Project Updates
Showing 141-160 of 32,417 items.
#Project CodeProject NameDepartmentDistrictPhaseProgress StatusApprove Date
     
141100/1/2015-Law(14FC)/ADRCentre(1st&2ndfloor)Construction of ADR Centre at Lamphelpat Phase II (SH:-First and second floor).PWDImphal-West210008/11/2017
142BD-II/AE-III/Qtr.No.15 Ex-CMRenovation of Qtr.No.15 at Babupara.(Ex-CM)PWDImphal-WestI10031/08/2021
143100/1/2015-Law(14FC)/ADRCentre(1st&2ndfloor)Construction of ADR Centre at Lamphelpat Phase II (SH:-First and second floor).PWDImphal-West210008/11/2017
144MSPCLB19Construction of 132 kV Double Ckt(3rd Circuit) strung on double circuit towers from 132 kV Yurembam S/S (State) to Yurembam S/S (PGCI)POWER (MSPCL)Imphal-WestA100
145TBL/Darpan/Plan/17Impvt. of Khangabok Sorok Wangma RoadPWDThoubal110023/03/2018
146BD-II/AE-III/Beautification SanjenthongBeautification and steel grill fencing at Sanjenthong Officer ColonyPWDImphal-East310020/02/2025
147KCG/DARPAN/ROAD(NP)/75M/O road from Bamon Machin to Tombi MachinPWDKakching2nd10027/08/2024
148KCG/DARPAN/Bldg(P)/87Construction of compound wall fencing (left out portion)at SDO, Waikhong,Kakching District.PWDKakching2nd phase100
149TBL/Darpan/RIDF/9Champa Bridge over Wangjing river at HeirokPWDThoubal210025/01/2019
150MSPCLC5Installation of 2x5 MVA, 33/11 kV Sub-Station with associated 33 kV line at Nungbi KhullenPOWER (MSPCL)UkhrulX10015/03/2018
151KCG/DARPAN/BLDG(P)/2020/03Construction of Toilet Complex in DC office and left out fencing of the DC Complex at Kakching.PWDKakching2nd10005/11/2024
152TBL/Darpan/Plan/17Impvt. of Khangabok Sorok Wangma RoadPWDThoubal110023/03/2018
153BD-II/AE-III/Children park at SanjenthongImpvt.of Children Park at SanjenthongPWDImphal-East210020/02/2025
154BD-II/AE-III/Beautification SanjenthongBeautification and steel grill fencing at Sanjenthong Officer ColonyPWDImphal-East310020/02/2025
155EE/SHD/Land slip Thonglang Atongba IT RoadImpvt. of IT road SH Clearing of land slip 55 m at Thonglang Atongba I.T. roadPWDKangpokpi2020 202110011/03/2026
156MSPCLB23Construction of 132 kV SC transmission line from Yurembam to Yaingangpokpi 132 kV Sub-StationPOWER (MSPCL)Imphal-WestXyz10003/06/2021
157BD-II/AE-III/Beautification SanjenthongBeautification and steel grill fencing at Sanjenthong Officer ColonyPWDImphal-East310020/02/2025
158KCG/DARPAN/ROAD(P)/56Improvement of left out portion of Uya roadPWDKakching3rd10021/01/2025
159BD-II/AE-III/Qtr.No.15 Ex-CMRenovation of Qtr.No.15 at Babupara.(Ex-CM)PWDImphal-WestI10005/02/2025
160MSPCLC5Installation of 2x5 MVA, 33/11 kV Sub-Station with associated 33 kV line at Nungbi KhullenPOWER (MSPCL)UkhrulX10015/03/2018