7181 | EE/HS/Keishamthong A/C. | Impvt. of road in Keishamthong A/C. | PWD | Imphal-West | 150.00 | 60 | State Plan | 18/03/2020 | 2018-2019 | Project Status |
7182 | NH-137A-19-20-01 | FDR on NH-137A, restoration of slided and construction of boulder sausage at km 3.6 | PWD | Kangpokpi | 39.68 | 0 | Others | 18/03/2020 | 2019-2020 | Project Status |
7183 | NH-39-18-19-16 | FDR on NH-39, Construction of protection wall at km 287 | PWD | Kangpokpi | 13.33 | 0 | Others | 18/03/2020 | 2018-2019 | Project Status |
7184 | NH-39-18-19-17 | FDR on NH-39, construction of breast wall km 289.59 and km 289.70 | PWD | Kangpokpi | 20.03 | 0.00 | Others | 18/03/2020 | 2018-2019 | Project Status |
7185 | NH-137A-18-19-14 | FDR on 137A, construction of boulder sausages at km 2.70 | PWD | Imphal-West | 41.82 | 14.64 | Others | 18/03/2020 | 2018-2019 | Project Status |
7186 | EE/ED-III/LED LAMPS BLDG DIVN-I, PWD/15 | IMPVT. OF IEI IN THE BLDG. OF PWD COMPLEX AT KHOYATHONG WITH ENERGY SAVING LAMPS (REPLACEMENT OF LAMPS WITH LED IN THE BUILDING DIVISION NO. I) | PWD | Imphal-West | 6.09 | 5.00 | Others | 17/03/2020 | 2018-2019 | Project Status |
7187 | EE/ED-III/LED LAMPS ELECTRICAL CIRCLE, PWD/14 | IMPVT. OF IEI IN THE BLDG. OF PWD COMPLEX AT KHOYATHONG WITH ENERGY SAVING LAMPS (REPLACEMENT OF LAMPS WITH LED IN THE ELECTRICAL CIRCLE) | PWD | Imphal-West | 11.68 | 4.00 | Others | 17/03/2020 | 2018-2019 | Project Status |
7188 | EE/ED-III/LED LAMPS BLOCK-D PWD/13 | IMPVT. OF IEI IN THE BLDG. OF PWD COMPLEX AT KHOYATHONG WITH ENERGY SAVING LAMPS (REPLACEMENT OF LAMPS WITH LED IN THE BLOCK -D)) | PWD | Imphal-West | 10.07 | 3.00 | Others | 17/03/2020 | 2018-2019 | Project Status |
7189 | EE/ED-III/LED LAMPS BLOCK-C PWD/12 | IMPVT. OF IEI IN THE BLDG. OF PWD COMPLEX AT KHOYATHONG WITH ENERGY SAVING LAMPS (REPLACEMENT OF LAMPS WITH LED IN THE BLOCK -C) | PWD | Imphal-West | 5.74 | 4.00 | Others | 17/03/2020 | 2018-2019 | Project Status |
7190 | EE/ED-III/LED LAMPS BLOCK-B PWD/11 | IMPVT. OF IEI IN THE BLDG. OF PWD COMPLEX AT KHOYATHONG WITH ENERGY SAVING LAMPS (REPLACEMENT OF LAMPS WITH LED IN THE BLOCK -B) | PWD | Imphal-West | 17.14 | 4.00 | Others | 17/03/2020 | 2018-2019 | Project Status |
7191 | EE/ED-III/LED LAMPS BLOCK-A PWD/10 | IMPVT. OF IEI IN THE BLDG. OF PWD COMPLEX AT KHOYATHONG WITH ENERGY SAVING LAMPS (REPLACEMENT OF LAMPS WITH LED IN THE BLOCK -A) | PWD | Imphal-West | 21.97 | 0.00 | Others | 17/03/2020 | 2018-2019 | Project Status |
7192 | IED/SDO-Keirao/398 | Constn. of SDO Keirao Bitra (SH: Constn. of SDO & SDC office and land development | PWD | Imphal-East | 212.38 | 0.00 | State Plan | 17/03/2020 | 2018-2019 | Project Status |
7193 | BD-II/AE-III/MLA Flat/2019-20 | Renovation of MLA Flat at Babupara. | PWD | Imphal-East | 58.25 | 0.00 | Others | 17/03/2020 | 2019-2020 | Project Status |
7194 | IED/Slab culvert-Line drain/397 | Constn. of Slab culvert 5m span RCC culvert, Chana, 5m span at Lamlai Karthong, 4m span at Lamlai Maning Leikai, 5m span at Sheijang Teramakhong ..... | PWD | Imphal-East | 200.00 | 0 | State Plan | 16/03/2020 | 2016-2017 | Project Status |
7195 | IED/Kshetrigao/Idigah/396 | M/o road from Kshetrigao/Idigah road to Top Western side of Iril river | PWD | Imphal-East | 19.97 | 8.00 | State Plan | 16/03/2020 | 2017-2018 | Project Status |
7196 | 62/9/2018/SPP/DC/MANIREDA(IE) | Conversion of Off grid to Grid Interactive SPV Power Plant,Imphal East | MANIREDA | Imphal-East | 82.44 | 0 | State Plan | 16/03/2020 | 2019-2020 | Project Status |
7197 | TML/Eleng-Chaton/44 | Improvement of road from Eleng to Chaton - 7 km | PWD | Tamenglong | 29.96 | 0.00 | State Plan | 16/03/2020 | 2018-2019 | Project Status |
7198 | MANIDCO_C&I_31 | CONSTRUCTION OF COMPOUND FENCING OF DIC/ACTC (WESTERN & SOUTHERN SIDE), POROMPAT, DIC, IMPHAL EAST | Commerce and Industries | Imphal-East | 59.97 | 0 | State Plan | 16/03/2020 | 2019-2020 | Project Status |
7199 | TML/Thiulon-Vachengphai/43 | Impvt. of road from Thiulon to Vachengphai IVR | PWD | Tamenglong | 29.98 | 0.00 | State Plan | 16/03/2020 | 2018-2019 | Project Status |
7200 | TML/Old-New Lenglong/42 | Impvt. of road from Old Lenglong to New Lenglong IVR | PWD | Tamenglong | 29.93 | 0.00 | State Plan | 16/03/2020 | 2018-2019 | Project Status |