| 21641 | NEC(Oklong) | Composite Water Supply at Oklong | PHED | Senapati | 1 | completed | 07/03/2020 |
| 21642 | MSPCLB14 | Construction of 132 kV link T/L from 400/132 kV SS, Thoubal to 132kV SS at Kongba, Yaingangpokpi and Hundung on existing Kongba to Kakching 132 kV T/L | POWER (MSPCL) | Thoubal | 2 | 98% | 07/03/2020 |
| 21643 | MSPCLB14 | Construction of 132 kV link T/L from 400/132 kV SS, Thoubal to 132kV SS at Kongba, Yaingangpokpi and Hundung on existing Kongba to Kakching 132 kV T/L | POWER (MSPCL) | Thoubal | 2 | 98% | 07/03/2020 |
| 21644 | NEC(Oklong) | Composite Water Supply at Oklong | PHED | Senapati | 1 | completed | 07/03/2020 |
| 21645 | NEC(Oklong) | Composite Water Supply at Oklong | PHED | Senapati | 1 | completed | 07/03/2020 |
| 21646 | NEC(Oklong) | Composite Water Supply at Oklong | PHED | Senapati | 1 | completed | 07/03/2020 |
| 21647 | NEC(Oklong) | Composite Water Supply at Oklong | PHED | Senapati | 1 | completed | 07/03/2020 |
| 21648 | NEC(Oklong) | Composite Water Supply at Oklong | PHED | Senapati | 1 | completed | 07/03/2020 |
| 21649 | NEC(Oklong) | Composite Water Supply at Oklong | PHED | Senapati | 1 | COMPLETED | 07/03/2020 |
| 21650 | NEC(Oklong) | Composite Water Supply at Oklong | PHED | Senapati | 1 | completed | 07/03/2020 |
| 21651 | NEC(Oklong) | Composite Water Supply at Oklong | PHED | Senapati | 1 | completed | 07/03/2020 |
| 21652 | NEC(Oklong) | Composite Water Supply at Oklong | PHED | Senapati | 1 | COMPLETED | 07/03/2020 |
| 21653 | 27/8/2012/TSM(PtVII)/MQCD/Marjing Adm Bldg/10 | Infrastructure Development for Destination and Circuit (SH-Construction of Administrative Building,Statue,Landscaping etc. at Marjing) | PWD | Imphal-East | 5 | On going | 07/03/2020 |
| 21654 | MSPCLB16 | Stringing of 132 kV single circuit line (2nd circuit) on double circuit towers from Kakching to Churachandpur | POWER (MSPCL) | Kakching | COMPLETED | 100% | 07/03/2020 |
| 21655 | EE/ED-II/Mini-Sectt.-Bldg/43 | Addition & alternation of switch gear for AC, DG & solar line in the Mini-Secretariat Building at Ccpur. | PWD | Churachandpur | 1 | Completed | 06/03/2020 |
| 21656 | MSPCLB2 | INSTALLATION OF 2x12.5 MVA, 132/33 kV S/S AT THANLON WITH ASSOCIATED LINE | POWER (MSPCL) | Churachandpur | X | 100 | 06/03/2020 |
| 21657 | MSPCLC12 | Installation of 2x5 MVA 33KV S/S along with the associated 33KV line and related civil works at Wangoi under IPDS | POWER (MSPCL) | Imphal-West | Completed | 100% | 06/03/2020 |
| 21658 | MSPCLC18 | Upgradation of 33/11 kV SS at Khoupum in Noney Dist. by installing 2x2.5 MVA Transformer | POWER (MSPCL) | Noney | Abc | 100 | 06/03/2020 |
| 21659 | MSPCLC18 | Upgradation of 33/11 kV SS at Khoupum in Noney Dist. by installing 2x2.5 MVA Transformer | POWER (MSPCL) | Noney | Abc | 100% | 06/03/2020 |
| 21660 | MSPCLC15 | Construction of 33 kV DC line on steel tubular pole from 132/33 kV Sub-Station Thoubal to 33/11 kV Sub-Station Thoubal (Old) on turn key basis | POWER (MSPCL) | Thoubal | Y | 100 % | 06/03/2020 |