Project Updates
Showing 30,981-31,000 of 31,395 items.
#Project CodeProject NameDepartmentDistrictPhaseProgress StatusApprove Date
     
30981Saiton No. 1 UPS - SS 2019-20Strengthening of School NR under Samagra Shiksha 2019-20 at Saiton No. 1 UPS, Bishnupur DistrictEducation (S)Bishnupurnillinprogess
30982Saiton No. 1 UPS - SS 2019-20Strengthening of School NR under Samagra Shiksha 2019-20 at Saiton No. 1 UPS, Bishnupur DistrictEducation (S)Bishnupurnill inprogess
30983SS/D-2/ChakumaiUJB Dlp- SPTConstruction of Dilapidated Building Primary School Under Samagra Shiksha (Elementary) Manipur during 2022-2023 at Chakumai UJB School, Senapati, ManiEducation (S)SenapatiNillUnder Construction
30984BRD/Bridge-Uchekon Kongba/26Constn. of Bridge over Kongba River at Uchekon KongbaPWDImphal-East---Completed
30985BRD/Bridge-Uchekon Kongba/26Constn. of Bridge over Kongba River at Uchekon KongbaPWDImphal-East---completed
30986EE/TBL/Darpan/Plan/178Impvt. of Khangabok Mamang road connecting NH-39 to Nungleima Lairembi Temple-4kmPWDThoubalI70%
30987SS/D-2/KabowakchingPS 5ACR-BSP Construction of Dilapidated Building Primary School under Samagra Shiksha for the year 2023-24 at Kabowakching Primary School, Bishnupur, Manipur. Education (S)BishnupurnillUnder Construction
30988BRD/Bridge-Uchekon Takhok Mapal/25Constn. of RCC Bridge Kongba River at Uchekon Takhok MapalPWDImphal-East----Completed
30989Ukl/guest house/poi/4059/4Constn. of Guest House at Poi VillagePWDUkhrulPhase 1Completed
30990SE-I/DAR/20-21/CRIF/IE-R1.31 NH39 - IrilbungImprovement of road from NH-39 to Irilbung via Kongba IrongPWDImphal-EastNAIn progress
30991UKL/Impvt of internal road Shimtang Ukhru/105Impvt of Internal road Shimtang Ukhrul (2 km)PWDUkhrulPhase-I85%
30992EE/BPR/Impvt Kumbi Saiton roadImprovement of Kumbi Saiton RoadPWDBishnupur1work is in progress97pc
30993UKL/DAR/2023-24/3/Mathuk bridge to Lamlang Improvement of road from Mathuk bridge to Lamlang gate, Ukhrul district SH Construction of 2 RCC Slab culvertsPWDUkhrulPhase-I97%
30994UKL/DAR/2023-24/3/Mathuk bridge to Lamlang Improvement of road from Mathuk bridge to Lamlang gate, Ukhrul district SH Construction of 2 RCC Slab culvertsPWDUkhrulPhase-I97%
30995UKL/Somdal chapel crossing to RV Themthin/120Somdal Chapel crossing to RV TGhemthing are measuring about 1.2km for WBM and BlacktoppingPWDUkhrulPhase--I61.1%
30996EE/TBL/Darpan/CRIF(P)/128Improvement of Thoubal M.I road(SH-5.30km to 15.50km)PWDThoubal290%
30997CCP/impvt of Lower Kom Keirap Road/142Improvement of Lower Kom Keirap Road 1.5 KmPWDChurachandpurphase 172% progress
30998CCP/impvt of Lower Kom Keirap Road/142Improvement of Lower Kom Keirap Road 1.5 KmPWDChurachandpurphase 1 72% progress
30999CCP/impvt of Lower Kom Keirap Road/142Improvement of Lower Kom Keirap Road 1.5 KmPWDChurachandpurphase 172% progress
31000CCP/ Lower Keirap to PHSC Upper Kom Rwal /141Construction of road from Lower Keirap to PHSC at Upper Kom Keirap with retaining wall of 30 meters 1 kmPWDChurachandpurPhase 161% progress