Project Updates
Showing 241-260 of 83,931 items.
#Project CodeProject NameDepartmentDistrictPhaseProgress StatusApprove Date
     
241IWD/Wapokpi-Changangei/100Impvt. of road from Wapokpi at Langjing Bazar to Changangei connecting NH-150PWDImphal-West----completed08/10/2024
242IED/Chandam Leirak-Chandam Mayai/911Impvt. of road from Chandam Leirak to Chandam Mayai LeikaiPWDImphal-East----Completed 02/09/2024
243IED/Heingang CD Block/781Constn. of Heingang CD Block (SH: Constn. of Bank Type-IV Qtr)-PWDImphal-East----completed30/10/2024
244SE-I/DAR/23-24/IE-R1.46 Langdum to Keirao RdImprovement of road at Langdum to Keirao Road.PWDImphal-East----100%
245IED/In & around Nagaram/752Impvt. of road in and around Nagaram i/c construction of pucca line drain near Little Clinic Hospital approach road.PWDImphal-East----Completed23/08/2024
246IED/Canchipur-Irilbung/234Impvt. of road from Canchipur MU gate (NH-39) to Irilbung via Jubraj Palli, Koirou, Bashikhong, Panthoibi Bazar and Konok Khongnangkhong (12.92 Km ..PWDImphal-East----On going 85 pc completed14/10/2024
247SE-I/DAR/23-24/IE-R1.66 Nandeibam Leikai Improvement of Nandeibam Leikai Tokpram Leirak,Ward No. 18PWDImphal-East----completed 30/08/2024
248IED/NH39-Kakwa Bazar-Ningomthong bridge/233Impvt. of road from NH-39 (NH-2) Kakwa Bazar to Ningomthong Bridge via Lilando Lampak, Nongmeikapam Leirak, Sairom Leirak, Beni Leirak, Thongbam ....PWDImphal-East----Completed14/10/2024
249SE-I/DAR/22-23/IW/Rc.134 Tengdonyan AwangConstruction of 2 nos of RCC slab culvert at Tendongyan and Awang LeikinthabiPWDImphal-West----In Progress
250BRD/Bridge-Uchekon Takhok Mapal/25Constn. of RCC Bridge Kongba River at Uchekon Takhok MapalPWDImphal-East----Completed
251SE-I/DAR/23-24/IE-R1.49 Keirao Warok ChingImprovement of road at Keirao Warok Ching approach road.PWDImphal-East----100%
252SE-I/DRP/IE/22-23/R1.35 Uchekon NongchupImprovement of road and drain at Uchekon NongchupPWDImphal-East----Completed20/08/2024
253IED/Western side-Thambalkhong thong-angom/880Impvt. of road along western side of Iril river fromThambalkong thong to angom thongPWDImphal-East----Completed
254SE-I/DAR/23-24/IE-R1.60 Khongman MangjilImpt of road from Khongman Mangjil to Sangaipat including Southern side of Nahabam roadPWDImphal-East----Completed 30/08/2024
255IED/2m RCC Slab-Godown Gate/329Construction of 2.0m span RCC Slab Culvert at Koirengei FCI Godown Gate approach road.PWDImphal-East----Completed27/08/2024
256IED/Yairipok Keithelmanbi(0-13 km)/189M/o of Yairipok Keithelmanbi road via Thoubal Barrage (0.00-13 Km)PWDImphal-East----Completed12/11/2024
257SE-I/DAR/22-23/IW/R1.139 HeibongpokpiImprovement of IVR from Sairem Leirak and Naorem Leirak, HeibongpokpiPWDImphal-West----Completed08/08/2024
258IWD/iroishemba Chingangbam-Khaidem/282Improvement of road at Iroishemba Chingangbam and Khaidem LeirakPWDImphal-West----in progress
259IED/Kongba Kshetri Leikai-Khunou/332Impvt. of road from Kongba Kshetri Leikai to KhunouPWDImphal-East----In Progress Drainwork completed 95 pc14/10/2024
260IED/Keibi Kumuda Taretkhul/878Improvement of Keibi Kumuda Taretkhul IVR Ring roadPWDImphal-East----On going16/08/2024