCIATED LINEPOWER (MSPCL)ChurachandpurThanlon 132/33kv100%
90724MSPCLB2INSTALLATION OF 2x12.5 MVA, 132/33 kV S/S AT THANLON WITH ASSOCIATED LINEPOWER (MSPCL)ChurachandpurThanlon 132/33kv100%
90725MSPCLB2INSTALLATION OF 2x12.5 MVA, 132/33 kV S/S AT THANLON WITH ASSOCIATED LINEPOWER (MSPCL)ChurachandpurThanlon 132/33kv100%
90726MSPCLB2INSTALLATION OF 2x12.5 MVA, 132/33 kV S/S AT THANLON WITH ASSOCIATED LINEPOWER (MSPCL)ChurachandpurThanlon 132/33kv100%
90727RAMS/EAPAcquiring and Procurement of Road Asset Inventory, Pavement Condition and Roughness Data for Subsequent development of RAMS of PWD Roads, ManipurPWDImphal-West1Ongoing
90728NESIDS THONGJUConstruction of six overhead tank and ground sump and necessary pipe lines in the Thongju and its adjoining areas in Imphal East District for promotinPHEDImphal-EastI30
90729NEC-Tumukhong MoirangpurelComposite water supply scheme for Tumukhong Moirangpurel and its surrounding areasPHEDImphal-EastIOn progress
90730MSPCLB2INSTALLATION OF 2x12.5 MVA, 132/33 kV S/S AT THANLON WITH ASSOCIATED LINEPOWER (MSPCL)ChurachandpurThanlon 132/33kv100%
90731MSPCLB2INSTALLATION OF 2x12.5 MVA, 132/33 kV S/S AT THANLON WITH ASSOCIATED LINEPOWER (MSPCL)ChurachandpurThanlon 132/33kv100%
90732MSPCLC35Re-stringing & strengthening of 33 kV line from Jiribam to Oinamlong on turn-key basisPOWER (MSPCL)JiribamX50%
90733MSPCLC35Re-stringing & strengthening of 33 kV line from Jiribam to Oinamlong on turn-key basisPOWER (MSPCL)JiribamX50%
90734MSPCLC35Re-stringing & strengthening of 33 kV line from Jiribam to Oinamlong on turn-key basisPOWER (MSPCL)JiribamX50%
90735TBL/Darpan/Plan/77Impvt. of road from Champa Bridge to Heirok part-II, Ngarouthel upto SPO Barrack.PWDThoubal270%
90736TBL/Darpan/Plan/77Impvt. of road from Champa Bridge to Heirok part-II, Ngarouthel upto SPO Barrack.PWDThoubal170%
90737MSPCLA1Construction of 3x105 MVA, 400/132 kV Sub-Station at ThoubalPOWER (MSPCL)Thoubal95% completedOngoing
90738MSPCLA1Construction of 3x105 MVA, 400/132 kV Sub-Station at ThoubalPOWER (MSPCL)Thoubal95% completedOngoing
9073948/RCS/METROLOGY/2017-18/AStrengthening Legal Metrology Infrastructure of State/UTs at Lamphelpat, Imphal, ManipurCooperative SocietiesImphal-WestFinal PhaseCompleted
9074048/RCS/METROLOGY/2017-18/AStrengthening Legal Metrology Infrastructure of State/UTs at Lamphelpat, Imphal, ManipurCooperative SocietiesImphal-WestFinal PhaseCompleted