Project Updates
Showing 29,841-29,860 of 32,363 items.
#Project CodeProject NameDepartmentDistrictPhaseProgress StatusApprove Date
     
29841WP-HE/14-DMC/TE-LDLand Development works in front of D.M. College of Teacher Education and D.M. College of Commerce.Education (S)Imphal-WestNilFinishing
29842MEV-18-NAugmentation of Water Supply Schemes for Thoubal (Waithoupat)PHEDThoubalPhase-1Ongoing
29843MSPCLC22Installation of 2x5 MVA, 33/11 kV Sub-Station along with associated 33 kV LILO line & related works at Khongjom.POWER (MSPCL)ThoubalCompleted100% complete
29844BD-II/AE-I/2016-17/2Renovation of MPSC office, ManipurPWDImphal-EastNil90%
29845WP-08/09-HE-ScLab-IC-SHINGConstruction of Science Lab. at Imphal College, Imphal. (SH: Shingling along the approach of Library Block)Education (S)Imphal-WestNilCompleted
29846MSPCLB6INSTALLATION OF 2x20 MVA, 132/33 kV S/S ALONG WITH ASSOCIATED 132 kV LILO LINE AND RELATED CIVIL WORKS AT ELANGKHANGPOKPI IN MANIPURPOWER (MSPCL)KakchingX100%
29847NEC-II/BPR-NUNGBA/1Improvement of Bishnupur Nungba Road 0-89.52 KmsPWDOthers1In progress
29848WSM-II-CHINGKHEICHINGConstruction of Water Treatment Plant at Chingkheiching (45.00 MLD Capacity) for Imphal CityPHEDImphal-EastOneWork in progress
29849BPR/Constn. of 6m Span culvert/12Constn. of 6m Span culvert at Laisoi-Hiran on the Bishnupur Mayang Imphal at Toubul Mamang.PWDBishnupur2ndCompleted
29850BPR/Constn. of 6m Span culvert/12Constn. of 6m Span culvert at Laisoi-Hiran on the Bishnupur Mayang Imphal at Toubul Mamang.PWDBishnupur2ndCompleted
29851MSPCLC5Installation of 2x5 MVA, 33/11 kV Sub-Station with associated 33 kV line at Nungbi KhullenPOWER (MSPCL)UkhrulX100
29852IED/Luwangsangbam Mamang/74Impvt. of road from Luwangsangbam Mamang Leikai (Haotabi to Liberal College gate).PWDImphal-East1On going
29853IED/Godown Gate Luwangsangbam/73Impvt. of road from Godown Gate (NH-2) Luwangsangbam Maning Leikai.PWDImphal-East1On going
29854IED/Drain- Koirengei-Maria Montessori Gate/78Constn. of pucca line drain from Koirengei Bazar to Maria Montessori GatePWDImphal-East1On going
29855IED/RCC culvert Lairikyengbam//92Contn. of 2m span RCC clab culvert and line pucca drain at Lairikyengbam Makha Leikai Salan leirak and Maning Chuthek LeikaiPWDImphal-East1On going
29856CCP/Thingkeu Henglep/3Improvement of Thinkeu-Henglep roadPWDChurachandpur2016-17Complete
29857IED/Sangakpham Bazar-Paomei Colony/69Constn. of RCC slab culvert and pucca line drain from Sangakpham Bazar to Paomei Colony Heingang RoadPWDImphal-East1On going
29858IED/RCC culvert-Kontha Ahallup/84Constn. of 1 m span RCC slab culvert at Kontha Ahallup.PWDImphal-East1On going
29859IED/Liberal College-Godown/89Impvt. of road Liberal College Gate to Godown Maning RoadPWDImphal-East1On going
29860IED/RCC culvert Luwangsangbam-Matai/90Constn. of RCC Slab culvert 1.5m span at Luwagsangbam Matai RoadPWDImphal-East1On going