Progress
 
 
Project Details
DAR-2020-000618
MWSP_PHED_NDB
Manipur Water Supply Project (NDB)
21/08/2019
PHED
All Manipur
305458.00
202500
EAP
ongoing
1
24.80748517734833,93.94173431396518
Manipur Water Supply Project is an EAP project with NDB funding implemented by Public Health Engineering department, Govt. of Manipur. The project comprises of 3 (Three) components viz. (i) Integrated water supply project for Imphal Planning Area, Phase III, (ii) Providing Drinking Water to Other Towns (25 nos) & (iii) Providing Dringking Water to Rural Areas (1731 Habitations) of Manipur State.
Progress Update : 05/03/2025
ongoing
1
arun123
24.80748517734833,93.94173431396518
24.5021581,93.7755229
37.876888795892
202500
Augmentation of moirang water supply scheme SSF filter bed 2 jacketing work package no OTP P-7 W

Progress Update : 05/03/2025
ongoing
pkg.VII
rishi
24.80748517734833,93.94173431396518
24.5961499,94.0420132
25.588660723553
202500
Inlet well ,fash mixer aerator construction work is in progress at wangjing site

Progress Update : 05/03/2025
ongoing
pkg.VIi
rishi
24.80748517734833,93.94173431396518
24.5959462,94.0417083
25.597297663445
202500
step type intake construction work is in progress at wangjing site

Progress Update : 05/03/2025
ongoing
pkg.VII
rishi
24.80748517734833,93.94173431396518
24.5960977,94.0412648
25.564164774098
202500
DI pipe unloaded at wangjing site

Progress Update : 05/03/2025
ongoing
1
arun123
24.80748517734833,93.94173431396518
24.4326604,93.8002485
44.06215627918
202500
Augmentation of kumbi water supply scheme SSF 1st lift wall steel binding package no OTP P-7W

Progress Update : 05/03/2025
ongoing
Pkg.VII
rishi
24.80748517734833,93.94173431396518
24.595753,94.0421278
25.633776683163
202500
Filter and chemical house construction work is in progress at wangjing site

Progress Update : 05/03/2025
Completed
1
arun123
24.80748517734833,93.94173431396518
24.7089475,93.8361804
15.284916757105
202500
OHT Completed at kongkham water supply scheme pakage no. OTP P-VII W

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.7999722,93.9359309
1.0202646833049
202500
P.G installed at Keishampat OHT

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.8002209,93.9361178
0.98679273956027
202500
EFM 200mm installed at Keishampat OHT

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.8000489,93.9361224
1.0022446167876
202500
RIO panel, P.T installed at Keishampat OHT

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.7999722,93.9359309
1.0202646833049
202500
P.G installed at Keishampat OHT

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.7999722,93.9359309
1.0202646833049
202500
P.G installed at Keishampat OHT

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.8000572,93.936127
1.0012208654072
202500
ULT installed at Keishampat Z/R

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.8001317,93.9361
0.9959521234578
202500
RIO PANEL, P.T installed at Keishampat Z/R

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.8001958,93.9361347
0.98810179458244
202500
P.G installed at Keishampat Z/R

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.8001828,93.9361442
0.98874033264323
202500
EFM 200mm installed at Keishampat Z/R

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.79132,93.92248
2.6471959163997
202500
ULT installed at Kwakeithel Thiyam Leikai Z/R

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.7912728,93.9224843
2.6504441940504
202500
RIO panel, P.T installed at Kwakeithel Thiyam Leikai Z/R

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.7913208,93.9223313
2.6581743517224
202500
P.G installed at Kwakeithel Thiyam Leikai Z/R

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.7912836,93.9223554
2.6591831798909
202500
EFM 200mm installed at Kwakeithel Thiyam Leikai Z/R

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.7913078,93.9222979
2.6616358854614
202500
RIO panel, P.T installed at Kwakeithel Thiyam Leikai OHT

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.7911653,93.9223371
2.6694667649722
202500
PG installed at Kwakeithel Thiyam Leikai OHT

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.7905775,93.9224694
2.7047042088978
202500
EFM 200mm installed at Kwakeithel Thiyam Leikai OHT

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.7872145,93.9128023
3.688945480951
202500
RIO Panel installed at Sangaiprou OHT

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.7871546,93.9129025
3.6850265139944
202500
P.G installed at Sangaiprou OHT

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.7871472,93.9128666
3.688393409005
202500
EFM 300 installed at Sangaiprou OHT

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.787025,93.912905
3.6936862342789
202500
RIO pane, P.T Installed at Sangaiprou ESR

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.787218,93.9126741
3.6989608053031
202500
ULT installed at Sangaiprou ESR

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.7870403,93.9128092
3.7002635953906
202500
EFM 300mm installed at Sangaiprou ESR

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.8079342,93.9668326
2.5336398115868
202500
RIO panel, P.T installed for Porompat Chingkheiching feed

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.8004363,93.9736258
3.3129217728713
202500
P.G, PT, RIO panel Installed hai at Rahmania 1

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.8004363,93.9737199
3.3221506343751
202500
EFM 100mm installed Rahmania 1

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.807078,93.9805946
3.9224091886874
202500
RIO panel, P.T installed at Porompat Intake

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.8072431,93.9804453
3.9071692406911
202500
P.G installed at Porompat Intake

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.8073723,93.9806498
3.927734592818
202500
EFM 300mm installed at Porompat Intake

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.8082489,93.966256
2.4764053627776
202500
EFM 400mm installed at Porompat Phase 2

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.8079342,93.9668326
2.5336398115868
202500
RIO panel, P.T installed for Porompat Chingkheiching feed

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.8081207,93.9674251
2.5939090898437
202500
RIO panel, ULT Installed at Porompat GLSR 2

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.8081733,93.9671567
2.5669970186589
202500
ULT installed at Porompat GLSR 1

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.808035,93.9670189
2.5526820712533
202500
RIO Panel installed at Porompat GLSR 1

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.807605,93.96674
2.5238403324337
202500
RIO PANEL, P.T installed at Porompat OHT 2

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.8077903,93.9666484
2.5147870216667
202500
RIO Panel, P.T installed at Porompat OHT 1

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.8083198,93.9668679
2.5384036300829
202500
P.G installed at Porompat Chingkheiching feed

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.8083383,93.9669065
2.5423726130923
202500
EFM 200mm installed at Porompat Chingkheiching feed

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.8075718,93.9665749
2.5071605786255
202500
P.G installed at Porompat OHT 2

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.8075674,93.9665406
2.5036969449498
202500
EFM 300mm installed at Porompat OHT 2

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.8075184,93.9665813
2.507791287959
202500
P.G installed at Porompat OHT 1

Progress Update : 12/10/2024
Active
Phase-lll Package-IWS P-V(W)-SCADA
Naresh55
24.80748517734833,93.94173431396518
24.8074817,93.9666983
2.5195976968443
202500
EFM 300mm installed at Porompat OHT 1

Progress Update : 18/09/2024
Ongoing
Package IX
arun123
24.80748517734833,93.94173431396518
24.7080092,93.8478763
14.565335652172
202500
Sanapat_pumphouse_NDB_pkg_IX

Progress Update : 18/09/2024
Ongoing
Package IX
arun123
24.80748517734833,93.94173431396518
24.7080092,93.8478763
14.565335652172
202500
Sanapat_pumphouse_NDB_pkg_IX

Progress Update : 18/09/2024
Ongoing
4
arun123
24.80748517734833,93.94173431396518
24.6890654,93.8740485
14.83525306847
0
Thounaojam_NDB_Pkg_IX

Progress Update : 18/09/2024
Ongoing
package IX
arun123
24.80748517734833,93.94173431396518
24.7253801,93.8494665
13.043133711023
202500
Thiyam_NDB_Pkg_IX

Progress Update : 18/09/2024
Ongoing
4
arun123
24.80748517734833,93.94173431396518
24.582327,93.7474764
31.809859619561
0
Upokpi_Aerator_NDB_pkgIX

Progress Update : 09/09/2024
ongoing
pkg.VII
rishi
24.80748517734833,93.94173431396518
24.6735782,94.0472629
18.309797381977
202500
CWR construction work is completed at Yaripok site

Progress Update : 09/09/2024
ongoing
pkg.VII
rishi
24.80748517734833,93.94173431396518
24.6735056,94.0470802
18.305635919055
202500
aerator construction work completed at Yaripok site

Progress Update : 09/09/2024
ongoing
pkg.VII
rishi
24.80748517734833,93.94173431396518
24.673552,94.0469497
18.293779302697
202500
filter and chemical house construction work is in progress at Yaripok site

Progress Update : 09/09/2024
ongoing
pkg.VII
rishi
24.80748517734833,93.94173431396518
24.6735584,94.0472097
18.30846218892
202500
Over head tank construction work completed at Yaripok site

Progress Update : 09/09/2024
ongoing
pkg.VII
rishi
24.80748517734833,93.94173431396518
24.6734536,94.0471185
18.312590168975
202500
Clarifiocculator construction work completed at Yaripok site

Progress Update : 31/08/2024
ongoing
Pkg.VII
rishi
24.80748517734833,93.94173431396518
24.6732633,94.047235
18.336651578071
0
Construction of Clarifloccuator at Yaripok Town

Progress Update : 31/08/2024
ongoing
Pkg.VII
rishi
24.80748517734833,93.94173431396518
24.6734163,94.0469226
18.304479177249
202500
Cwr construction work completed at Yaripok site

Progress Update : 31/08/2024
ongoing
Pkg.VII
rishi
24.80748517734833,93.94173431396518
24.6734991,94.0470142
18.302351887152
202500
aerator construction work almost completed

Progress Update : 31/08/2024
ongoing
pkg.VII
rishi
24.80748517734833,93.94173431396518
24.6735937,94.0470918
18.298343869969
202500
over head tank construction work completed at Yaripok site

Progress Update : 31/08/2024
ongoing
PKG. Vii
rishi
24.80748517734833,93.94173431396518
24.64753,94.01205
19.150709023486
202500
SSF pile work is in progress at kshetri leikai site.

Progress Update : 31/08/2024
ongoing
PKG.vii
rishi
24.80748517734833,93.94173431396518
24.6476617,94.0115817
19.11960856167
202500
ST 3rd lift wall shuttering work is in progress at kshetri leikai site.

Progress Update : 31/08/2024
ongoing
PKG.VII
rishi
24.80748517734833,93.94173431396518
24.6479617,94.012075
19.107073022227
202500
CWR slab shuttering work is in progress at kshetri leikai site

Progress Update : 31/08/2024
ongoing
PKG.VII
rishi
24.80748517734833,93.94173431396518
24.64773,94.0115984
19.113172152117
202500
ST 3rd lift wall shuttering work is in progress at kshetri leikai site.

Progress Update : 31/08/2024
ongoing
PKG.VII
rishi
24.80748517734833,93.94173431396518
24.647685,94.01172
19.122358767571
202500
SSF pile work is in progress at kshetri leikai site.

Progress Update : 31/08/2024
ongoing
PKG.VII
rishi
24.80748517734833,93.94173431396518
24.64773,94.0115984
19.113172152117
202500
ST 3rd lift wall shuttering work is in progress at kshetri leikai site.

Progress Update : 31/08/2024
ongoing
PKG.VII
rishi
24.80748517734833,93.94173431396518
24.6478417,94.012095
19.120211782965
202500
CWR slab shuttering work is in progress at kshetri leikai site.

Progress Update : 27/05/2024
ongoing
pkg.VII
rishi
24.80748517734833,93.94173431396518
24.6513539,93.9892176
18.010330959255
202500
OHT CONSTRUCTION WORK IS COMPLETED AT OKRAM SITE

Progress Update : 27/05/2024
ongoing
pkg.VII
rishi
24.80748517734833,93.94173431396518
24.5964801,94.0414269
25.531525857132
202500
OHT CONSTRUCTION WORK COMPLETED AT WANGJING SITE

Progress Update : 27/05/2024
ongoing
pkg.VII
rishi
24.80748517734833,93.94173431396518
24.595744,94.0420645
25.632166948659
202500
CLF CONSTRUCTION WORK COMPLETED AT WANGJING SITE

Progress Update : 17/05/2024
Augmentation of kumbi water supply scheme ongoing
1
arun123
24.80748517734833,93.94173431396518
24.4327273,93.8003764
44.050924073182
0
Augmentation of kumbi water supply scheme ST buffle wall 4th lift shuttering work is ongoing

Progress Update : 14/05/2024
On Going
PKG VII
rishi
24.80748517734833,93.94173431396518
24.7097985,93.9555275
10.95066083646
0
Brick Wall Fencing,Lilong,Arapti

Progress Update : 14/05/2024
On Going
PKJ. VII
rishi
24.80748517734833,93.94173431396518
24.7057329,93.9568229
11.415908668401
0
SSF Repairing work ,Lilong,Arapti

Progress Update : 29/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3328137,93.6954095
58.361062162826
119700
Casting bottom dome and bottom beam for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 29/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3320886,93.694946
58.454008973596
119700
Casting bottom dome and bottom beam for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 28/03/2023
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7760313,93.9266403
3.8148175075537
119700
Chingtham leikai W/S zone, pipe lying at Chingtham leikai

Progress Update : 28/03/2023
Onging
Package lX
darpang
24.80748517734833,93.94173431396518
24.5321727,93.8621946
31.64927628166
119700
Chingthi Ching WSS ,IW PHED, co sr, pump house, sff & Rep of ST

Progress Update : 28/03/2023
Onging
Package lX
darpang
24.80748517734833,93.94173431396518
24.5322518,93.8669619
31.521862093195
119700
Chingthi Ching WSS ,IW PHED

Progress Update : 26/03/2023
Ongoing
Phase 1
bantandb
24.80748517734833,93.94173431396518
24.9810238,93.8763144
20.392624034738
0
Constn of Sekmai Ningthouba leikai

Progress Update : 24/03/2023
On going
ix
bushndb
24.80748517734833,93.94173431396518
24.880903,93.8936936
9.4939726985749
0
CO of chowkidar Qtr at khamran

Progress Update : 24/03/2023
On going
ix
bushndb
24.80748517734833,93.94173431396518
24.880903,93.8936936
9.4939726985749
119700
CO raw water storage at khamran

Progress Update : 24/03/2023
On going
ix
bushndb
24.80748517734833,93.94173431396518
24.880903,93.8936936
9.4939726985749
119700
CO raw water storage at khamran

Progress Update : 24/03/2023
On going
ix
bushndb
24.80748517734833,93.94173431396518
24.8791992,93.8884702
9.6159234187424
0
Construction of SR at khamran

Progress Update : 24/03/2023
On going
ix
bushndb
24.80748517734833,93.94173431396518
24.8812732,93.8936936
9.5293852400409
119700
Construction of SR at khamran

Progress Update : 24/03/2023
On going
ix
bushndb
24.80748517734833,93.94173431396518
24.877225,93.8927387
9.1961940350164
119700
Construction of SSF at khamran

Progress Update : 24/03/2023
On going
ix
bushndb
24.80748517734833,93.94173431396518
24.877225,93.8927387
9.1961940350164
119700
Construction of SSF at khamran

Progress Update : 24/03/2023
On going
iv
bushndb
24.80748517734833,93.94173431396518
24.820872,93.8666437
7.72322571452
119700
Construction of brick wall fencing

Progress Update : 24/03/2023
On going
iv
bushndb
24.80748517734833,93.94173431396518
24.8208884,93.8660074
7.7865977675687
0
Construction of brick wall fencing

Progress Update : 24/03/2023
On going
iv
bushndb
24.80748517734833,93.94173431396518
24.820872,93.8666437
7.72322571452
119700
Construction of SSF

Progress Update : 24/03/2023
On going
iv
bushndb
24.80748517734833,93.94173431396518
24.820872,93.8666437
7.72322571452
119700
Construction of SSF

Progress Update : 24/03/2023
On going
iv
bushndb
24.80748517734833,93.94173431396518
24.820872,93.8666437
7.72322571452
119700
Construction of OHT

Progress Update : 24/03/2023
On going
iv
bushndb
24.80748517734833,93.94173431396518
24.820872,93.8666437
7.72322571452
119700
Construction of SR

Progress Update : 24/03/2023
On going
iv
bushndb
24.80748517734833,93.94173431396518
24.820872,93.8666437
7.72322571452
119700
Construction of ST

Progress Update : 24/03/2023
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.788058,93.9255343
2.709217165822
119700
Chingtham leikai W/S zone, pipe lying at Akham Leikai

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3542796,93.7013438
55.947593588303
119700
Putty & Primer painting for Admin. building at Bijang Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3541162,93.7014514
55.95924070152
119700
Putty & Primer painting for Admin. building at Bijang Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3541398,93.7011365
55.970707829388
119700
Putty & Primer painting for Admin. building at Bijang Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3542795,93.7016437
55.93443612767
119700
Putty &Primer painting for OHT at Bijang Churachandpur Manipur

Progress Update : 21/03/2023
Ongoing
1
telein123
24.80748517734833,93.94173431396518
24.5820822,93.7423981
32.15010992181
0
Package-IX/Upokpi Wss/Construction of ST

Progress Update : 21/03/2023
Ongoing
1
telein123
24.80748517734833,93.94173431396518
24.5759951,93.7636668
31.402438865072
0
Package-IX/Upokpi Wss/ Construction of SSF

Progress Update : 21/03/2023
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.5660277,93.7620793
32.407029598228
0
Package IX, Ningthoukhong kha khunou WSS,Settling tank

Progress Update : 21/03/2023
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.5623529,93.7608093
32.817770645317
0
Package IX, Ningthoukhong kha khunou WSS,SLOW SAND FILTER

Progress Update : 21/03/2023
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.5623529,93.7608093
32.817770645317
0
Package IX, Ningthoukhong kha khunou WSS,CWR

Progress Update : 21/03/2023
Ongoing
1
telein123
24.80748517734833,93.94173431396518
24.52831,93.7509483
36.540229612455
119700
Package-IX/Sunusiphai wss/construction of ST

Progress Update : 21/03/2023
Ongoing
1
telein123
24.80748517734833,93.94173431396518
24.5207206,93.7506506
37.275635769796
0
Package-IX/Sunusiphai wss/Construction of CWR

Progress Update : 21/03/2023
Ongoing
PKG-VII
rishi
24.80748517734833,93.94173431396518
24.5964333,94.0415417
25.540883870003
119700
Construction of Overhead tank at wanging site.

Progress Update : 21/03/2023
Ongoing
PKG-VII
rishi
24.80748517734833,93.94173431396518
24.5964333,94.0415417
25.540883870003
119700
Construction of Overhead tank at wanging site.

Progress Update : 21/03/2023
Ongoing
PKG-VII
rishi
24.80748517734833,93.94173431396518
24.5964333,94.0415417
25.540883870003
119700
Construction of Overhead tank at wanging site.

Progress Update : 21/03/2023
Ongoing
PKG-VII
rishi
24.80748517734833,93.94173431396518
24.5959278,94.0415064
25.591138942851
119700
Construction of Overhead tank at wanging site.

Progress Update : 21/03/2023
Upgradation of Ningthoukhong water supply scheme
1
arun123
24.80748517734833,93.94173431396518
24.5871373,93.7627143
30.451821855515
119700
Ningthoukhong Chowkidar quarter is in progress package no.7

Progress Update : 21/03/2023
Upgradation of Ningthoukhong water supply scheme
1
arun123
24.80748517734833,93.94173431396518
24.5852988,93.7370204
32.217908433199
119700
Ningthoukhong Slow sand filter structure is in progress package no.7

Progress Update : 21/03/2023
Upgradation of Ningthoukhong water supply scheme
1
arun123
24.80748517734833,93.94173431396518
24.5852988,93.7370204
32.217908433199
119700
Ningthoukhong Settling Tank structure completed package no.7

Progress Update : 21/03/2023
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.4948899,93.7458894
39.99709918577
119700
Package IX,Ngangkhalawai WSS, impounding pond

Progress Update : 21/03/2023
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.4948899,93.7458894
39.99709918577
119700
Package IX,Ngangkhalawai WSS, CRW

Progress Update : 21/03/2023
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.5145261,93.7312911
38.900644743631
119700
Package IX,Ngangkhalawai WSS, slow sand filter

Progress Update : 21/03/2023
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.5145261,93.7312911
38.900644743631
119700
Package IX,Ngangkhalawai WSS, settling tank

Progress Update : 21/03/2023
Ongoing
Phase 1
arun123
24.80748517734833,93.94173431396518
24.6967127,93.8113155
18.031180714804
119700
SSF walkway steel binding is in progress at Oinam Zone-2 water supply Scheme

Progress Update : 21/03/2023
Phase 1
Ongoing
arun123
24.80748517734833,93.94173431396518
24.6967127,93.8113155
18.031180714804
119700
CWR slab beam shuttering is in progress at Oinam Zone-2 water supply Scheme.

Progress Update : 21/03/2023
Ongoing
PKG-VII
rishi
24.80748517734833,93.94173431396518
24.5716904,94.0866361
30.027834859021
119700
Construction of cascade Aerator at heirok site.

Progress Update : 21/03/2023
Ongoing
PKG-VII
rishi
24.80748517734833,93.94173431396518
24.568185,94.0879467
30.43288450192
119700
Construction of Slow sand filter at heirok site.

Progress Update : 21/03/2023
Ongoing
Phase 1
arun123
24.80748517734833,93.94173431396518
24.6769436,93.7871679
21.31445110119
119700
Plaster work for Chowkidar Quarter is in progress at Oinam Zone-2 water supply Scheme.

Progress Update : 21/03/2023
Ongoing
PKG-VII
rishi
24.80748517734833,93.94173431396518
24.5716904,94.0866361
30.027834859021
119700
Construction of settling tank at heirok site.

Progress Update : 21/03/2023
Ongoing
Pkg.VII
rishi
24.80748517734833,93.94173431396518
24.6916795,93.9350916
12.893842991266
119700
Construction of CWR at turel ahanbi

Progress Update : 21/03/2023
Ongoing
PKG-VII
rishi
24.80748517734833,93.94173431396518
24.5685287,94.0877255
30.388615627396
119700
Construction of CWR at heirok site.

Progress Update : 21/03/2023
Ongoing
PKG-VII
rishi
24.80748517734833,93.94173431396518
24.5746826,94.0837145
29.593528165397
119700
Construction of CWR at heirok site.

Progress Update : 21/03/2023
Ongoing
Pkg.VII
rishi
24.80748517734833,93.94173431396518
24.6920499,93.9350916
12.852714263768
119700
CWR SLAB SHUTTERING ALMOST COMPLETED AT TUREL AHANBI SITE

Progress Update : 21/03/2023
Ongoing
Phase 1
arun123
24.80748517734833,93.94173431396518
24.6769436,93.7871679
21.31445110119
119700
Chowkidar Quarter plaster work is in progress at Oinam Zone-2 water supply Scheme.

Progress Update : 21/03/2023
Ongoing
Phase 1
arun123
24.80748517734833,93.94173431396518
24.6769436,93.7871679
21.31445110119
119700
CWR raft completed at kab SSF walkway steel binding is in progress at Oinam Zone-2 water supply Scheme.

Progress Update : 21/03/2023
Ongoing
Phase 1
arun123
24.80748517734833,93.94173431396518
24.6769436,93.7871679
21.31445110119
119700
CWR raft completed at kab CWR slab beam shuttering is in progress at Oinam Zone-2 water supply Scheme.

Progress Update : 21/03/2023
Ongoing
PKG VII
rishi
24.80748517734833,93.94173431396518
24.6513822,93.988321
17.983395468634
119700
OHT 3RD BRACE BEAM

Progress Update : 21/03/2023
Ongoing
PKG-VII
rishi
24.80748517734833,93.94173431396518
24.6517105,93.9899155
17.991048351496
119700
Thoubal okram OHT 3rd brace beam in progress

Progress Update : 21/03/2023
Ongoing
PKG -VII
rishi
24.80748517734833,93.94173431396518
24.6521628,93.9896296
17.934825572994
119700
Thoubal Okram OHT brace beam in progress

Progress Update : 21/03/2023
Ongoing
Phase 1
arun123
24.80748517734833,93.94173431396518
24.7296114,93.799558
16.763612463822
0
CWR raft completed at kabowakching water supply Scheme.

Progress Update : 21/03/2023
Ongoing
Phase 1
arun123
24.80748517734833,93.94173431396518
24.7296114,93.799558
16.763612463822
119700
CWR raft completed at kabowakching water supply Scheme.

Progress Update : 21/03/2023
Ongoing
Phase 1
arun123
24.80748517734833,93.94173431396518
24.7296114,93.799558
16.763612463822
119700
CWR raft completed at kabowakching water supply Scheme.

Progress Update : 21/03/2023
Ongoing
Phase 1
arun123
24.80748517734833,93.94173431396518
24.7098381,93.7903446
18.749223462971
119700
ST 2nd lift wall shuttering is going on at kabowakching water supply Scheme.

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326823,93.6954154
58.374026221536
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 21/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3326633,93.69546
58.374013450106
119700
Shuttering & reinforcement work for OHT at Lamka college compound Churachandpur Manipur

Progress Update : 17/03/2023
Active
Pakage ll
priyo
24.80748517734833,93.94173431396518
24.7869185,93.9466728
2.340499205063
119700
Brahamapur mandalay lairak 100 mm dia.

Progress Update : 16/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3322832,93.6922021
58.553470255195
119700
Casting OHT top dome at Ebenezer compound Churachandpur Manipur

Progress Update : 15/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.332497,93.6923331
58.526300744815
119700
Reinforcement work for top dome at Ebenezer compound Churachandpur Manipur

Progress Update : 15/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3327653,93.6923154
58.500141879645
119700
Reinforcement work for top dome at Ebenezer compound Churachandpur Manipur

Progress Update : 15/03/2023
Active
Pakage ll
priyo
24.80748517734833,93.94173431396518
24.7852763,93.9457585
2.5025804886988
119700
Akampat mekhu leirak 100mm dia.

Progress Update : 14/03/2023
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.772697,93.9263013
4.1700116554823
119700
Chingtham leikai W/S zone, pipe lying at Ningthemcha Karong

Progress Update : 14/03/2023
Active
Pakage ll
priyo
24.80748517734833,93.94173431396518
24.7880972,93.9432753
2.1613451430622
119700
Brahmapur laipubam leikai. 100mm dia

Progress Update : 14/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3380367,93.6763017
58.694207635821
119700
SSF Repairing at Zone-ii WTP Bungmual Churachandpur Manipur

Progress Update : 14/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3426975,93.6879834
57.698687623761
119700
Pump House at Head Quarter veng Churachandpur Manipur

Progress Update : 13/03/2023
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7678992,93.9245121
4.7324432899735
119700
Chingtham leikai W/S zone, pipe lying at Mongsangei

Progress Update : 10/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3635147,93.7010991
55.035065246124
119700
PCC Work for 1ml GLSR at DC complex Churachandpur Manipur

Progress Update : 10/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3643148,93.7015707
54.934154074779
119700
E/w excavation for 1ml GLSR at DC complex Churachandpur Manipur

Progress Update : 09/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3374322,93.6769843
58.722519890763
119700
Renovation of Zone ii WTP at Churachandpur Manipur

Progress Update : 09/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3377529,93.6763967
58.71789601596
119700
Renovation of Zone ii WTP at Churachandpur Manipur

Progress Update : 09/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3367685,93.6767437
58.799326276385
119700
Renovation of Zone ii WTP at Churachandpur Manipur

Progress Update : 06/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3287705,93.7075554
58.25813737988
119700
OHT pile Cap casting at PT sport complex Churachandpur Manipur

Progress Update : 06/03/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3309488,93.7059869
58.101742759985
119700
OHT pile Cap casting at PT SPORT COMPLEX CHURACHANDPUR Manipur

Progress Update : 03/03/2023
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7844977,93.9269707
2.9586695487299
119700
Chingtham leikai W/S zone, pipe lying at Laishram Leikai

Progress Update : 28/02/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3576716,93.7017902
55.588275941018
119700
Adm. Building ceiling work

Progress Update : 28/02/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3545975,93.7014972
55.909004618933
119700
Adm. Building ceiling work

Progress Update : 28/02/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3546092,93.7015037
55.907546862161
119700
Adm. Building ceiling work

Progress Update : 22/02/2023
Active
Package-II
Laksmee
24.80748517734833,93.94173431396518
24.8115118,93.9650373
2.3941512185211
119700
0.2MLD ESR Laiwangma Shift II TV tower

Progress Update : 22/02/2023
Active
Package-II
Laksmee
24.80748517734833,93.94173431396518
24.8155034,93.9646867
2.4821341290984
119700
0.2MLD ESR Laiwangma Shift II TV tower

Progress Update : 22/02/2023
Active
Package-II
Laksmee
24.80748517734833,93.94173431396518
24.8115243,93.9650378
2.3944609713994
119700
0.8MLD OHT Laiwangma Shift II

Progress Update : 22/02/2023
Active
Pakage-II
priyo
24.80748517734833,93.94173431396518
24.7888296,93.9443664
2.0912501861609
119700
Pipe laying old thumbuthong zone, brahmapur aribam leikai, 100 mm dai

Progress Update : 21/02/2023
On going
Package-VI
korouhanbang
24.80748517734833,93.94173431396518
24.726797,93.9290265
9.0629591239965
119700
Augmentation of Lilong Chajing Water Supply Scheme (SH: Construction of Pre Settling tank at Lilong Chajing Water Supply Scheme)

Progress Update : 21/02/2023
On going
Package-VI
korouhanbang
24.80748517734833,93.94173431396518
24.715393,93.9164224
10.553798453652
119700
Augmentation of Lilong Chajing Water Supply Scheme (SH: Internal fitting of Lilong Haoreibi Water Supply Scheme)

Progress Update : 19/02/2023
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7724247,93.9250105
4.2481874854615
119700
Chingtham leikai W/S zone, pipe lying at School Leirak

Progress Update : 18/02/2023
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7760296,93.9248983
3.8885608664373
119700
Chingtham leikai W/S zone, pipe lying at Chingtham leikai

Progress Update : 17/02/2023
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.830376,93.8571001
8.9124442271934
119700
Laying of 800 mm. Iroisemba hilltop

Progress Update : 14/02/2023
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7753964,93.9212404
4.1242835465261
119700
Chingtham leikai W/S zone, pipe lying at Konjeng Leikai

Progress Update : 10/02/2023
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7734485,93.9199528
4.3768571065303
119700
Chingtham leikai W/S zone, pipe lying at Konjeng Leikai

Progress Update : 06/02/2023
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7737503,93.919455
4.3734984719965
119700
Chingtham leikai W/S zone, pipe lying at Konjeng Leikai

Progress Update : 04/02/2023
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77279,93.922013333333
4.341091247655
119700
Chingtham leikai W/S zone, pipe lying at Chingtham leikai

Progress Update : 01/02/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3325212,93.692241
58.527885548181
119700
Casting conical wall for OHT at Ebenezer compound Churachandpur Manipur

Progress Update : 30/01/2023
Ongoing
Pkg.VII
rishi
24.80748517734833,93.94173431396518
24.5958367,94.0418222
25.613027013395
119700
Over head tank wanging site

Progress Update : 30/01/2023
Ongoing
Pkg.VII
rishi
24.80748517734833,93.94173431396518
24.5959822,94.040571
25.548505264524
119700
Over head tank wanging site

Progress Update : 30/01/2023
Ongoing
Phase 1 Package-VII
arun123
24.80748517734833,93.94173431396518
24.6989486,93.8167191
17.463831555485
119700
GI and DI Pipes Bishnupur Division

Progress Update : 30/01/2023
Ongoing
Phase 1 Package-VII
arun123
24.80748517734833,93.94173431396518
24.6989434,93.8167228
17.463961260088
119700
GI and DI Pipes Bishnupur Division

Progress Update : 30/01/2023
Ongoing
Pkg.VII
rishi
24.80748517734833,93.94173431396518
24.5957872,94.0419565
25.623441941493
119700
Filter and chemical house wanging site

Progress Update : 30/01/2023
Ongoing
Pkg.VII
rishi
24.80748517734833,93.94173431396518
24.5957878,94.0419793
25.624290721686
119700
Clear water reservoir wanging site

Progress Update : 30/01/2023
Ongoing
Pkg.VII
rishi
24.80748517734833,93.94173431396518
24.5716904,94.0866361
30.027834859021
119700
Cascade Aerator heirok site

Progress Update : 30/01/2023
Ongoing
Pkg.VII
rishi
24.80748517734833,93.94173431396518
24.5716904,94.0866361
30.027834859021
119700
Settling tank heirok site

Progress Update : 30/01/2023
Ongoing
Pkg.VII
rishi
24.80748517734833,93.94173431396518
24.5716904,94.0866361
30.027834859021
119700
Settling tank heirok site

Progress Update : 30/01/2023
Ongoing
Pkg.VII
rishi
24.80748517734833,93.94173431396518
24.5716904,94.0866361
30.027834859021
119700
Slow sand filter heirok site

Progress Update : 30/01/2023
Ongoing
Pkg.VII
rishi
24.80748517734833,93.94173431396518
24.5788507,94.0803586
29.02381051014
119700
Slow sand filter heirok site

Progress Update : 30/01/2023
Ongoing
Pkg.VII
rishi
24.80748517734833,93.94173431396518
24.5788507,94.0803586
29.02381051014
119700
Clear water reservoir Heirok site

Progress Update : 30/01/2023
Ongoing
Pkg.VII
rishi
24.80748517734833,93.94173431396518
24.5788507,94.0803586
29.02381051014
119700
Clear water reservoir Heirok site

Progress Update : 30/01/2023
Ongoing
1
rishi
24.80748517734833,93.94173431396518
24.5716904,94.0866361
30.027834859021
119700
Cascade aerator heirok site

Progress Update : 30/01/2023
Ongoing
1
rishi
24.80748517734833,93.94173431396518
24.5788507,94.0803586
29.02381051014
119700
Settling tank heirok site

Progress Update : 30/01/2023
Ongoing
1
rishi
24.80748517734833,93.94173431396518
24.5788507,94.0803586
29.02381051014
119700
Slow sand filter heirok site

Progress Update : 30/01/2023
Ongoing
1
rishi
24.80748517734833,93.94173431396518
24.5716904,94.0866361
30.027834859021
119700
Slow sand filter heirok site

Progress Update : 30/01/2023
On going
1
rishi
24.80748517734833,93.94173431396518
24.5716904,94.0866361
30.027834859021
119700
Clear water reservoir Heirok site

Progress Update : 30/01/2023
On going
1
rishi
24.80748517734833,93.94173431396518
24.5716904,94.0866361
30.027834859021
119700
Clear water reservoir Heirok site

Progress Update : 30/01/2023
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.7316252,93.7650062
19.735783579723
119700
ST completed at Nambol Treatment site.

Progress Update : 30/01/2023
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.7316252,93.7650062
19.735783579723
119700
Aerator completed at Nambol Treatment site.

Progress Update : 30/01/2023
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.7224547,93.7747808
19.326705539825
119700
CWR casting completed upto slab level at Nambol Treatment site.

Progress Update : 30/01/2023
In progress
Package VII (NDB)
mujibur
24.80748517734833,93.94173431396518
24.6759358,94.0483675
18.163122587157
119700
Pile cape completed at Yairipok (U)

Progress Update : 30/01/2023
Ongoing
Pkg-VII
rishi
24.80748517734833,93.94173431396518
24.7409106,93.9350359
7.4332242756127
119700
DI/GI pipe of thoubal PHE division (6Town)

Progress Update : 30/01/2023
Ongoing
Pkg-VII
rishi
24.80748517734833,93.94173431396518
24.7409346,93.9350423
7.4305080155499
119700
DI/GI pipe of thoubal PHE division (6Town)

Progress Update : 30/01/2023
Ongoing
Pkg-VII
rishi
24.80748517734833,93.94173431396518
24.7409346,93.9350423
7.4305080155499
119700
DI/GI pipe of thoubal PHE division (6Town)

Progress Update : 30/01/2023
Ongoing
Pkg-VII
rishi
24.80748517734833,93.94173431396518
24.7409346,93.9350423
7.4305080155499
119700
DI/GI pipe of thoubal PHE division (6Town)

Progress Update : 30/01/2023
Ongoing
Pkg-VII
rishi
24.80748517734833,93.94173431396518
24.7409346,93.9350423
7.4305080155499
119700
DI/GI pipe of thoubal PHE division (6Town)

Progress Update : 30/01/2023
Ongoing
Pkg-VII
rishi
24.80748517734833,93.94173431396518
24.7409346,93.9350423
7.4305080155499
119700
DI/GI pipe of thoubal PHE division (6Town)

Progress Update : 30/01/2023
Ongoing
Pkg-VII
rishi
24.80748517734833,93.94173431396518
24.7409387,93.9350464
7.4300164003323
119700
DI/GI pipe of thoubal PHE division (6Town)

Progress Update : 30/01/2023
Ongoing
Pkg-VII
rishi
24.80748517734833,93.94173431396518
24.7409387,93.9350464
7.4300164003323
119700
DI/GI pipe of thoubal PHE division (6Town)

Progress Update : 30/01/2023
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.7130044,93.7970162
17.996310658214
119700
ST 1st lift wall casting completed

Progress Update : 30/01/2023
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.712666,93.7957453
18.122533139133
119700
Aerator slab casting done

Progress Update : 30/01/2023
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.7254962,93.8011467
16.86948852448
119700
CWR PCC Completed

Progress Update : 30/01/2023
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.7110481,93.8379088
14.995796758714
119700
Aerator completed

Progress Update : 30/01/2023
in progress
package VII
rishi
24.80748517734833,93.94173431396518
24.5854599,94.0706633
27.911932663572
119700
const. of OHT at Heirok town WSS

Progress Update : 30/01/2023
in progress
package VII
rishi
24.80748517734833,93.94173431396518
24.58972075,94.07394831
27.652437120834
119700
const. of OHT at Heirok town WSS

Progress Update : 30/01/2023
in progress
package VII
rishi
24.80748517734833,93.94173431396518
24.56820696,94.08797813
30.432290499242
119700
const. of SSF at Heirok town WSS

Progress Update : 30/01/2023
in progress
package VII
rishi
24.80748517734833,93.94173431396518
24.56839934,94.08797735
30.413547821331
119700
const. of ST at Heirok town WSS

Progress Update : 30/01/2023
in progress
package VII
rishi
24.80748517734833,93.94173431396518
24.5797645,94.075774
28.713537117648
119700
const. of areator at Heirok town WSS

Progress Update : 30/01/2023
in progress
package VII
rishi
24.80748517734833,93.94173431396518
24.5812293,94.0764129
28.600626843535
119700
const. of CWR at Heirok town WSS

Progress Update : 30/01/2023
Ongoing
Package-VII
rishi
24.80748517734833,93.94173431396518
24.7414379,93.9351777
7.3735400380756
119700
DI/GI pipes for thoubal division (6town)

Progress Update : 30/01/2023
Ongoing
Package-VII
rishi
24.80748517734833,93.94173431396518
24.7414379,93.9351777
7.3735400380756
119700
DI/GI pipes for thoubal division (6town)

Progress Update : 30/01/2023
Ongoing
Package-VII
rishi
24.80748517734833,93.94173431396518
24.7414379,93.9351777
7.3735400380756
119700
DI/GI pipes for thoubal division (6town)

Progress Update : 30/01/2023
Ongoing
Package-VII
rishi
24.80748517734833,93.94173431396518
24.7414595,93.9351898
7.3710384414043
119700
DI/GI pipes for thoubal division (6town)

Progress Update : 30/01/2023
Ongoing
Package-VII
rishi
24.80748517734833,93.94173431396518
24.7414672,93.9351875
7.3702065471304
119700
DI/GI pipes for thoubal division (6town)

Progress Update : 30/01/2023
Ongoing
package - vii
suraj2022
24.80748517734833,93.94173431396518
24.5958028,94.0422821
25.634862128633
119700
E/W for construction of filter house at Wangjing Town

Progress Update : 30/01/2023
Ongoing
package - vii
suraj2022
24.80748517734833,93.94173431396518
24.5957848,94.0423167
25.638084960338
119700
Construction of clariflocculator at Wangjing Town

Progress Update : 30/01/2023
Ongoing
package - vii
suraj2022
24.80748517734833,93.94173431396518
24.5958288,94.0423088
25.633276260896
119700
Construction of CWR at Wangjing Town

Progress Update : 30/01/2023
Ongoing
package - vii
suraj2022
24.80748517734833,93.94173431396518
24.5943654,94.0425628
25.792890552687
119700
Construction of OHT at Wangjing Town

Progress Update : 30/01/2023
In progress
Package VII (NDB)
mujibur
24.80748517734833,93.94173431396518
24.7067633,93.9248983
11.327505385274
119700
Haoreibi Awang Leilai OHT

Progress Update : 30/01/2023
In progress
Package VII (NDB)
mujibur
24.80748517734833,93.94173431396518
24.689053,93.936366
13.179576314955
119700
Lilong Turel Ahanbi OHT

Progress Update : 30/01/2023
In progress
Package VII( NDB)
mujibur
24.80748517734833,93.94173431396518
24.6856697,93.9482348
13.560507866943
119700
Lilong Hourou OHT

Progress Update : 24/01/2023
Upgradation of Existing Water Supply Scheme Oinam
Phase 1
arun123
24.80748517734833,93.94173431396518
24.6743819,93.7858973
21.602837019605
119700
Raw water Reservoir completed upto 70%

Progress Update : 24/01/2023
Upgradation of Existing Water Supply Scheme Oinam
Phase 1
arun123
24.80748517734833,93.94173431396518
24.6823975,93.7912976
20.596479036688
119700
Slow Sand Filter 1st lift wall shuttering is in progress.

Progress Update : 24/01/2023
Augmentation of kumbi water supply scheme
1
arun123
24.80748517734833,93.94173431396518
24.4304291,93.8036887
44.185889784042
119700
Kumbi settling tank work is in progress at kumbi site package no7

Progress Update : 24/01/2023
Upgradation of Existing Water Supply Scheme Oinam
Phase 1
arun123
24.80748517734833,93.94173431396518
24.6947718,93.8148115
17.925286172442
119700
CWR completed upto 3rd lift wall

Progress Update : 24/01/2023
Upgradation of Existing Water Supply Scheme Oinam
Phase 1
arun123
24.80748517734833,93.94173431396518
24.6711667,93.7811328
22.198503140144
119700
Settling Tank completed

Progress Update : 24/01/2023
Upgradation of Existing Water Supply Scheme Oinam
Phase 1
arun123
24.80748517734833,93.94173431396518
24.6771987,93.7870668
21.302617816591
119700
Aerator completed

Progress Update : 24/01/2023
Upgradation of Existing Water Supply Scheme Oinam
Phase 1
arun123
24.80748517734833,93.94173431396518
24.6762265,93.7862149
21.439256579048
119700
Chowkidar Quarter brick work is in progress

Progress Update : 24/01/2023
Augmentation of kumbi water supply scheme
1
arun123
24.80748517734833,93.94173431396518
24.4307441,93.8059131
44.082109502172
119700
Kumbi cascade aerator footing work is in progress package no7

Progress Update : 24/01/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3323371,93.6922404
58.546390853224
119700
OHT top dome casting work at Ebenezer compound Churachandpur Manipur

Progress Update : 24/01/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3322994,93.692138
58.554637801651
119700
OHT top dome casting work at Ebenezer compound Churachandpur Manipur

Progress Update : 24/01/2023
Upgradating of Ningthoukhong water supply scheme
VII
arun123
24.80748517734833,93.94173431396518
24.5815667,93.7387754
32.425000384787
119700
Ningthoukhong Slow Sand Filter bottom slab steel binding work is in progress package no. 7

Progress Update : 24/01/2023
Upgradation of Existing Water Supply Scheme
Phase 1
arun123
24.80748517734833,93.94173431396518
24.7235661,93.7747808
19.266488434457
75984
Chowkidar Quarter brick work is in progress.

Progress Update : 24/01/2023
Upgradating of Ningthoukhong water supply scheme
1
arun123
24.80748517734833,93.94173431396518
24.580401,93.746119
32.06310061622
75984
Ningthoukhong Settling Tank Wall final lift steel binding is in progress package no. 7

Progress Update : 24/01/2023
Upgradation of Existing Water Supply Scheme
Phase 1
arun123
24.80748517734833,93.94173431396518
24.7235661,93.7747808
19.266488434457
75984
CWR raft completed

Progress Update : 19/01/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3323279,93.6923578
58.542199600926
75984
OHT bottom dome Reinforcement work at Ebenezer compound Churachandpur Manipur

Progress Update : 19/01/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3323448,93.6923538
58.540677284145
75984
OHT bottom dome Reinforcement work at Ebenezer compound Churachandpur Manipur

Progress Update : 19/01/2023
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.781179,93.9210056
3.5963066051932
75984
Chingtham leikai W/S zone, pipe lying at Heinoukhongnembi

Progress Update : 19/01/2023
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7835647,93.9205756
3.4110748176817
75984
Chingtham leikai W/S zone, pipe lying at Heinoukhongnembi

Progress Update : 13/01/2023
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7795236,93.924219
3.5765843689861
75984
Chingtham leikai W/S zone pipe lying at Lourembam Leikai

Progress Update : 13/01/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3322919,93.6921435
58.555150874273
75984
Bottom dome shuttering work for OHT at Ebenezer compound Churachandpur Manipur

Progress Update : 12/01/2023
Ongoing
III
RajendroN
24.80748517734833,93.94173431396518
24.7743349,93.9049859
5.2294012170351
75984
OHT WSZ 24 Ghari-I

Progress Update : 12/01/2023
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7786688,93.9256391
3.5924473605461
75984
Chingtham leikai W/S zone, pipe lying at Lourembam Leikai

Progress Update : 12/01/2023
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7743417,93.9050222
5.2262693877395
75984
Distribution Line at WSZ-24 Ghari zone

Progress Update : 05/01/2023
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.80985698,93.88648273
5.582682697517
123812
Laying of 800 mm. Iroisemba hilltop

Progress Update : 05/01/2023
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8081495,93.8860546
5.6201848858214
75984
Laying of 800 mm. Iroisemba hilltop

Progress Update : 05/01/2023
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8077297,93.8879642
5.4270426813876
75984
Laying of 800 mm. Iroisemba hilltop

Progress Update : 04/01/2023
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7834496,93.9217547
3.348053437659
75984
Chingtham leikai W/S zone, pipe lying at Heinoukhongnembi

Progress Update : 04/01/2023
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3323357,93.6919403
58.559614864659
75984
OHT work at Ebenezer compound Churachandpur Manipur

Progress Update : 30/12/2022
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7775305,93.9253753
3.7175284583759
75984
Chingtham leikai W/S zone, Chingtham leikai

Progress Update : 30/12/2022
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778232,93.9271279
3.6126599129405
75984
Chingtham leikai W/S zone, Chingtham leikai

Progress Update : 23/12/2022
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7776448,93.9286381
3.5715924338816
75984
Chingtham leikai W/S zone, pipe lying at Keisham Leikai Tongbram Leirak

Progress Update : 21/12/2022
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.777162,93.9252904
3.7580602780876
75984
Chingtham leikai W/S zone, pipe lying at Chingtham leikai

Progress Update : 20/12/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3555829,93.70008
55.87281597172
75984
OHT 4th lift Wall casting at Bijang Churachandpur Manipur

Progress Update : 19/12/2022
Ongoing
Phase - I
Zarzolien
24.80748517734833,93.94173431396518
24.2139762,93.0346191
113.03529107201
75984
Providing drinking water supply scheme at Sipuikon

Progress Update : 19/12/2022
Ongoing
Phase - I
Zarzolien
24.80748517734833,93.94173431396518
24.2132256,93.0357842
112.98862128215
75984
Providing drinking water supply scheme at Sipuikon

Progress Update : 15/12/2022
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7846124,93.9221206
3.2229602043756
75984
Chingtham leikai W/S zone, pipe lying at Heinoukhongnembi Namoijam Leirak

Progress Update : 15/12/2022
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7743697,93.9238239
4.1020031681785
75984
Chingtham leikai W/S zone, pipe lying at Chingtham leikai Lairembi

Progress Update : 14/12/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3555786,93.7000738
55.87352027978
75984
3rd lift Wall for OHT at Bijang Churachandpur Manipur

Progress Update : 14/12/2022
Ongoing
Phase 1
telein123
24.80748517734833,93.94173431396518
24.7224547,93.7747808
19.326705539825
75984
NDB Package IX/Augmentation of water treatment Plant at Leimaram Irengbam/construction of Service Reservoir

Progress Update : 14/12/2022
Ongoing
Phase 1
telein123
24.80748517734833,93.94173431396518
24.7236059,93.773193
19.40476851436
75984
NDB Package IX/Augmentation of water treatment Plant at Leimaram Irengbam/construction of Service Reservoir

Progress Update : 10/12/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.2551864,93.6605811
67.675443273599
75984
SR 1st lift Wall casting at Geljang Churachandpur Manipur

Progress Update : 08/12/2022
NA
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.353907,93.7016482
55.971571140629
75984
Cube test for OHT at Bijang Churachandpur Manipur

Progress Update : 08/12/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3535128,93.701911
55.999573025584
75984
Casting 2nd lift wall for OHT BIJANG CHURACHANDPUR Manipur

Progress Update : 08/12/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3554023,93.700699
55.863549355371
75984
Casting 2nd lift wall for OHT BIJANG CHURACHANDPUR Manipur

Progress Update : 05/12/2022
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7789839,93.926086
3.5408811920435
75984
Chingtham leikai W/S zone, pipe lying at Lourembam Leikai

Progress Update : 02/12/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3540905,93.7017378
55.949249760797
75984
Casting OHT wall at Bijang Churachandpur Manipur

Progress Update : 02/12/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3538067,93.7019283
55.969348790671
75984
Casting OHT wall at Bijang Churachandpur Manipur

Progress Update : 02/12/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3538499,93.7020032
55.961736988709
75984
Casting OHT wall at Bijang Churachandpur Manipur

Progress Update : 02/12/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3536387,93.7017075
55.995865065489
75984
Slam test for OHT wall at Bijang Churachandpur Manipur

Progress Update : 02/12/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.354305,93.7016392
55.932078188494
75984
Quarter building at Bijang Churachandpur Manipur

Progress Update : 02/12/2022
On going
Package 6
bantandb
24.80748517734833,93.94173431396518
24.9444461,93.8749039
16.654060495292
75984
SEKMAI OTHER TOWN - Construction of OHT

Progress Update : 02/12/2022
On going
Package 6
bantandb
24.80748517734833,93.94173431396518
24.9520943,93.87056
17.60904692633
75984
SEKMAI OTHER TOWN - Repairing of ST

Progress Update : 02/12/2022
On going
Package 6
bantandb
24.80748517734833,93.94173431396518
24.9520943,93.87056
17.60904692633
75984
SEKMAI OTHER TOWN - Repairing of SSF

Progress Update : 02/12/2022
On going
Package 6
bantandb
24.80748517734833,93.94173431396518
24.9520943,93.87056
17.60904692633
75984
SEKMAI OTHER TOWN - Construction of SSF

Progress Update : 02/12/2022
On going
Package 6
bantandb
24.80748517734833,93.94173431396518
24.9520943,93.87056
17.60904692633
75984
Sekmai other town-excavation of ground sump

Progress Update : 30/11/2022
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7796127,93.9242479
3.5665308874242
75984
Chingtham leikai W/S zone, pipe lying at Lourembam Leikai

Progress Update : 28/11/2022
Ongoing
Ongoing
amirhussain
24.80748517734833,93.94173431396518
24.8138103,93.1188524
83.053628466877
75984
Package: OTP P-VI(W)(Jiribam) Chawkidar Qtr cum godwon

Progress Update : 28/11/2022
Ongoing
Ongoing
amirhussain
24.80748517734833,93.94173431396518
24.8138103,93.1188524
83.053628466877
75984
Package: OTP P-VI(W)(Jiribam) Overhead Tank

Progress Update : 28/11/2022
Ongoing
Ongoing
amirhussain
24.80748517734833,93.94173431396518
24.8138364,93.1175987
83.18017102565
75984
Package: OTP P-VI(W)(Jiribam) Slow Sand Filter

Progress Update : 28/11/2022
Ongoing
Ongoing
amirhussain
24.80748517734833,93.94173431396518
24.8141874,93.118539
83.08549672384
75984
Package: OTP P-VI(W)(Jiribam) Settling tank

Progress Update : 28/11/2022
On going
Package-VI
korouhanbang
24.80748517734833,93.94173431396518
24.71578935,93.91660985
10.506458850775
75984
Drinking water supply other town (13 Nos.) Package-VI (W) 1.765 MLD WTP at Lilong Haoreibi (Construction of Chowkidar quarter)

Progress Update : 28/11/2022
On going
Package-VI
korouhanbang
24.80748517734833,93.94173431396518
24.71589466,93.9165195
10.497304680255
75984
Drinking water supply other town (13 Nos.) Package-VI (W) 1.765 MLD WTP at Lilong Haoreibi (Repairing of treatment units)

Progress Update : 28/11/2022
On going
Package-VI
korouhanbang
24.80748517734833,93.94173431396518
24.71596607,93.91646897
10.490841075724
75984
Drinking water supply other town (13 Nos.) Package-VI (W) 1.765 MLD WTP at Lilong Haoreibi (Repairing of treatment units)

Progress Update : 28/11/2022
On going
Package-VI
korouhanbang
24.80748517734833,93.94173431396518
24.71621338,93.91639794
10.465920239285
75984
Drinking water supply other town (13 Nos.) Package-VI (W) 1.765 MLD WTP at Lilong Haoreibi (Repairing of treatment units)

Progress Update : 28/11/2022
On going
Package-VI
korouhanbang
24.80748517734833,93.94173431396518
24.715016484261,93.933561444283
10.314616221681
75984
Drinking water supply other town (13 Nos.) Package-VI (W) 1.765 MLD WTP at Lilong Chajing town A (Construction of Step type Intake)

Progress Update : 28/11/2022
On going
Package-VI
korouhanbang
24.80748517734833,93.94173431396518
24.71492623,93.93316946
10.327857997939
75984
Drinking water supply other town (13 Nos.) Package-VI (W) 1.765 MLD WTP at Lilong Chajing town A (Construction of Step type Intake)

Progress Update : 28/11/2022
On going
Package-VI
korouhanbang
24.80748517734833,93.94173431396518
24.72754423,93.92725212
9.0080569605953
75984
Drinking water supply other town (13 Nos.) Package-VI (W) 1.765 MLD WTP at Lilong Chajing town A (Construction of Clear Water Reservoir (0.70 ML))

Progress Update : 28/11/2022
On going
Package-VI
korouhanbang
24.80748517734833,93.94173431396518
24.72737063,93.92891268
9.0014693095873
75984
Drinking water supply other town (13 Nos.) Package-VI (W) 1.765 MLD WTP at Lilong Chajing town A (Construction of Clear Water Reservoir (0.30 ML))

Progress Update : 28/11/2022
On going
Package-VI
korouhanbang
24.80748517734833,93.94173431396518
24.72732851,93.92913327
9.0029298100303
75984
Drinking water supply other town (13 Nos.) Package-VI (W) 1.765 MLD WTP at Lilong Chajing town A (Repairing of treatment units)

Progress Update : 28/11/2022
On going
Package-VI
korouhanbang
24.80748517734833,93.94173431396518
24.72730323,93.9291037
9.0061347367607
75984
Drinking water supply other town (13 Nos.) Package-VI (W) 1.765 MLD WTP at Lilong Chajing town A (Repairing of treatment units)

Progress Update : 28/11/2022
On going
Package-VI
korouhanbang
24.80748517734833,93.94173431396518
24.72713007,93.9292507
9.0231098293853
75984
Drinking water supply other town (13 Nos.) Package-VI (W) 1.765 MLD WTP at Lilong Chajing town A (Construction of Pre Settling Tank)

Progress Update : 28/11/2022
On going
Package-VI
korouhanbang
24.80748517734833,93.94173431396518
24.72713934,93.9292458
9.0221583253654
75984
Drinking water supply other town (13 Nos.) Package-VI (W) 1.765 MLD WTP at Lilong Chajing town A (Construction of Pre Settling Tank)

Progress Update : 28/11/2022
On going
Package-VI
korouhanbang
24.80748517734833,93.94173431396518
24.72705313,93.92904198
9.0345458562244
75984
Drinking water supply other town (13 Nos.) Package-VI (W) 1.765 MLD WTP at Lilong Chajing town A (Construction of Slow Sand Filter)

Progress Update : 28/11/2022
On going
Package-VI
korouhanbang
24.80748517734833,93.94173431396518
24.72711046,93.92920171
9.0259609509763
75984
Drinking water supply other town (13 Nos.) Package-VI (W) 1.765 MLD WTP at Lilong Chajing town A (Construction of Slow Sand Filter)

Progress Update : 28/11/2022
Ongoing
Package Xl (Imphal West)
darpang
24.80748517734833,93.94173431396518
24.696838147938,93.903551045805
12.892784541266
75984
CO CWR at Samurou

Progress Update : 28/11/2022
Ongoing
Package VI
henthoi
24.80748517734833,93.94173431396518
24.80031494,93.91050297
3.2515056993768
75984
Augmentation of Lamjaotongba WSS (sh :- construction of ST)

Progress Update : 28/11/2022
Ongoing
Package Xl (Imphal West)
darpang
24.80748517734833,93.94173431396518
24.6967009,93.9038055
12.899696678563
75984
CO OHT at Samurou

Progress Update : 28/11/2022
Ongoing
Package VI
henthoi
24.80748517734833,93.94173431396518
24.80031641,93.91058808
3.2431380811639
75984
Augmentation of Lamjaotongba WSS (sh :- Construction of SSF)

Progress Update : 28/11/2022
Ongoing
Package VI
henthoi
24.80748517734833,93.94173431396518
24.80022109,93.91066119
3.2386138970274
75984
Augmentation of Lamjaotongba WSS (sh :- Construction of SSF)

Progress Update : 28/11/2022
Ongoing
Package Xl (Imphal West)
darpang
24.80748517734833,93.94173431396518
24.6999086,93.9035624
12.567053659201
75984
CO Step Type Intake at Samurou

Progress Update : 28/11/2022
Ongoing
Package VI
henthoi
24.80748517734833,93.94173431396518
24.80007847,93.91020542
3.2871211500709
75984
Augmentation of Lamjaotongba WSS (sh :- construction of OHT)

Progress Update : 28/11/2022
Ongoing
Package VI
henthoi
24.80748517734833,93.94173431396518
24.80006258,93.91018837
3.2892302597267
75984
Augmentation of Lamjaotongba WSS (sh :- construction of OHT)

Progress Update : 28/11/2022
Ongoing
Package Xl (Imphal West)
darpang
24.80748517734833,93.94173431396518
24.6555568,93.90354
17.32763911717
75984
Co OHT Laxmi Bazar zone -l

Progress Update : 28/11/2022
Ongoing
Package Xl (Imphal West)
darpang
24.80748517734833,93.94173431396518
24.675131659023,93.904367694631
15.192397387812
75984
Co Step Type Intake wangoi

Progress Update : 28/11/2022
Ongoing
Package Xl (Imphal West)
darpang
24.80748517734833,93.94173431396518
24.6744825,93.9043436
15.262930005396
75984
Co OHT wangoi

Progress Update : 27/11/2022
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7794936,93.929185
3.3602795145004
75984
Chingtham leikai W/S zone, pipe lying at Keisham Leirak

Progress Update : 21/11/2022
Ongoing
Package (ix) Imphal West
darpang
24.80748517734833,93.94173431396518
24.65224,93.898787
17.798230766258
75984
Clear water reservoir Upokpi (Heiningsoi)wss

Progress Update : 20/11/2022
Ongoing
Phase1
arun123
24.80748517734833,93.94173431396518
24.6788548,93.843424
17.410148345772
0
Thounaojam Repairing of S/T

Progress Update : 20/11/2022
Ongoing
Phase1
arun123
24.80748517734833,93.94173431396518
24.6788548,93.843424
17.410148345772
0
Thounaojam Repairing of S/T

Progress Update : 20/11/2022
Ongoing
Phase1
arun123
24.80748517734833,93.94173431396518
24.7053083,93.8809625
12.912208227405
75984
Thounaojam Repairing of S/T

Progress Update : 20/11/2022
Ongoing
Phase1
arun123
24.80748517734833,93.94173431396518
24.707787,93.899742
11.868583984962
0
Thounaojam Repairing of SSF

Progress Update : 20/11/2022
Ongoing
Phase1
arun123
24.80748517734833,93.94173431396518
24.7077456,93.8870094
12.39031929473
75984
Thounaojam Service Reservior

Progress Update : 19/11/2022
In Progress
1
telein123
24.80748517734833,93.94173431396518
24.4567994,93.7420807
43.90473202126
0
NDB Package IX/ Augmentation of water treatment plant at Kwakta Khuman/Construction of Slow Sand Filter

Progress Update : 19/11/2022
In Progress
1
telein123
24.80748517734833,93.94173431396518
24.4516036,93.7433585
44.360273307314
75984
NDB Pkg IX/ Augemtation of Water Treatment Plant at Kwakta Khuman/ construction of Areator

Progress Update : 19/11/2022
In Progress
1
telein123
24.80748517734833,93.94173431396518
24.4568385,93.7404939
43.974819618066
75984
NDB Package IX/ Augmentation of water treatment plant at Kwakta Khuman/Construction of Service Reservoir

Progress Update : 19/11/2022
In Progress
1
telein123
24.80748517734833,93.94173431396518
24.4405431,93.7574087
44.852805442874
75984
NDB Pkg IX/ Augemtation of Water Treatment Plant at Charangpat/construction of Service Reservoir

Progress Update : 19/11/2022
In Progress
1
telein123
24.80748517734833,93.94173431396518
24.4346681,93.767477
45.040361526387
75984
NDB Package IX/Augmentation of water treatment plant at Charangpat/Construction of Slow Sand Filter

Progress Update : 19/11/2022
In Progress
1
telein123
24.80748517734833,93.94173431396518
24.4466029,93.7646193
43.938645868366
75984
NDB Pkg IX/Augmentation of Water Treatment Plant at Charangpat/construction of areator

Progress Update : 19/11/2022
In Progress
1
telein123
24.80748517734833,93.94173431396518
24.4629353,93.7971803
41.001619096141
0
NDB Package IX/ Construction of water treatment plant at Keirenphabi/Construction of Settling Tank

Progress Update : 19/11/2022
In Progress
1
telein123
24.80748517734833,93.94173431396518
24.463962,93.7970162
40.900880837919
75984
NDB Pkg IX/ construction of Water Treatment Plant at Kairenphabi/Construction of slow sand Filter

Progress Update : 19/11/2022
In Progress
1
telein123
24.80748517734833,93.94173431396518
24.4629213,93.7941568
41.112947950667
75984
NDB Package IX/Construction of water treatment plant at Keirenphabi/Construction OHT

Progress Update : 19/11/2022
Ongoing
phase I
arun123
24.80748517734833,93.94173431396518
24.42696239,93.75082513
46.503258479662
0
Package IX saiton SR

Progress Update : 19/11/2022
In Progress
1
telein123
24.80748517734833,93.94173431396518
24.3240135,93.8506122
54.541057545917
75984
NDB Pkg IX/Construction of Water Treatment Plant at Tanjeng wangoo/ construction of areator

Progress Update : 19/11/2022
In Progress
1
telein123
24.80748517734833,93.94173431396518
24.3239083,93.85065
54.551941677598
75984
NDB Package IX/Construction of water treatment plant at Tangjeng Wangoo/Improvement of Settling Tank

Progress Update : 19/11/2022
In Progress
1
telein123
24.80748517734833,93.94173431396518
24.3334386,93.8564639
53.409665830028
75984
NDB Pkg IX/Construction of Water Treatment Plant at Tanjeng wangoo/construction of service Reservoir

Progress Update : 19/11/2022
In Progress
1
telein123
24.80748517734833,93.94173431396518
24.3319393,93.8571001
53.563883789388
75984
NDB Package IX/Construction of water treatment plant at Tanjeng Wangoo/Improvement of Slow Sand Filter

Progress Update : 19/11/2022
Ongoing
Phase I
arun123
24.80748517734833,93.94173431396518
24.42061309,93.77298193
46.275054015712
0
Package IX sagolpat SR

Progress Update : 19/11/2022
In Progress
1
telein123
24.80748517734833,93.94173431396518
24.304986,93.8661136
56.393640702537
75984
NDB Package IX/Construction of Water Treatment Plant at Napat/Construction of Aerator

Progress Update : 19/11/2022
In Progress
1
telein123
24.80748517734833,93.94173431396518
24.3050801,93.8659105
56.386063719854
75984
NDB Pkg IX/Construction of Water Treatment Plant at Napat/construction of Pump House

Progress Update : 19/11/2022
In Progress
1
telein123
24.80748517734833,93.94173431396518
24.3091086,93.8507387
56.173193252471
75984
NDB Package IX/Construction of water treatment plant at Napat/Construction of Settling Tank

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.7057183,93.9223503
11.483437552635
0
Augmentation of Chajing karam WSS (SH:- C/o OHT)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.6825297,93.9022889
14.45344548775
75984
Augmentation of Chajing karam WSS (SH:- C/o OHT)

Progress Update : 19/11/2022
Ongoing
phase I
arun123
24.80748517734833,93.94173431396518
24.3930454,93.8307054
47.428763222785
75984
Package IX naodakhong aerator

Progress Update : 19/11/2022
Ongoing
phase I
arun123
24.80748517734833,93.94173431396518
24.3930454,93.8307054
47.428763222785
0
Package IX naodakhong ST

Progress Update : 19/11/2022
In Progress
1
telein123
24.80748517734833,93.94173431396518
24.3548945,93.8608113
50.984227396451
75984
NDB Package IX/Augmentation of Water Treatment Plant at Chairel/ Construction of Aerator

Progress Update : 19/11/2022
In Progress
1
telein123
24.80748517734833,93.94173431396518
24.3576538,93.8520109
50.832650192966
75984
NDB Pkg IX/Augemtation of Water Treatment Plant at Chairel/construction of Slow Sand Filter

Progress Update : 19/11/2022
In Progress
1
telein123
24.80748517734833,93.94173431396518
24.3629817,93.8466042
50.351393930051
75984
NDB Package IX/ Augmentation of Water Treatment Plant at Chairel/ Construction of Settling Tank

Progress Update : 19/11/2022
Ongoing
phase I
arun123
24.80748517734833,93.94173431396518
24.43128308,93.83203827
43.274444153096
75984
Package IX Ithai SSF

Progress Update : 19/11/2022
In Progress
1
telein123
24.80748517734833,93.94173431396518
24.3793317,93.8515217
48.472035632631
75984
NDB Package IX/Augmentation of water treatment plat at khullakpat/ Construction of Slow Sand Filter

Progress Update : 19/11/2022
In Progress
1
telein123
24.80748517734833,93.94173431396518
24.3706155,93.852647
49.403399460982
75984
NDB Pkg IX/Augemtation of Water Treatment Plant at Khullakpat/construction of Settling tank

Progress Update : 19/11/2022
In progress
1
telein123
24.80748517734833,93.94173431396518
24.3767334,93.859963
48.603403034153
75984
NDB Package IX/Augmentation of Water Treatment Plant at khullakpat/Construction of Aerator

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7873598,93.8879642
5.8706334493451
0
Augmentation of Patsoi Part -II WSS (SH : Repairing of SSF)

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7887837,93.8901923
5.6026656954061
0
Augmentation of Patsoi Part -II WSS (SH : Construction of Reservoir)

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7873598,93.8879642
5.8706334493451
75984
Augmentation of Patsoi Part -II WSS (SH : Construction of SSF)

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7750135,93.8784166
7.340736983375
0
Augmentation of Tabungkhok Makha Leikai WSS (SH : Construction of SSF)

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7750135,93.8784166
7.340736983375
75984
Augmentation of Tabungkhok Makha Leikai WSS (SH : Construction of ST)

Progress Update : 19/11/2022
Ongoing
phase I
arun123
24.80748517734833,93.94173431396518
24.4971076,93.7611268
39.039751142003
75984
Package IX ngangkha lawai SSF earthwork

Progress Update : 19/11/2022
Ongoing
phase I
arun123
24.80748517734833,93.94173431396518
24.5029872,93.74336191
39.346427904382
0
Package IX ngangkha lawai ST raft reinforcment

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7729397,93.8870094
6.7282902132156
75984
Augmentation of Changangei WSS (SH : Repairing of ST)

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7729397,93.8870094
6.7282902132156
75984
Augmentation of Changangei WSS (SH : Repairing of SSF)

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7729397,93.8870094
6.7282902132156
75984
Augmentation of Changangei WSS (SH : CO OHT 2.0LL capacity)

Progress Update : 19/11/2022
Ongoing
phase I
arun123
24.80748517734833,93.94173431396518
24.5209261,93.757317
36.911478809799
75984
Package IX naransena SSF pcc

Progress Update : 19/11/2022
Ongoing
phase I
arun123
24.80748517734833,93.94173431396518
24.51665874,93.74682998
37.862220986589
0
Package IX naransena ST

Progress Update : 19/11/2022
Ongoing
phase I
arun123
24.80748517734833,93.94173431396518
24.5209261,93.757317
36.911478809799
75984
Package IX sunushiphai ST

Progress Update : 19/11/2022
Ongoing
phase I
arun123
24.80748517734833,93.94173431396518
24.5209261,93.757317
36.911478809799
75984
Package IX sunushiphai SR

Progress Update : 19/11/2022
Ongoing
phase I
arun123
24.80748517734833,93.94173431396518
24.5209261,93.757317
36.911478809799
75984
Package IX sunushiphai SSF pcc

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.4906813,93.8822862
35.733923829592
75984
Augmentation of Laphupat Tera WSS (Sh:- Repairing of SSF)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.49066,93.8821067
35.739312542983
75984
Augmentation of Laphupat Tera WSS (Sh:- Repairing of SSF)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.49066,93.8821067
35.739312542983
0
Augmentation of Laphupat Tera WSS (Sh:- C/o Service Reservoir)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.49061,93.8820717
35.745389083714
75984
Augmentation of Laphupat Tera WSS (Sh:- C/o Service Reservoir)

Progress Update : 19/11/2022
Ongoing
phase I
arun123
24.80748517734833,93.94173431396518
24.53874546,93.75772445
35.192916548206
75984
Package IX phubala SSF

Progress Update : 19/11/2022
Ongoing
phase I
arun123
24.80748517734833,93.94173431396518
24.5745284,93.7630318
31.572945575888
75984
Package IX ningthoukhong kha khunou SR earthwork

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.5111707,93.8747167
33.635864502476
75984
Augmentation of Komlakhong WSS (Sh:- C/o Service Reservoir)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.5111742,93.8747186
33.635444633948
75984
Augmentation of Komlakhong WSS (Sh:- C/o Service Reservoir)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.511172,93.8747056
33.635948755239
75984
Augmentation of Komlakhong WSS (Sh:- C/o Service Reservoir)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.5111644,93.8747213
33.63645710573
75984
Augmentation of Komlakhong WSS (Sh:- Repairing of SSF)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.5109456,93.8748338
33.658003695979
75984
Augmentation of Komlakhong WSS (Sh:- Repairing of SSF)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.5109418,93.8748417
33.658257299998
0
Augmentation of Komlakhong WSS (Sh:- Repairing of SSF)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.5104905,93.8755754
33.692629467558
75984
Augmentation of Komlakhong WSS (Sh:- Repairing of SSF)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.5105894,93.8753099
33.687186360576
75984
Augmentation of Komlakhong WSS (Sh:- Repairing of ST)

Progress Update : 19/11/2022
Ongoing
phase I
arun123
24.80748517734833,93.94173431396518
24.5833838,93.7646193
30.676121543504
0
Package IX upokpi SSF

Progress Update : 19/11/2022
Ongoing
phase I
arun123
24.80748517734833,93.94173431396518
24.58063564,93.74712421
31.98002125809
0
Package IX upokpi settling tank

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.5292542,93.8682345
31.815309723017
0
Augmentation of WSS at Chingthi Ching (Sh:- Repairing of SR)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.5292542,93.8682345
31.815309723017
75984
Augmentation of WSS at Chingthi Ching (Sh:- Repairing of SR)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.5292542,93.8682345
31.815309723017
75984
Augmentation of WSS at Chingthi Ching (Sh:- C/o SSF)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.5292542,93.8682345
31.815309723017
75984
Augmentation of WSS at Chingthi Ching (Sh:- C/o SSF)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.5292542,93.8682345
31.815309723017
75984
Augmentation of WSS at Chingthi Ching (Sh:- Repairing of ST)

Progress Update : 19/11/2022
Ongoing
phase I
arun123
24.80748517734833,93.94173431396518
24.5747647,93.7684297
31.242564396901
75984
Package IX nachou and potshangbam OHT

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7375588,93.8198658
14.554372251072
75984
Augmentation of Awang Jiri WSS (SH: Construction of OHT 2.00 lakh litrrs capacity)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.5528032,93.8749163
29.111532663854
75984
Augmentation of Phoubakchao WSS (Sh:- C/o OHT)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.5528032,93.8749163
29.111532663854
75984
Augmentation of Phoubakchao WSS (Sh:- Repairing of ST)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.5520375,93.8758709
29.172210219163
75984
Augmentation of Phoubakchao WSS (Sh:- Repairing of ST)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.5520375,93.8758709
29.172210219163
75984
Augmentation of Phoubakchao WSS (Sh:- Repairing of SSF)

Progress Update : 19/11/2022
On going
phase-1
arun123
24.80748517734833,93.94173431396518
24.61767248,93.77463658
27.023948978982
75984
Package IX khoijuman OHT

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7889164,93.841834
10.292825748262
75984
Augmentation of Ngairangbam WSS (SH : Construction of Reservoir)

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7889164,93.841834
10.292825748262
75984
Augmentation of Ngairangbam WSS (SH : Construction of OHT 1.5LL capacity )

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7889164,93.841834
10.292825748262
75984
Augmentation of Ngairangbam WSS (SH : Construction of OHT 1.5LL capacity )

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7889164,93.841834
10.292825748262
75984
Augmentation of Ngairangbam WSS (SH : Construction of OHT 1.5LL capacity )

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7420447,93.8351565
12.989027031078
75984
Augmentation of Top Khabi WSS (SH : Energization )

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7331269,93.8507387
12.359460855354
75984
Augmentation of Top Khabi WSS (SH : Repairing of existing SSF)

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7331269,93.8507387
12.359460855354
0
Augmentation of Top Khabi WSS (SH : Construction of SSF)

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7350631,93.8329309
13.620085526181
75984
Augmentation of Top Khabi WSS (SH : Construction of Reservoir)

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7331269,93.8507387
12.359460855354
75984
Augmentation of Top Khabi WSS (SH : Construction of OHT 2.5LL capacity)

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7740885,93.856782
9.3448048667833
75984
Augmentation of Sagoltongba WSS (SH : Repairing of SSF)

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7740885,93.856782
9.3448048667833
75984
Augmentation of Sagoltongba WSS (SH : Repairing of SSF)

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7740885,93.856782
9.3448048667833
75984
Augmentation of Sagoltongba WSS (SH : Repairing of SSF)

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7740885,93.856782
9.3448048667833
75984
Augmentation of Sagoltongba WSS (SH : Construction of SSF)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.713209,93.8818272
12.102475730617
75984
Augmentation of Iron Meijrao WSS (Sh:- Repairing of SSF)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.713209,93.8818272
12.102475730617
75984
Augmentation of Iron Meijrao WSS (Sh:- Repairing of SSF)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.7132099,93.8818321
12.102141783558
75984
Augmentation of Iron Meijrao WSS (Sh:- Repairing of ST)

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7779693,93.8572195
9.1405233231872
75984
Augmentation of Yurembam WSS (SH : Construction of OHT 2.5LL capacity)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.7132092,93.8818296
12.102335358384
75984
Augmentation of Iron Meijrao WSS (Sh:- Repairing of SSF)

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7740885,93.856782
9.3448048667833
75984
Augmentation of Yurembam WSS (SH : Repairing of SSF)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.7132091,93.8818315
12.102249115314
75984
Augmentation of Iron Meijrao WSS (Sh:- C/o OHT)

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7740885,93.856782
9.3448048667833
75984
Augmentation of Yurembam WSS (SH : Repairing of ST)

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7740885,93.856782
9.3448048667833
75984
Augmentation of Yurembam WSS (SH : Repairing of ST)

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7740885,93.856782
9.3448048667833
75984
Augmentation of Yurembam WSS (SH : Repairing of ST)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.743432,93.8803818
9.4386171600392
75984
Construction of Water treatment plant at Meitram(Sh:- C/o OHT)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.737586,93.8790531
10.022496446865
75984
Augmentation of Malom Tulihal (Sh:- Repairing of SSF)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.7482872,93.8806443
9.0199900990011
75984
Augmentation of Malom Tulihal (Sh:- C/o service reservoir)

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7997945,93.8653711
7.7548160899458
75984
Augmentation of Patsoi Part - IV WSS (SH- Repairing of SSF)

Progress Update : 19/11/2022
Ongoing
NDB (rural) Package IX
khmeenalini
24.80748517734833,93.94173431396518
24.7482872,93.8806443
9.0199900990011
75984
Augmentation of Malom Tulihal (Sh:- C/o OHT)

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7927084,93.86728
7.6925806022218
75984
Augmentation of Patsoi Part - IV WSS (SH- CO of OHT 2.0LL capacity)

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7927084,93.86728
7.6925806022218
75984
Augmentation of Patsoi Part - IV WSS (SH- CO of OHT 2.0LL capacity)

Progress Update : 19/11/2022
Ongoing
Package - IX
nansorai
24.80748517734833,93.94173431396518
24.7927084,93.86728
7.6925806022218
75984
Augmentation of Patsoi Part - IV WSS (SH- CO of OHT 2.0LL capacity)

Progress Update : 19/11/2022
On going work
Package 9
bantandb
24.80748517734833,93.94173431396518
24.8747977,93.8510299
11.822884139281
75984
Constn of OHT of Phumlou WSS

Progress Update : 19/11/2022
On going work
Package 9
bantandb
24.80748517734833,93.94173431396518
24.8747776,93.8510299
11.821470036583
75984
Constn of OHT of Phumlou WSS

Progress Update : 18/11/2022
Ongoing
Package xi
siai
24.80748517734833,93.94173431396518
24.3421055,93.6870127
57.801351045573
75984
Casting of pump house slab at Head Quarter veng Churachandpur Manipur

Progress Update : 18/11/2022
Ongoing
Package xi
siai
24.80748517734833,93.94173431396518
24.3428074,93.6879937
57.687274691945
75984
Casting of pump house slab at Head Quarter veng Churachandpur Manipur

Progress Update : 16/11/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.337334,93.6770082
58.731141403505
75984
Repairing of zone-ii WTP

Progress Update : 12/11/2022
Ongoing
1st Phase
Zarzolien
24.80748517734833,93.94173431396518
24.2148534,93.0465093
112.0032019413
75984
Providing drinking water supply at Sipuikon.

Progress Update : 12/11/2022
Ongoing (S/R)
1st phase
Zarzolien
24.80748517734833,93.94173431396518
24.2515177,93.105691
104.75364936742
75984
Providing Drinking Water Supply Scheme at Parbung

Progress Update : 12/11/2022
Ongoing (S/T)
1st phase
Zarzolien
24.80748517734833,93.94173431396518
24.2515177,93.105691
104.75364936742
75984
Providing Drinking Water Supply Scheme at Parbung

Progress Update : 08/11/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3540395,93.7017447
55.954058901744
75984
Casting dome for OHT at Bijang Churachandpur Manipur

Progress Update : 08/11/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3534077,93.7012353
56.039724637865
75984
Casting dome for OHT at Bijang Churachandpur Manipur

Progress Update : 08/11/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.353477,93.7013055
56.02969952474
75984
Dome reinforcement work for OHT at Bijang Churachandpur Manipur

Progress Update : 07/11/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3544903,93.7014095
55.923597635987
75984
Quarter building at Bijang Churachandpur Manipur

Progress Update : 07/11/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3542533,93.7017233
55.933569199582
75984
Formwork for OHT at Bijang Churachandpur Manipur

Progress Update : 01/11/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3322884,93.6927481
58.529176089267
75984
Reinforcement work for brassing beam at Ebenezer compound Churachandpur Manipur

Progress Update : 21/10/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3363775,93.6929115
58.11172528308
75984
Raft beam for OHT at Lamka college Churachandpur Manipur

Progress Update : 11/10/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3427267,93.6877668
57.705521912186
75984
Casting pump house column at head quarter veng Churachandpur Manipur

Progress Update : 08/10/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3322662,93.6922118
58.554754014119
75984
2nd lift Column casting work for OHT at Ebenezer compound Churachandpur Manipur

Progress Update : 08/10/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3322733,93.692225
58.553466138407
75984
2nd lift Column casting work for OHT at Ebenezer compound Churachandpur Manipur

Progress Update : 08/10/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3321662,93.6927316
58.542165182686
75984
2nd lift Column casting work for OHT at Lamka college Churachandpur Manipur

Progress Update : 08/10/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3329832,93.694822
58.36939959346
75984
PCC WORK for OHT at Lamka college Churachandpur Manipur

Progress Update : 01/10/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3323707,93.6953043
58.410167573303
75984
Earth work excavation for OHT at Lamka college Churachandpur Manipur

Progress Update : 24/09/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3321799,93.6919323
58.575599810866
75984
Casting raft work for OHT at Ebenezer compound Churachandpur Manipur

Progress Update : 14/09/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3323133,93.6923133
58.545603718155
75984
PCC work for OHT at Ebenezer compound Churachandpur Manipur

Progress Update : 07/09/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3377521,93.6772127
58.680317278226
75984
Renovation work at zone ii Churachandpur Manipur

Progress Update : 07/09/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3378581,93.6776946
58.647621791727
75984
Renovation work at zone ii Churachandpur Manipur

Progress Update : 07/09/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3286255,93.7073268
58.282271699605
75984
PCC work for pile cap at PT sport complex Churachandpur Manipur

Progress Update : 07/09/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3286338,93.7072984
58.282596386
75984
PCC work for pile cap at PT sport complex Churachandpur Manipur

Progress Update : 06/09/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3502161,93.7033758
56.266741043021
75984
Tile work for adm. building at Bijang Churachandpur Manipur

Progress Update : 24/08/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.330196,93.7049271
58.222111727973
75984
Pile work for OHT at PT sport complex Churachandpur Manipur

Progress Update : 24/08/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3322651,93.6915708
58.582824919679
75984
Clearance of site for OHT at Ebenezer Churachandpur Manipur

Progress Update : 19/08/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.2551788,93.6608979
67.662750526807
75984
Raft Reinforcement work for SR at Geljang Churachandpur Manipur

Progress Update : 19/08/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.2551788,93.6608979
67.662750526807
75984
Casting raft for ST at Lamjang Churachandpur Manipur

Progress Update : 19/08/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.2471417,93.6543133
68.754224100935
75984
Raft reinforcement work for SSF at Lamjang Churachandpur Manipur

Progress Update : 19/08/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.247235,93.6543017
68.745315175812
75984
Raft reinforcement work for SSF at Lamjang Churachandpur Manipur

Progress Update : 19/08/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.2472483,93.6542867
68.744616260427
75984
Raft reinforcement work for ST at Lamjang Churachandpur Manipur

Progress Update : 19/08/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.2470711,93.6586799
68.575743745786
75984
Raft reinforcement work for ST at Lamjang Churachandpur Manipur

Progress Update : 15/08/2022
Ongoing
First (Excavation for WTP)
eephzlphed
24.80748517734833,93.94173431396518
24.351742,93.3321234
79.79549807566
75984
Providing Dringking Water supply scheme at Leijangphai

Progress Update : 15/08/2022
Slow Sand Filtre
Ongoing
eephzlphed
24.80748517734833,93.94173431396518
24.2641306,93.2833565
89.915414326217
75984
Providing dringking water supply scheme at Thanlon

Progress Update : 11/08/2022
in progress
package XI
khup
24.80748517734833,93.94173431396518
24.5848271,93.7317321
32.603226610959
75984
constn. of Settling Tank at Lower komkeirap churachandpur manipur

Progress Update : 11/08/2022
in progress
package XI
khup
24.80748517734833,93.94173431396518
24.5848263,93.7318382
32.596321097737
75984
constn. of SSF Double unit at Lower komkeirap churachandpur manipur

Progress Update : 11/08/2022
in progress
package XI
khup
24.80748517734833,93.94173431396518
24.5848237,93.7318423
32.59627139432
75984
constn. of GLSR at Lower komkeirap churachandpur manipur

Progress Update : 09/08/2022
ongoing
package 1 balance
eemaintiiphed
24.80748517734833,93.94173431396518
24.807665,93.9664266
2.4922535395635
75984
construction of 0.8 MLD overhead tank at Porompat

Progress Update : 06/08/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3312203,93.6935349
58.602336238203
75984
Casting of columns for OHT 0.60ML at Bijang Churachandpur Manipur

Progress Update : 06/08/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3543506,93.7011072
55.950879153161
75984
Casting of columns for 0.60ML OHT at Bijang Churachandpur Manipur

Progress Update : 02/08/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8227318,93.9797113
4.1909348288785
75984
C/O service reservoir at iroisemba

Progress Update : 02/08/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.7975232,93.86728
7.5961177895867
75984
C/O service reservoir at iroisemba

Progress Update : 02/08/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.7975232,93.86728
7.5961177895867
75984
C/O service reservoir at iroisemba

Progress Update : 02/08/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.7975232,93.86728
7.5961177895867
75984
C/O service reservoir at iroisemba

Progress Update : 02/08/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.7975232,93.86728
7.5961177895867
75984
C/O service reservoir at iroisemba

Progress Update : 02/08/2022
Ongoing
I
ulen
24.80748517734833,93.94173431396518
24.7906497,93.8609173
8.3693855845178
75984
C/O chaukidar qtr at iroisemba

Progress Update : 02/08/2022
Ongoing
I
ulen
24.80748517734833,93.94173431396518
24.7906497,93.8609173
8.3693855845178
75984
C/O chaukidar qtr at iroisemba

Progress Update : 02/08/2022
Ongoing
I
ulen
24.80748517734833,93.94173431396518
24.8047916,93.8870094
5.5315211594171
75984
C/O chaukidar qtr at iroisemba

Progress Update : 02/08/2022
Ongoing
I
ulen
24.80748517734833,93.94173431396518
24.7960908,93.8653711
7.8110715167169
75984
C/O chaukidar qtr at iroisemba

Progress Update : 02/08/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81008949,93.88508434
5.7249102516279
75984
Laying of 800mm pipe. Lamdeng khunou bridge

Progress Update : 02/08/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.810026,93.8850998
5.72300053331
75984
Laying of 800mm pipe. Lamdeng khunou bridge

Progress Update : 02/08/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3378782,93.6771116
58.672493588172
75984
Renovation work at zone ii T/P Bungmual Churachandpur Manipur

Progress Update : 02/08/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.337949,93.6771088
58.665613550372
75984
Renovation work at zone ii T/P Bungmual Churachandpur Manipur

Progress Update : 02/08/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3379335,93.67717
58.66432564742
75984
Renovation work at zone ii T/P Bungmual Churachandpur Manipur

Progress Update : 02/08/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3371689,93.6771202
58.74233003521
75984
Renovation work at zone ii T/P Bungmual Churachandpur Manipur

Progress Update : 02/08/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3538992,93.70168
55.970958460617
75984
Casting of stair for OHT at Bijang Churachandpur Manipur

Progress Update : 02/08/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8134179,93.9296249
1.3888252514678
75984
C/O OHT & ESR AT LALAMBUNG.

Progress Update : 02/08/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8123209,93.9291366
1.3804695844706
75984
C/O OHT & ESR AT LALAMBUNG.

Progress Update : 02/08/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8134179,93.9296249
1.3888252514678
75984
C/O OHT & ESR AT LALAMBUNG.

Progress Update : 02/08/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.813274,93.928447
1.487515945954
75984
C/O OHT & ESR AT LALAMBUNG.

Progress Update : 02/08/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8132112,93.9283372
1.4945265587475
75984
C/O OHT & ESR AT LALAMBUNG.

Progress Update : 02/08/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8133324,93.9294831
1.3969865318859
75984
C/O OHT & ESR AT LALAMBUNG.

Progress Update : 02/08/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8140843,93.928402
1.5326428834955
75984
C/O OHT & ESR AT LALAMBUNG.

Progress Update : 02/08/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8123347,93.9291232
1.3823130706327
75984
C/O OHT & ESR AT LALAMBUNG.

Progress Update : 02/08/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8121993,93.9296762
1.3250732545924
75984
C/O OHT & ESR AT LALAMBUNG.

Progress Update : 02/08/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86340142,93.81094345
14.588791174204
75984
Laying of 800mm pipe. Abulok bridge

Progress Update : 02/08/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.861929,93.8106799
14.544023105991
75984
Laying of 800mm pipe. Abulok bridge

Progress Update : 02/08/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.861929,93.8106799
14.544023105991
75984
Laying of 800mm pipe. Abulok bridge

Progress Update : 02/08/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8546908,93.8186255
13.486234576948
75984
Laying of 800mm pipe. Abulok bridge

Progress Update : 02/08/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86697367,93.8068296
15.134517348673
75984
C/O laboratory building at kangchup

Progress Update : 02/08/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8638855,93.8065486
15.013542093014
75984
C/O laboratory building at kangchup

Progress Update : 02/08/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8638855,93.8065486
15.013542093014
75984
C/O laboratory building at kangchup

Progress Update : 02/08/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8649238,93.8094087
14.801211198057
75984
C/O laboratory building at kangchup

Progress Update : 02/08/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8649238,93.8094087
14.801211198057
75984
C/O laboratory building at kangchup

Progress Update : 02/08/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8649238,93.8094087
14.801211198057
75984
C/O laboratory building at kangchup

Progress Update : 02/08/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86710581,93.80699593
15.125850380611
75984
C/O laboratory building at kangchup

Progress Update : 01/08/2022
Active
Package II
ben
24.80748517734833,93.94173431396518
24.820122,93.9577325
2.1403743295599
75984
Construction of 0.20ML CAPACITY EMERGENCY RESERVOIR AT LAIWANGMA SHIFT 1

Progress Update : 01/08/2022
Active
package II
ben
24.80748517734833,93.94173431396518
24.8201042,93.9578502
2.1480560691703
75984
Construction of 0.45 ML CAPACITY OHT AT LAIWANGMA SHIFT 1

Progress Update : 28/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3544488,93.701433
55.926723041323
75984
Quarter building at Bijang Churachandpur Manipur

Progress Update : 28/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3561728,93.7024244
55.710445786496
75984
Adm. Building roofing at Bijang Churachandpur Manipur

Progress Update : 20/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3334658,93.7059129
57.849620639892
75984
1MLD GLSR Reinforcement work at Pangzol Churachandpur Manipur

Progress Update : 19/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3543622,93.7016591
55.925472727774
75984
Adm. Building roof trust at Bijang Churachandpur Manipur

Progress Update : 19/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3538706,93.701586
55.977947349927
75984
Curing of slab 1MLD GLSR at Bijang Churachandpur Manipur

Progress Update : 11/07/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86733187,93.80678168
15.156293008767
75984
C/O of laboratory building at kangchup

Progress Update : 11/07/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8671054,93.8109977
14.763938780963
75984
C/O of laboratory building at kangchup

Progress Update : 11/07/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8671054,93.8109977
14.763938780963
75984
C/O of laboratory building at kangchup

Progress Update : 11/07/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8671054,93.8109977
14.763938780963
75984
C/O of laboratory building at kangchup

Progress Update : 07/07/2022
in progress
package VII
rishi
24.80748517734833,93.94173431396518
24.589889,94.073019
27.590807117632
75984
augmentation of Heirok town WSS (SH: const. of OHT)

Progress Update : 07/07/2022
in progress
package VII
rishi
24.80748517734833,93.94173431396518
24.58920104,94.07394037
27.702676992479
75984
augmentation of Heirok town WSS (SH: const. of OHT)

Progress Update : 06/07/2022
Ongoing
Package VII (OT)
romen2022
24.80748517734833,93.94173431396518
24.6737491,94.0472956
18.296268025351
75984
0.45ML OHT Piling

Progress Update : 06/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.329974,93.7054243
58.223967792679
75984
DI pipe stacking at site Churachandpur Manipur

Progress Update : 06/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3300119,93.7055122
58.21647578422
75984
GI pipe stacking at site Churachandpur Manipur

Progress Update : 06/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3301512,93.7049615
58.225223439165
75984
GI pipe stacking at site Churachandpur Manipur

Progress Update : 06/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.329435,93.7061717
58.247695798668
75984
DI pipe stacking at site Churachandpur Manipur

Progress Update : 06/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.329734,93.7076833
58.154970559946
75984
GI pipe stacking at site Churachandpur Manipur

Progress Update : 06/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3312716,93.7055975
58.085176944041
75984
GI pipe stacking at site Churachandpur Manipur

Progress Update : 06/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3300956,93.7062142
58.178889720102
75984
GI pipe stacking at site Churachandpur Manipur

Progress Update : 06/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.32996,93.7058817
58.206420342179
75984
GI pipe stacking at site Churachandpur Manipur

Progress Update : 06/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3302799,93.7076481
58.100960819751
75984
DI pipe stacking at site Churachandpur Manipur

Progress Update : 06/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3296532,93.7058612
58.238400706077
75984
DI pipe stacking at site Churachandpur Manipur

Progress Update : 06/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3296583,93.7055733
58.249812901237
75984
DI pipe stacking at site Churachandpur Manipur

Progress Update : 06/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3424502,93.6869875
57.768162614014
75984
GLSR at Head Quarter veng Churachandpur Manipur

Progress Update : 06/07/2022
Nambol khathong water supply scheme.Package -7
1
arun123
24.80748517734833,93.94173431396518
24.6946235,93.8497845
15.610353919518
75984
Clear water reservoir chipping work is in progress.

Progress Update : 06/07/2022
Nambol khathong water supply scheme.Package -7
1
arun123
24.80748517734833,93.94173431396518
24.7015731,93.8532832
14.779937037543
75984
Settling tank 1st phase wall completed.

Progress Update : 06/07/2022
Nambol Kabowakching water supply scheme.Package -7
1
arun123
24.80748517734833,93.94173431396518
24.7182871,93.7932037
17.979404572655
75984
Over Head Tank pile completed

Progress Update : 06/07/2022
Nambol Kabowakching water supply scheme.Package -7
1
arun123
24.80748517734833,93.94173431396518
24.7126259,93.7973339
17.99492865374
75984
Slow sand filter pile 11 and 12 completed. Pile-13 and 14 bore is in progress

Progress Update : 06/07/2022
Nambol Kabowakching water supply scheme.Package -7
1
arun123
24.80748517734833,93.94173431396518
24.7193585,93.7947922
17.779865429119
75984
Clear water reservoir pile 1 completed. Pile-2 bore is in progress

Progress Update : 06/07/2022
Augmentation of kumbi water supply scheme
1
arun123
24.80748517734833,93.94173431396518
24.4409927,93.7963808
43.317768151496
75984
Kumbi Over Head tank piling work in progress package no.7

Progress Update : 06/07/2022
On going work
Pakage VII
mujibur
24.80748517734833,93.94173431396518
24.706755,93.9252168
11.323636687217
75984
OHT steel reinforcement of pile cap at Lilong Awang leikai

Progress Update : 06/07/2022
On going work
Pakage VII
mujibur
24.80748517734833,93.94173431396518
24.706755,93.9252168
11.323636687217
75984
OHT steel reinforcement of pile cap at Lilong Awang leikai

Progress Update : 05/07/2022
On going work
Pakage VII
mujibur
24.80748517734833,93.94173431396518
24.6991173,93.9481548
12.066806164353
75984
Service Reservoir at lilong Arapti

Progress Update : 05/07/2022
On going work
Pakage VII
mujibur
24.80748517734833,93.94173431396518
24.689865,93.93704
13.086725357133
75984
OHT at Turel Ahanbi for pile cap

Progress Update : 05/07/2022
Ongoing
Package - VII
suraj2022
24.80748517734833,93.94173431396518
24.6409449,93.9989187
19.397298649166
75984
Construction of OHT at Wangjing Town

Progress Update : 05/07/2022
On going work
Pakage VII
mujibur
24.80748517734833,93.94173431396518
24.6858174,93.9483516
13.54468115352
75984
OHT Hourou piling site

Progress Update : 04/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.354651,93.7014504
55.905700895759
75984
Casting Slab of GLSR at Bijang Churachandpur Manipur

Progress Update : 04/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3543,93.7018433
55.923625152273
75984
Casting Slab of GLSR at Bijang Churachandpur Manipur

Progress Update : 04/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3546328,93.7021086
55.878634843196
75984
Casting Slab of GLSR at Bijang Churachandpur Manipur

Progress Update : 04/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3543701,93.701044
55.951705117217
75984
Adm. Building at Bijang Churachandpur Manipur

Progress Update : 04/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3540529,93.7014673
55.964885859228
75984
Adm. Building at Bijang Churachandpur Manipur

Progress Update : 04/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3540008,93.7015698
55.965609026289
75984
Slab work for GLSR at Bijang Churachandpur Manipur

Progress Update : 04/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3542933,93.7017483
55.928463619874
75984
Work progress of OHT 0.6mld at Bijang Churachandpur Manipur

Progress Update : 04/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3558867,93.6989362
55.893127735699
75984
Work progress of OHT 0.6mld at Bijang Churachandpur Manipur

Progress Update : 04/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3543627,93.701873
55.916038326233
75984
Reinforced work of GLSR at Bijang Churachandpur Manipur

Progress Update : 02/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3416771,93.6884728
57.778426508069
75984
Casting of slab for GLSR at Head Quarter veng Churachandpur Manipur

Progress Update : 02/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.342805,93.68736
57.716042132669
75984
Casting of slab for GLSR at Head Quarter veng Churachandpur Manipur

Progress Update : 02/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3435084,93.6894239
57.553189756251
75984
Casting of slab for GLSR at Head Quarter veng Churachandpur Manipur

Progress Update : 02/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.34391,93.6881558
57.570144248372
75984
Casting of slab for GLSR at Head Quarter veng Churachandpur Manipur

Progress Update : 02/07/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3438793,93.6894239
57.516209192223
75984
Slamp test for GLSR at Head Quarter veng Churachandpur Manipur

Progress Update : 30/06/2022
On going
RWS Package-IX (W)
korouhanbang
24.80748517734833,93.94173431396518
24.7132092,93.8818931
12.099132357195
75984
Providing drinking water supply to rural areas of Manipur 264 Schemes, work package- IX (W) (SH:- Repairing of Slow Sand Filter at Irom Meijrao)

Progress Update : 30/06/2022
On going
RWS Package-IX (W)
korouhanbang
24.80748517734833,93.94173431396518
24.7132092,93.8818931
12.099132357195
75984
Providing drinking water supply to rural areas of Manipur 264 Schemes, work package- IX (W) (SH:- Repairing of Slow Sand Filter at Irom Meijrao)

Progress Update : 30/06/2022
Drinking water supply other town package-VI(w)
Package -VI 2.2 MLD WTP AT SAMUROU
khmeenalini
24.80748517734833,93.94173431396518
24.69585,93.9029257
13.016544830823
75984
Step type intake

Progress Update : 30/06/2022
Drinking water supply other town package-VI(w)
Package -VI 2.2 MLD WTP AT SAMUROU
khmeenalini
24.80748517734833,93.94173431396518
24.69585,93.9029257
13.016544830823
75984
Step type intake

Progress Update : 30/06/2022
Drinking water supply other town package-VI(w)
Package -VI 2.2 MLD WTP AT SAMUROU
khmeenalini
24.80748517734833,93.94173431396518
24.696686,93.9041162
12.892000371686
75984
Settling tank

Progress Update : 30/06/2022
Drinking water supply other town package-VI(w)
Package -VI 2.2 MLD WTP AT SAMUROU
khmeenalini
24.80748517734833,93.94173431396518
24.6966614,93.9041794
12.892735922646
75984
Settling tank

Progress Update : 30/06/2022
Drinking water supply other town package-VI(w)
Package -VI 2.2 MLD WTP AT SAMUROU
khmeenalini
24.80748517734833,93.94173431396518
24.6967919,93.903813
12.889809599751
75984
Slow sand filter

Progress Update : 30/06/2022
Drinking water supply other town package-VI(w)
Package -VI 2.2 MLD WTP AT SAMUROU
khmeenalini
24.80748517734833,93.94173431396518
24.6967798,93.9037588
12.892720983196
75984
Slow sand filter

Progress Update : 30/06/2022
Drinking water supply other town package-VI(w)
Package -VI 2.2 MLD WTP AT SAMUROU
khmeenalini
24.80748517734833,93.94173431396518
24.6967922,93.903814
12.889747751812
75984
Slow sand filter

Progress Update : 30/06/2022
Drinking water supply other town package-VI(w)
Package -VI 2.2 MLD WTP AT SAMUROU
khmeenalini
24.80748517734833,93.94173431396518
24.6967922,93.9038084
12.889915734814
75984
Slow sand filter

Progress Update : 30/06/2022
Drinking water supply other town package-VI(w)
Package -VI 2.2 MLD WTP AT SAMUROU
khmeenalini
24.80748517734833,93.94173431396518
24.6967938,93.9038161
12.889514882519
75984
Slow sand filter

Progress Update : 30/06/2022
Drinking water supply other town package-VI(w)
Package -VI 2.2 MLD WTP AT SAMUROU
khmeenalini
24.80748517734833,93.94173431396518
24.6967938,93.9038161
12.889514882519
75984
Slow sand filter

Progress Update : 30/06/2022
Drinking water supply other town package-VI(w)
Package -VI 2.2 MLD WTP AT SAMUROU
khmeenalini
24.80748517734833,93.94173431396518
24.6967938,93.9038161
12.889514882519
75984
Slow sand filter

Progress Update : 30/06/2022
On going
RWS Package-IX (W)
korouhanbang
24.80748517734833,93.94173431396518
24.7151505,93.9299947
10.33485086232
75984
Providing drinking water supply to rural areas of Manipur 264 Schemes, work package- IX (W) (SH:- Construction of 200 KL Overhead tank at Chajing Karam)

Progress Update : 30/06/2022
On going
Package-VI (W)
korouhanbang
24.80748517734833,93.94173431396518
24.7405846,93.9347731
7.4717713523827
75984
Drinking water supply other town (13 nos) package -VI (W) 1.764 MLD WTP at Lilong Chajing town A (SH:- Laying of pipeline at Lagthabal Mayai leikai areas)

Progress Update : 30/06/2022
On going
Package-VI (W)
korouhanbang
24.80748517734833,93.94173431396518
24.7405846,93.9347731
7.4717713523827
75984
Drinking water supply other town (13 nos) package -VI (W) 1.764 MLD WTP at Lilong Chajing town A (SH:- Laying of pipeline at Lagthabal Mayai leikai areas)

Progress Update : 20/06/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.35751,93.690995
56.08929421045
75984
Shuttering work for 2MLD GLSR at Soialbuhjang Churachandpur Manipur

Progress Update : 20/06/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3567362,93.6944969
56.00715349291
75984
Shuttering work for 2MLD GLSR at Soialbuhjang Churachandpur Manipur

Progress Update : 20/06/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3546531,93.7023009
55.868171581882
75984
1st lift shuttering of column for OHT at Bijang Churachandpur Manipur

Progress Update : 17/06/2022
On going
I
bushndb
24.80748517734833,93.94173431396518
24.820801,93.8640827
7.975534501572
75984
Construction of Brick wall at Lamshang

Progress Update : 17/06/2022
On going
I
bushndb
24.80748517734833,93.94173431396518
24.8208247,93.864088
7.9754978175406
75984
Construction of Brick wall at Lamshang

Progress Update : 17/06/2022
On going
I
bushndb
24.80748517734833,93.94173431396518
24.8207267,93.8641234
7.9699703548611
75984
Construction of SSF at Lamshang

Progress Update : 17/06/2022
On going
I
bushndb
24.80748517734833,93.94173431396518
24.820727,93.8641238
7.9699368327474
75984
Construction of SSF at Lamshang

Progress Update : 17/06/2022
On going
I
bushndb
24.80748517734833,93.94173431396518
24.8207483,93.864099
7.9728337434237
75984
Construction of OHT at Lamshang

Progress Update : 17/06/2022
Work in progress
Package-VI
korouhanbang
24.80748517734833,93.94173431396518
24.7269819,93.9301276
9.0275050882617
75984
Drinking water supply other town (13 Nos.) Package-VI (IW) 1.76 MLD WTP at Lilong Chajing town A( SH:- Construction of Step type intake )

Progress Update : 17/06/2022
Work in progress
Package-VI
korouhanbang
24.80748517734833,93.94173431396518
24.7270042,93.9299947
9.0267985477094
75984
Drinking water supply other town (13 Nos.) Package-VI (IW) 1.76 MLD WTP at Lilong Chajing town A( SH:- Construction of clear Water reservoir capacity 0.70 ML )

Progress Update : 17/06/2022
Work in progress
Package-VI
korouhanbang
24.80748517734833,93.94173431396518
24.7270042,93.9299947
9.0267985477094
75984
Drinking water supply other town (13 Nos.) Package-VI (IW) 1.76 MLD WTP at Lilong Chajing town A( SH:- Construction of clear Water reservoir capacity 0.70 ML )

Progress Update : 17/06/2022
Work in progress
Package-VI
korouhanbang
24.80748517734833,93.94173431396518
24.7276876,93.9284047
8.9741407532051
75984
Drinking water supply other town (13 Nos.) Package-VI (IW) 1.76 MLD WTP at Lilong Chajing town A( SH:- Repairing of Slow sand filter )

Progress Update : 17/06/2022
Work in progress
Package-VI
korouhanbang
24.80748517734833,93.94173431396518
24.7276876,93.9284047
8.9741407532051
75984
Drinking water supply other town (13 Nos.) Package-VI (IW) 1.76 MLD WTP at Lilong Chajing town A( SH:- Construction of Slow sand filter )

Progress Update : 15/06/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3538333,93.7018367
55.97069534918
75984
Curing of pile cap for OHT at Bijang Churachandpur Manipur

Progress Update : 14/06/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.354706,93.7019247
55.879363969952
75984
Plastering wall of Administrative building at Bijang Churachandpur Manipur

Progress Update : 14/06/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3538645,93.7012606
55.992838648481
75984
Casting of pile cap for OHT at Bijang Churachandpur Manipur

Progress Update : 14/06/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3425145,93.6871169
57.75592643223
75984
Shuttering and reinforcement work for slab and Beam 1MLD at Head Quarter veng Churachandpur Manipur

Progress Update : 14/06/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3426417,93.68757
57.722846984156
75984
Shuttering and reinforcement work for slab and Beam 1MLD at Head Quarter veng Churachandpur Manipur

Progress Update : 13/06/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3574086,93.6973507
55.811879833009
75984
Shuttering and reinforcement work for 1MLD GLSR at Bijang Churachandpur Manipur

Progress Update : 13/06/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3546241,93.7020943
55.880133845343
75984
Casting of raft for OHT at Bijang Churachandpur Manipur

Progress Update : 13/06/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.35388,93.701825
55.966526614181
75984
Reinforcement work for OHT at Bijang, Churachandpur manipur

Progress Update : 13/06/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.353894,93.7013007
55.988122051402
75984
Reinforcement work for OHT at Bijang, Churachandpur manipur

Progress Update : 09/06/2022
Ongoing
Package - XI NDB
Zarzolien
24.80748517734833,93.94173431396518
24.2512038,93.1028712
105.00469617761
75984
Water supply scheme at Parbung, Service Reservoir

Progress Update : 08/06/2022
Ongoing
I - Phase
Zarzolien
24.80748517734833,93.94173431396518
24.2047986,92.9727124
118.75249298092
75984
Providing dringking w/s scheme at Sipuikon (Treatment Plan) under Package-Il NDB

Progress Update : 08/06/2022
Providing drinking water supply scheme at Sipuikon
Start
Zarzolien
24.80748517734833,93.94173431396518
24.1916663,93.0302976
114.85847713605
75984
Intake point area

Progress Update : 07/06/2022
On Going
Ongoing
Zarzolien
24.80748517734833,93.94173431396518
24.2622619,93.2839854
90.008490104976
75984
Water Supply Scheme at Thanlon SR

Progress Update : 07/06/2022
On Going
Ongoing
Zarzolien
24.80748517734833,93.94173431396518
24.263407,93.2821126
90.062804426359
75984
Water Supply Scheme at Thanlon

Progress Update : 07/06/2022
On Going
Ongoing
Zarzolien
24.80748517734833,93.94173431396518
24.2641711,93.2814697
90.053823663786
75984
Water Supply Scheme at Thanlon Settling Tank

Progress Update : 02/06/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.7430373,93.9446578
7.1720076255512
75984
C/O laboratory building at kangchup. Door and windows

Progress Update : 02/06/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86714637,93.80706178
15.121854058585
75984
C/O laboratory building at kangchup. Door and windows

Progress Update : 27/05/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3425136,93.6879593
57.718094716983
75984
Casting of 5th lift wall for GLSR 2MLD at Head Quarter veng Churachandpur Manipur

Progress Update : 27/05/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.342678,93.6877726
57.710112364314
75984
Casting of 5th lift wall for GLSR 2MLD at Head Quarter veng Churachandpur Manipur

Progress Update : 24/05/2022
Ongoing
Package X
romen2022
24.80748517734833,93.94173431396518
24.6855121,94.1362773
23.871465786038
75984
Land development at Phanjakhong WSS

Progress Update : 24/05/2022
Ongoing
Package X
romen2022
24.80748517734833,93.94173431396518
24.6855258,94.1361044
23.856233169492
75984
Settling tank at Phanjakhong WSS

Progress Update : 23/05/2022
Ongoing
I
ulen
24.80748517734833,93.94173431396518
24.81082579,93.88801436
5.4345527647512
75984
C/O chw qtr at iroisemba. Slab

Progress Update : 23/05/2022
Ongoing
I
ulen
24.80748517734833,93.94173431396518
24.8112324,93.887586
5.4809283649601
75984
C/O chw qtr at iroisemba. Slab

Progress Update : 23/05/2022
Ongoing
I
ulen
24.80748517734833,93.94173431396518
24.81044584,93.88779663
5.4537719583456
75984
C/O chw qtr at iroisemba. Slab

Progress Update : 23/05/2022
Ongoing
I
ulen
24.80748517734833,93.94173431396518
24.7975232,93.86728
7.5961177895867
75984
C/O chw qtr at iroisemba. Slab

Progress Update : 21/05/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.2934126,93.6751589
63.19878068317
75984
Stacking of Di pipes for raw main at Churachandpur Manipur

Progress Update : 20/05/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3646967,93.70592
54.702955158032
75984
Stacking of DI pipes(different size) for distribution at Churachandpur, Manipur

Progress Update : 20/05/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3649115,93.7059902
54.678357267985
75984
Stacking of DI pipes(different size) for distribution at Churachandpur, Manipur

Progress Update : 20/05/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3649905,93.7060502
54.667804062799
75984
Stacking of DI pipes(different size) for distribution at Churachandpur, Manipur

Progress Update : 20/05/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3675685,93.7065472
54.387870848326
75984
Stacking of DI pipes(different size) for distribution at Churachandpur, Manipur

Progress Update : 20/05/2022
Ongoing
Package IX
bushndb
24.80748517734833,93.94173431396518
24.7724972,93.8466042
10.360869305897
75984
Piling for OHT Awangkhunou

Progress Update : 20/05/2022
Ongoing
Package IX
bushndb
24.80748517734833,93.94173431396518
24.7840608,93.843424
10.259439794958
75984
Repairing of Slow Sand Filter Awangkhunou

Progress Update : 20/05/2022
Ongoing
Package IX
bushndb
24.80748517734833,93.94173431396518
24.93551,93.88433
15.367793930152
75984
Repairing of Slow Sand Filter Awangkhunou

Progress Update : 20/05/2022
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.543513,93.7582694
34.714334062308
75984
Package IX/phubala/service reservoir /excavation

Progress Update : 20/05/2022
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.5379532,93.7582694
35.238777872433
75984
Package IX/phubala/slow sand filter /excavation

Progress Update : 20/05/2022
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.5291674,93.753825
36.306392824056
75984
Package IX/Sunusiphai/Servicr Reservoir (Earthwork Excavation)

Progress Update : 20/05/2022
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.5291674,93.753825
36.306392824056
75984
Package IX/Sunusiphai/Slow Sand Filter(PCC)

Progress Update : 20/05/2022
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.5291674,93.753825
36.306392824056
75984
Package IX/Sunusiphai/Settling Tank(PCC)

Progress Update : 20/05/2022
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.5279925,93.7563646
36.284727980388
75984
Package IX/Sunusiphai/Impounding Pond

Progress Update : 20/05/2022
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.5279925,93.7563646
36.284727980388
0
Package IX/Sunusiphai/Impounding Pond

Progress Update : 20/05/2022
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.5268883,93.7560471
36.406501822109
75984
Package IX/naranseina/ impoundding pond

Progress Update : 20/05/2022
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.5165346,93.7469111
37.869753714757
0
Package IX/naranseina/ service reservoir excavation

Progress Update : 20/05/2022
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.5165346,93.7469111
37.869753714757
0
Package IX/naranseina/ slow sand filter excavation

Progress Update : 20/05/2022
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.5165402,93.7469141
37.869063983821
0
Package IX/naranseina/ settling tank excavation

Progress Update : 20/05/2022
Ongoing
Package IX
bushndb
24.80748517734833,93.94173431396518
24.8480169,93.8189434
13.185278308152
75984
Repairing of Settling Tank Thangaching

Progress Update : 20/05/2022
Ongoing
Package IX
bushndb
24.80748517734833,93.94173431396518
24.8480169,93.8189434
13.185278308152
0
Repairing of Settling Tank Thangaching

Progress Update : 20/05/2022
Ongoing
Package IX
bushndb
24.80748517734833,93.94173431396518
24.9161933,93.8898583
13.171570868007
0
Repairing of Settling Tank Tendongyan

Progress Update : 20/05/2022
Ongoing
Package IX
bushndb
24.80748517734833,93.94173431396518
24.9161933,93.8898583
13.171570868007
0
Repairing of Settling Tank Tendongyan

Progress Update : 20/05/2022
Ongoing
Package IX
bushndb
24.80748517734833,93.94173431396518
24.9161933,93.8898583
13.171570868007
0
Repairing of SSF Tendongyan

Progress Update : 20/05/2022
On going
Package RWS IX
damudarndb
24.80748517734833,93.94173431396518
24.7943909,93.8661321
7.7685347955393
75984
Aug of PatsoiI Rep of ST SSF and Aug of patsoi pt Iv Poling work for OHT

Progress Update : 20/05/2022
Ongoing
Initial
jimy71
24.80748517734833,93.94173431396518
24.8113926,93.8173542
12.560915548614
75984
Aug of Ngairangbam WSS [SH: Construction of OHT 0.15 ML capacity]

Progress Update : 20/05/2022
On going
Package RWS IX
damudarndb
24.80748517734833,93.94173431396518
24.7865861,93.8892374
5.7860562017381
75984
Aug of Patsoi pt II Rep of ST SSF and constn of SSF

Progress Update : 20/05/2022
On going
Package RWS IX
damudarndb
24.80748517734833,93.94173431396518
24.7865861,93.8892374
5.7860562017381
75984
Aug of Patsoi pt II Rep of ST SSF and constn of SSF

Progress Update : 20/05/2022
On going
Package RWS IX
damudarndb
24.80748517734833,93.94173431396518
24.778952,93.8899566
6.1140439254346
75984
Aug of Tabungkhok Rep of ST SSF and piling work

Progress Update : 20/05/2022
On going
Package RWS IX
damudarndb
24.80748517734833,93.94173431396518
24.7783802,93.8914655
6.0183234420166
75984
Aug of Tabungkhok Rep of ST SSF and piling work

Progress Update : 20/05/2022
Ongoing
phase-I
arun123
24.80748517734833,93.94173431396518
24.42676582,93.75120688
46.507158159616
75984
Package-IX/saiton/repairing of treatment unit

Progress Update : 20/05/2022
Ongoing
Initial
jimy71
24.80748517734833,93.94173431396518
24.7175399,93.8227578
15.630780859667
75984
Aug of Awang Jiri WSS [SH: Construction of OHT 0.2 ML capacity]

Progress Update : 20/05/2022
Ongoing
Initial
jimy71
24.80748517734833,93.94173431396518
24.7693373,93.8106799
13.892623546114
75984
Aug of Awang Jiri WSS [SH: Construction of OHT 0.2 ML capacity]

Progress Update : 20/05/2022
Ongoing
phase-I
arun123
24.80748517734833,93.94173431396518
24.42677836,93.75102085
46.513679168113
75984
Package-IX/saiton/earthwork excavation of service reservoir

Progress Update : 20/05/2022
Ongoing
1
telein123
24.80748517734833,93.94173431396518
24.4628971,93.797354
40.999336926619
75984
Package IX/Keibul Lamjao/Repairing of SSF

Progress Update : 20/05/2022
Ongoing
phase-I
arun123
24.80748517734833,93.94173431396518
24.42644785,93.75104632
46.54607027879
75984
Package-IX/saiton/repairing of settling tank

Progress Update : 20/05/2022
On going
Package RWS IX
damudarndb
24.80748517734833,93.94173431396518
24.7717133,93.8914655
6.4474018560208
75984
Aug of changangei rep of ST SSF and piling work

Progress Update : 20/05/2022
On going
Work package: RWS P-IX (W)
dinath
24.80748517734833,93.94173431396518
24.7021964,93.9235538
11.850066502633
75984
Providing drinking water supply to rural areas of Manipur 264 schemes, RWS P-IX (W) (SH:- Construction of 200KL Overhead tank at Chajing Karam)

Progress Update : 20/05/2022
On going
Work package: RWS P-IX (W)
dinath
24.80748517734833,93.94173431396518
24.7213124,93.8924204
10.797931882808
75984
Providing drinking water supply to rural areas of Manipur 264 schemes, RWS P-IX (W) (SH:- Construction of 200KL Overhead tank at Chajing Karam)

Progress Update : 20/05/2022
Ongoing
Initial
jimy71
24.80748517734833,93.94173431396518
24.7365611,93.832295
13.57442586515
75984
Aug of Top Khabi WSS [SH:- Enerzisation]

Progress Update : 20/05/2022
Ongoing
phase-I
arun123
24.80748517734833,93.94173431396518
24.42065317,93.77301839
46.269551786132
75984
Package-IX/sagolpat/repairing of service reservoir

Progress Update : 20/05/2022
Ongoing
1
telein123
24.80748517734833,93.94173431396518
24.5287977,93.8278441
33.05496675501
75982
Package IX/Keirenphabi/Construction of OHT

Progress Update : 20/05/2022
Ongoing
phase-I
arun123
24.80748517734833,93.94173431396518
24.42075037,93.77308273
46.257105441483
75982
Package-IX/sagolpat/repairing of treatment unit

Progress Update : 20/05/2022
Ongoing
phase-I
arun123
24.80748517734833,93.94173431396518
24.42071474,93.77290492
46.267416088134
0
Package-IX/sagolpat/repairing settling tank

Progress Update : 20/05/2022
On going
Work package: RWS P-IX (W)
dinath
24.80748517734833,93.94173431396518
24.7131609,93.8819422
12.101312170971
75982
Providing drinking water supply to rural areas of Manipur 264 schemes, RWS P-IX (W) (SH:- Construction of 250KL Overhead tank at Irom Meijrao)

Progress Update : 20/05/2022
Ongoing
phase-I
arun123
24.80748517734833,93.94173431396518
24.42060305,93.77305184
46.273487424083
0
Package-IX/sagolpat/repairing of treatment unit

Progress Update : 20/05/2022
Ongoing
phase-I
arun123
24.80748517734833,93.94173431396518
24.42060305,93.77305184
46.273487424083
0
Package-IX/sagolpat/repairing of treatment unit

Progress Update : 20/05/2022
On going
Phase 1
bantandb
24.80748517734833,93.94173431396518
24.8439917,93.8170363
13.222306802127
75982
Augmentation Of Tairenpokpi Water supply scheme

Progress Update : 20/05/2022
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.5794092,93.745572
32.184058522289
75982
Package IX/ Upokpi/ Slow Sand Filter (1.5.10)

Progress Update : 20/05/2022
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.5794092,93.745572
32.184058522289
75984
Package IX/ Upokpi/ Settling tank (Base slab reinforcement)

Progress Update : 20/05/2022
Ongoing
Initial
nansorai
24.80748517734833,93.94173431396518
24.7751677,93.8595876
9.037203586474
75982
Aug of Sagoltongba WSS (SH :- Repairing of SSF)

Progress Update : 20/05/2022
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.595408,93.7728754
29.103364239486
75984
Package IX/ Nachou and Potsangbam/OHT piling

Progress Update : 20/05/2022
Ongoing
Package IX
telein123
24.80748517734833,93.94173431396518
24.5287977,93.8278441
33.05496675501
75982
Package IX/Thanga/Repairing of SSF

Progress Update : 20/05/2022
Ongoing
phase-I
arun123
24.80748517734833,93.94173431396518
24.43140347,93.83224833
43.256066343098
75984
Package-IX/ithai/repairing of treatment unit

Progress Update : 20/05/2022
Ongoing
1
salam
24.80748517734833,93.94173431396518
24.5898569,93.7725578
29.624390845981
75984
Package IX/Nachou and potsangbam/Remodelling of canal

Progress Update : 20/05/2022
Ongoing
phase-I
arun123
24.80748517734833,93.94173431396518
24.43133873,93.83211726
43.266416971533
0
Package-IX/ithai/repairing of treatment unit

Progress Update : 20/05/2022
Ongoing
Package IX
telein123
24.80748517734833,93.94173431396518
24.4263144,93.775416
45.594929327948
75982
Package ix/ Charangpat / Aerator (Upto PCC, 1:5:10)

Progress Update : 20/05/2022
Ongoing
Initial
nansorai
24.80748517734833,93.94173431396518
24.7701149,93.86728
8.587905491157
75984
Aug of Yurembam WSS SH- Repairing of SSF

Progress Update : 20/05/2022
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.6163729,93.7792271
26.851075387992
75984
Package IX/KHOIJUMAN/Brick wall fencing

Progress Update : 20/05/2022
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.6145597,93.7776391
27.108754295152
75984
Package IX/KHOIJUMAN/settling tank excavation

Progress Update : 20/05/2022
On going
Phase 1
bantandb
24.80748517734833,93.94173431396518
24.8159099,93.8723708
7.0629671752076
75984
Constn of Sanjenbam wss-constn of settling Tank

Progress Update : 20/05/2022
Ongoing
1
telein123
24.80748517734833,93.94173431396518
24.4505124,93.741446
44.556069030883
75984
Package ix/Kwakta Khuman/ Renovation of Slow Sand Filter

Progress Update : 20/05/2022
Ongoing
Package IX
arun123
24.80748517734833,93.94173431396518
24.6163729,93.7792271
26.851075387992
75982
Package IX/KHOIJUMAN/OHT PILE WORK

Progress Update : 20/05/2022
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.6163729,93.7792271
26.851075387992
75984
Package IX/KHOIJUMAN/service reservoir excavation

Progress Update : 20/05/2022
On going
Phase 1
bantandb
24.80748517734833,93.94173431396518
24.8159099,93.8723708
7.0629671752076
75984
Constn of Sanjenbam wss-constn of OHT

Progress Update : 20/05/2022
Ongoing
1
arun123
24.80748517734833,93.94173431396518
24.6547391,93.7712876
24.181769464284
75984
Package IX/KHOIJUMAN/intake canal

Progress Update : 19/05/2022
Ongoing
P1 Balance work
herojit
24.80748517734833,93.94173431396518
24.8082987,93.9653651
2.3867455604297
60786.7
OHT paiting work

Progress Update : 19/05/2022
Ongoing
P1 Balance work
herojit
24.80748517734833,93.94173431396518
24.8082987,93.9653651
2.3867455604297
75984
OHT paiting work

Progress Update : 19/05/2022
Ongoing
P1 Balance work
herojit
24.80748517734833,93.94173431396518
24.8069162,93.9670638
2.5572758268401
75984
OHT paiting work

Progress Update : 19/05/2022
Ongoing
P1 Balance work
herojit
24.80748517734833,93.94173431396518
24.8069162,93.9670638
2.5572758268401
75982
OHT paiting work

Progress Update : 19/05/2022
Ongoing
P1 Balance work
herojit
24.80748517734833,93.94173431396518
24.8095122,93.9676445
2.6247700872286
75984
Chinga reservoir slab shuttering

Progress Update : 11/05/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3650768,93.7060937
54.657247273797
75984
Stacking of Di pipe

Progress Update : 09/05/2022
Work in progress
package II
pahten123
24.80748517734833,93.94173431396518
24.7501539,93.929109
6.5008107678225
75982
canchipur lab building - Painting work in progress

Progress Update : 06/05/2022
Ongoing
Water supply project at Wangjing Town WSS
romen123
24.80748517734833,93.94173431396518
24.7933575,93.9408339
1.573477346765
60786.7
Demolition of PS Tank - completed

Progress Update : 06/05/2022
on going
NDB package 7
shanti123
24.80748517734833,93.94173431396518
24.58949053,94.07397989
27.676399813143
60786.7
Aug of Heirok town WSS (ground development work for OHT)

Progress Update : 06/05/2022
on going
NDB package 7
shanti123
24.80748517734833,93.94173431396518
24.58952321,94.07399517
27.673961862742
75984
Aug of Heirok town WSS (ground development work of OHT)

Progress Update : 06/05/2022
on going
NDB package 7
shanti123
24.80748517734833,93.94173431396518
24.58952669,94.07399711
27.673717532265
60786.7
Aug of Heirok town WSS (ground development work of OHT)

Progress Update : 06/05/2022
on going
NDB package 7
shanti123
24.80748517734833,93.94173431396518
24.58978472,94.07371536
27.634846835484
60786.7
Aug of Heirok town WSS (ground development work of OHT)

Progress Update : 05/05/2022
On going
Pakage VII
eetblphed
24.80748517734833,93.94173431396518
24.6863817,93.9482175
13.481349201143
60786.7
Pile casting at lilong Haorou(Lilong Arapti)

Progress Update : 05/05/2022
On going
Pakage VII
eetblphed
24.80748517734833,93.94173431396518
24.6857226,93.9503855
13.566884256749
60786.7
Pile casting at lilong Haorou(Lilong Arapti)

Progress Update : 05/05/2022
On going
Package VII
eetblphed
24.80748517734833,93.94173431396518
24.691309,93.9350916
12.934983178448
75984
Pile casting at lilong Turel Ahanbi(lilong Arapti)

Progress Update : 05/05/2022
On going
Package VII
eetblphed
24.80748517734833,93.94173431396518
24.691309,93.9350916
12.934983178448
75984
Pile casting at lilong Turel Ahanbi(lilong Arapti)

Progress Update : 05/05/2022
On going
Pakage VII
eetblphed
24.80748517734833,93.94173431396518
24.7094463,93.9283917
10.983832511572
75984
Pile casting at Haoreibi Awang leikai(lilong Arapati)

Progress Update : 05/05/2022
On going
Pakage VII
eetblphed
24.80748517734833,93.94173431396518
24.7096687,93.9271279
10.975707564101
75984
Pile casting at Haoreibi Awang leikai(lilong Arapati)

Progress Update : 05/05/2022
On going
Pakage VII
eetblphed
24.80748517734833,93.94173431396518
24.7096687,93.9271279
10.975707564101
75984
Pile casting at Haoreibi Awang leikai(lilong Arapati)

Progress Update : 05/05/2022
In progress
1
telein123
24.80748517734833,93.94173431396518
24.5835568,93.7427155
32.002232195572
75984
Repairing and laying of existing Slow Sand Filter bed for Upgradation of Ningthoukhong Water Supply Scheme, pkg 7

Progress Update : 05/05/2022
In progress
1
telein123
24.80748517734833,93.94173431396518
24.580566,93.7418748
32.314781994801
75984
Demolition of existing structures of Upgradation of Ningthoukhong Water Supply Scheme, pkg 7

Progress Update : 30/04/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3167289,93.6925945
60.102743908528
60786.7
Earth work :1mld capacity GLSR at Pangzawl, Churachandpur Manipur

Progress Update : 30/04/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.2922999,93.6751589
63.310751248669
60786.7
600mm dia for raw main pipeline

Progress Update : 29/04/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3541317,93.7016933
55.947072227476
60786.7
Pile work for OHT at Bijang, Churachandpur Manipur

Progress Update : 29/04/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3538632,93.7012896
55.991695633354
75984
Fill lift of wall casting for GLRS 1MLD at Bijang, Churachandpur Manipur

Progress Update : 29/04/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.354262,93.7013468
55.949225156121
75984
Fill lift of wall for GLRS 1MLD at Bijang, Churachandpur Manipur

Progress Update : 29/04/2022
Onging
Drinking water supply other town(13)nos package VI(W)
gobinndb
24.80748517734833,93.94173431396518
24.6739714,93.9047985
15.306742231892
60786.7
Pile cap for OHT 4.5 Lakhs ltrs cap.

Progress Update : 29/04/2022
Onging
Drinking water supply other town(13)nos package VI(W)
gobinndb
24.80748517734833,93.94173431396518
24.6747166,93.9035624
15.257449622528
60786.7
Aug of Wangoi wss c/o Slow Sand Filter

Progress Update : 29/04/2022
Onging
Drinking water supply other town(13)nos package VI(W)
gobinndb
24.80748517734833,93.94173431396518
24.6747166,93.9035624
15.257449622528
75984
Aug of Wangoi wss c/o Settling Tank

Progress Update : 28/04/2022
On going
Package 6
damudarndb
24.80748517734833,93.94173431396518
24.7999169,93.9101999
3.2922086254895
75984
Augtn lamjaootongba OHT 4.5 LAKH

Progress Update : 28/04/2022
On going
Package 6
damudarndb
24.80748517734833,93.94173431396518
24.8002857,93.9103635
3.2659505468175
60786.7
Augtn lamjaootongba SSF

Progress Update : 28/04/2022
On going
Package 6
damudarndb
24.80748517734833,93.94173431396518
24.8002894,93.9103745
3.264773279205
60786.7
Augtn lamjaootongba Settling

Progress Update : 27/04/2022
NDB
On going
bushndb
24.80748517734833,93.94173431396518
24.81972,93.8682345
7.5416285934318
60786.7
Construction of Brick wall fencing at Lamshang

Progress Update : 27/04/2022
NDB
On going
bushndb
24.80748517734833,93.94173431396518
24.81972,93.8682345
7.5416285934318
60786.7
Construction of SSF at Lamshang

Progress Update : 27/04/2022
NDB
On going
bushndb
24.80748517734833,93.94173431396518
24.8212342,93.8669619
7.6996003371477
75984
Construction of OHT at Lamshang

Progress Update : 27/04/2022
On going
Package VI
bantandb
24.80748517734833,93.94173431396518
24.9520556,93.8695839
17.645499171892
60786.7
Augmentation Of Sekmai Town - laying of raw water main

Progress Update : 27/04/2022
On going
Package VI
bantandb
24.80748517734833,93.94173431396518
24.9468584,93.8748352
16.902413806703
60786.7
Augmentation Of Sekmai Town - SSF

Progress Update : 27/04/2022
On going
Package VI
bantandb
24.80748517734833,93.94173431396518
24.9541623,93.8669619
17.968527714561
75984
Augmentation Of Sekmai Town - stacking of DI 150mm

Progress Update : 26/04/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.85177397,93.82089784
13.150589941277
75984
Laying of 800mm.. phayeng

Progress Update : 26/04/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8515517,93.8206889
13.160931894293
75984
Laying of 800mm.. phayeng

Progress Update : 26/04/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.7996313,93.8860546
5.6873360461368
60786.7
Laying of 800mm. Lamdeng khunou bridge

Progress Update : 26/04/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.7996313,93.8860546
5.6873360461368
75984
Laying of 800mm. Lamdeng khunou bridge

Progress Update : 20/04/2022
Work in progress
Lilong intake
pahten123
24.80748517734833,93.94173431396518
24.7192959,93.9414635
9.8057665626298
60786.7
7th lift (1.2m) complete ,8th lift reinforcement work in progress

Progress Update : 18/04/2022
Ongoing
First stage
Zarzolien
24.80748517734833,93.94173431396518
24.2622619,93.2839854
90.008490104976
60786.7
Service Reservoir work in progress

Progress Update : 18/04/2022
Ongoing
First stage
Zarzolien
24.80748517734833,93.94173431396518
24.2645489,93.2811552
90.049176414924
75984
Slow sand filter work in progress

Progress Update : 18/04/2022
Ongoing
First stage
Zarzolien
24.80748517734833,93.94173431396518
24.2652451,93.2811139
90.00026371527
60786.7
Settling tank, completed.

Progress Update : 16/04/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3428367,93.687635
57.700497565984
75984
3rd lift casting work for wall of 2ML GLSR at Head quarter, Churachandpur Manipur

Progress Update : 15/04/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86305257,93.81094432
14.572240281717
75984
Laying of 800mm. Abulok brigde

Progress Update : 15/04/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86339536,93.81080724
14.600939588077
75984
Laying of 800mm. Abulok brigde

Progress Update : 15/04/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86305185,93.81090169
14.57610235449
75984
Laying of 800mm. Abulok brigde

Progress Update : 06/04/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8589261,93.8122689
14.261369230889
75984
Laying of 800mm dia.. phayeng

Progress Update : 05/04/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86288664,93.81095903
14.563090342371
75984
Laying of 800mm pipe. Abulok

Progress Update : 05/04/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.354345,93.70179
55.921452850017
75984
1MLD GLSR at Bijang Churachandpur Manipur

Progress Update : 05/04/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3545085,93.7018532
55.902294156334
75984
1MLD GLSR at Bijang Churachandpur Manipur

Progress Update : 05/04/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.354185,93.70178
55.937927474512
75984
1MLD GLSR at Bijang Churachandpur Manipur

Progress Update : 05/04/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3540033,93.7017317
55.958257327885
75984
Materials

Progress Update : 05/04/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3540633,93.7016083
55.95765621597
75984
Materials

Progress Update : 05/04/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3541455,93.7016541
55.947408815795
75984
OHT pile work at Bijang Churachandpur Manipur

Progress Update : 05/04/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3541679,93.7016691
55.944505814764
75984
OHT pile work at Bijang Churachandpur Manipur

Progress Update : 03/04/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3576094,93.6913551
56.062980123018
75984
2MLD at Soialbuhjang

Progress Update : 03/04/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3641376,93.6951311
55.242636963136
75984
2MLD at Soialbuhjang

Progress Update : 03/04/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3544631,93.7014152
55.926072301705
75984
Admin. Building

Progress Update : 03/04/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3546492,93.7021573
55.874855970159
75984
OHT .60MLD at Bijang

Progress Update : 03/04/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3541683,93.7017433
55.94121086826
75984
1MLD at Bijang

Progress Update : 03/04/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3428283,93.6879767
57.68595700106
60786.7
2MLD at Head quarter veng

Progress Update : 31/03/2022
On going
Package-VI (W)
dinath
24.80748517734833,93.94173431396518
24.7259924,93.9257876
9.2030730976586
60786.7
Drinking water supply other town (13 nos), package-VI (W), 1.764 MLD WTP at Lilong Chajing , Clear water reservoir (capacity- 0.7 ML).

Progress Update : 31/03/2022
On going
Package-VI (W)
dinath
24.80748517734833,93.94173431396518
24.7267496,93.9289258
9.0696205384539
75984
Drinking water supply other town (13 nos), package-VI (W), 1.764 MLD WTP at Lilong Chajing town A, Slow sand filter.

Progress Update : 31/03/2022
On going
Package-VI (W)
dinath
24.80748517734833,93.94173431396518
24.7272914,93.9331802
8.9584390142628
75984
Drinking water supply other town (13 nos), package-VI (W), 1.764 MLD WTP at Lilong Chajing town A, Slow sand filter.

Progress Update : 30/03/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81099937,93.88781572
5.4558988591704
75984
C/O chawkidar qtr at iroisemba.brick wall

Progress Update : 28/03/2022
On going
NDB pakage 7
eetblphed
24.80748517734833,93.94173431396518
24.7021535,93.9234827
11.855892840142
0
Pile work of OHT at Haoreibi Mayai Leikai

Progress Update : 28/03/2022
On going
NDB Pakage 7
eetblphed
24.80748517734833,93.94173431396518
24.7052815,93.9248983
11.490428309559
0
Pile work of OHT at Awang Leikai

Progress Update : 28/03/2022
On going
NDB Pakage 7
eetblphed
24.80748517734833,93.94173431396518
24.7052815,93.9248983
11.490428309559
0
Pile work of OHT at Awang Leikai

Progress Update : 27/03/2022
Ongoing
Package VII Other Town
romen123
24.80748517734833,93.94173431396518
24.59607,94.041594
25.580092289706
0
Augmentation of WTP at Wangjing WSS (SH: Demolition of old units)

Progress Update : 27/03/2022
Ongoing
Package VII Other Town
romen123
24.80748517734833,93.94173431396518
24.5965963,94.037508
25.36604477344
0
Augmentation of WTP at Wangjing WSS (SH: Demolition of old units)

Progress Update : 27/03/2022
Ongoing
Package VII Other Town
romen123
24.80748517734833,93.94173431396518
24.6774909,94.0451418
17.831437016023
0
Augmentation of WTP at Yairipok (U) WSS (Sh:- Construction of Step type Intake)

Progress Update : 27/03/2022
Ongoing
Package VII Other Town
romen123
24.80748517734833,93.94173431396518
24.6772482,94.0449419
17.841524971648
0
Augmentation of WTP at Yairipok (U) WSS (Sh:- Construction of Step type Intake)

Progress Update : 26/03/2022
Ongoing
Package xi
ranbir
24.80748517734833,93.94173431396518
24.26520835,93.28134407
89.985725106308
0
Service Reservoir Ongoing Work at Thanlon (NDB)

Progress Update : 26/03/2022
Ongoing
Package xi
ranbir
24.80748517734833,93.94173431396518
24.26521917,93.28119444
89.996152229569
75984
Slow sand filter Ongoing Work at Thanlon (NDB)

Progress Update : 26/03/2022
Ongoing
Package xi
ranbir
24.80748517734833,93.94173431396518
24.2618841,93.2842999
90.013358230803
0
Water supply scheme Ongoing Work at Thanlon (NDB)

Progress Update : 26/03/2022
Ongoing
Package xi
ranbir
24.80748517734833,93.94173431396518
24.26524685,93.28114078
89.998114423078
75984
Settling Tank Ongoing Work at Thanlon (NDB)

Progress Update : 26/03/2022
In progress
Package xi
lalrindik
24.80748517734833,93.94173431396518
24.35779,93.691165
56.053740823024
0
2MLD GLSR at Sialbuhjang, Churachandpur Manipur

Progress Update : 26/03/2022
In progress
Package xi
lalrindik
24.80748517734833,93.94173431396518
24.3596782,93.7040162
55.289319082666
75984
2MLD GLSR at Sialbuhjang, Churachandpur Manipur

Progress Update : 26/03/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3546143,93.701463
55.908824014134
75984
OHT- pipe work reinforcement at Bijang Churachandpur Manipur

Progress Update : 26/03/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3546114,93.7014623
55.9091453076
75984
OHT- pipe work at Bijang Churachandpur Manipur

Progress Update : 26/03/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3561728,93.7024244
55.710445786496
75984
OHT- pipe work at Bijang Churachandpur Manipur

Progress Update : 26/03/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3542052,93.7017922
55.935367822189
75984
1MLD at Bijang Churachandpur Manipur

Progress Update : 26/03/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3542733,93.7017733
55.929371394644
75984
1MLD at Bijang Churachandpur Manipur

Progress Update : 26/03/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3546492,93.7014372
55.906461267395
75984
1MLD at Bijang Churachandpur Manipur

Progress Update : 26/03/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.35464,93.701458
55.90646896238
0
Admin. building at Churachandpur

Progress Update : 25/03/2022
Ongoing
1
HARIDEVA
24.80748517734833,93.94173431396518
24.8006647,93.919359
2.3823161746508
75984
Construction of OHT at Nepra menjor (Tera Boys) (Top dome)

Progress Update : 25/03/2022
Ongoing
1
HARIDEVA
24.80748517734833,93.94173431396518
24.799863,93.9173761
2.6005100208454
75984
Construction of OHT at Nepra menjor (Tera Boys) (Top dome)

Progress Update : 25/03/2022
Ongoing
1
HARIDEVA
24.80748517734833,93.94173431396518
24.8001856,93.9170828
2.6171667466134
75984
Construction of ESR 0.2ML (Tank wall and slab)

Progress Update : 25/03/2022
Ongoing
1
HARIDEVA
24.80748517734833,93.94173431396518
24.8002778,93.9182658
2.5006195084534
60786.7
Construction of ESR 0.2ML (Tank wall and slab)

Progress Update : 25/03/2022
Ongoing
1
HARIDEVA
24.80748517734833,93.94173431396518
24.8002126,93.9180323
2.5252681462194
75984
Construction of OHT at Nepra menjor Tera Boys (conical shell wall)

Progress Update : 25/03/2022
Ongoing
1
HARIDEVA
24.80748517734833,93.94173431396518
24.8002126,93.9180323
2.5252681462194
75984
Construction of OHT at Nepra menjor Tera Boys (conical shell wall)

Progress Update : 25/03/2022
Ongoing
1
HARIDEVA
24.80748517734833,93.94173431396518
24.8001718,93.9179828
2.53145570565
75984
Construction of OHT at Nepra menjor (Tera Boys) (SH: dome portion)

Progress Update : 25/03/2022
Ongoing
Package 1 balance work
herojit
24.80748517734833,93.94173431396518
24.80756233,93.96667938
2.5177018801082
75984
Porompat OHT

Progress Update : 25/03/2022
Ongoing
Package 1 balance work
herojit
24.80748517734833,93.94173431396518
24.8113844,93.9588043
1.77654927543
60786.7
Porompat OHT

Progress Update : 25/03/2022
Ongoing
Package 1 balance work
herojit
24.80748517734833,93.94173431396518
24.80763692,93.96688608
2.5386046504962
60786.7
Porompat OHT

Progress Update : 25/03/2022
Ongoing
Package 1 balance work
herojit
24.80748517734833,93.94173431396518
24.8099129,93.9683259
2.6973846935603
60785.7
Chinga SR

Progress Update : 25/03/2022
Ongoing
Package 1 balance work
herojit
24.80748517734833,93.94173431396518
24.80777382,93.96707472
2.5577878235759
75984
Chinga SR

Progress Update : 21/03/2022
Work in progress
Lilong intake
pahten123
24.80748517734833,93.94173431396518
24.7402161,93.9353235
7.5075698835435
60785.7
3rd lift , 1.2m complete , 4th lift work in progress

Progress Update : 17/03/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3578242,93.6909515
56.060108160429
75984
GLSR 2MLD at Sialbuhjang, Churachandpur Manipur

Progress Update : 14/03/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3541908,93.701399
55.954066372188
60786.7
Administrative Building at Bijang, Churachandpur Manipur

Progress Update : 14/03/2022
In progress
Package ix
lalrindik
24.80748517734833,93.94173431396518
24.3543283,93.7013404
55.942863760587
75984
GLSR 1MLD at Bijang, Churachandpur Manipur

Progress Update : 14/03/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3541117,93.7018267
55.943226631851
0
Boring for pile foundation... OHT at Bijang, Churachandpur Manipur

Progress Update : 14/03/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.354587,93.7018549
55.89435240174
75984
Boring for pile foundation... OHT at Bijang, Churachandpur Manipur

Progress Update : 10/03/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.84758647,93.82763186
12.347594682449
75984
Laying of 800mm pipe . Phayeng

Progress Update : 10/03/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.858948,93.8132352
14.173083038105
60785.7
Laying of 800mm pipe . Abulok

Progress Update : 09/03/2022
Work in progress
Lilong intake
pahten123
24.80748517734833,93.94173431396518
24.720922,93.9407903
9.6253949764574
75984
Second lift work in progress

Progress Update : 09/03/2022
Work in progress
Lilong intake
pahten123
24.80748517734833,93.94173431396518
24.720922,93.9407903
9.6253949764574
75984
Second lift work in progress

Progress Update : 08/03/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8421458,93.8313412
11.788118597976
75984
Laying of 800mm. Lairenkabi

Progress Update : 08/03/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.7903773,93.8571001
8.7518850306365
75984
Laying of 800mm. Lairenkabi

Progress Update : 08/03/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.84408256,93.83344451
11.661044064822
75984
Laying of 800mm. Lairenkabi

Progress Update : 08/03/2022
Work in progress
Canchipur lab building
pahten123
24.80748517734833,93.94173431396518
24.7488606,93.9277669
6.6692082657795
75984
Plastering work complete

Progress Update : 07/03/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3425846,93.6878478
57.716034368293
75984
Raft casting work of 2MLD GLSR at Head quarter veng, Churachandpur Manipur

Progress Update : 07/03/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3425097,93.6877488
57.72794964233
75984
Raft casting work of 2MLD GLSR at Head quarter veng, Churachandpur Manipur

Progress Update : 05/03/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86372768,93.81072915
14.623816749771
75984
Laying of 800mm pipe . Abulok

Progress Update : 05/03/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3428383,93.6878217
57.691934102311
75984
GLSR 2ml raft reinforcement work at Head quarter veng, Churachandpur,Manipur

Progress Update : 05/03/2022
In progress
Package XI
lalrindik
24.80748517734833,93.94173431396518
24.3424952,93.6877156
57.730887777946
75984
GLSR 2ml raft reinforcement work at Head quarter veng, Churachandpur,Manipur

Progress Update : 04/03/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.842854,93.8326129
11.693130380676
75984
Laying of 800mm pipe . Lairenkabi maning

Progress Update : 04/03/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.842854,93.8326129
11.693130380676
75984
Laying of 800mm pipe . Lairenkabi maning

Progress Update : 02/03/2022
Ongoing
3
ulen
24.80748517734833,93.94173431396518
24.8588938,93.8135402
14.142497025396
75984
Laying of 800mm pipes. Abulok bridge

Progress Update : 02/03/2022
Ongoing
3
ulen
24.80748517734833,93.94173431396518
24.86321789,93.81107434
14.568160775073
75984
Laying of 800mm pipes. Abulok bridge

Progress Update : 23/02/2022
Ongoing
3
ulen
24.80748517734833,93.94173431396518
24.8642074,93.8084553
14.854095255903
75984
C/O laboratory building at kangchup

Progress Update : 23/02/2022
Ongoing
3
ulen
24.80748517734833,93.94173431396518
24.86704259,93.8069801
15.124210107948
75984
C/O laboratory building at kangchup

Progress Update : 23/02/2022
Ongoing
3
ulen
24.80748517734833,93.94173431396518
24.86737105,93.80707035
15.132042308888
75984
C/O laboratory building at kangchup

Progress Update : 23/02/2022
Ongoing
3
ulen
24.80748517734833,93.94173431396518
24.8642074,93.8084553
14.854095255903
75984
C/O laboratory building at kangchup

Progress Update : 23/02/2022
Ongoing
3
ulen
24.80748517734833,93.94173431396518
24.8642074,93.8084553
14.854095255903
75984
C/O laboratory building at kangchup

Progress Update : 23/02/2022
Ongoing
3
ulen
24.80748517734833,93.94173431396518
24.8642074,93.8084553
14.854095255903
75984
C/O laboratory building at kangchup

Progress Update : 19/02/2022
Ongoing
package VI
bushndb
24.80748517734833,93.94173431396518
24.819407,93.8660074
7.756802292231
54352.7
DRINKING WATER SUPPLY-OTHER TOWN- PACKAGE VI 1.00 MLD WTP AT TAOTHONG LAMSANG

Progress Update : 19/02/2022
Ongoing
Phase vi
bushndb
24.80748517734833,93.94173431396518
24.819407,93.8660074
7.756802292231
54352.7
DRINKING WATER SUPPLY-OTHER TOWN- PACKAGE VI 1.00 MLD WTP AT TAOTHONG LAMSANG

Progress Update : 19/02/2022
Ongoing
Phase vi
bushndb
24.80748517734833,93.94173431396518
24.819407,93.8660074
7.756802292231
54352.7
DRINKING WATER SUPPLY-OTHER TOWN- PACKAGE VI 1.00 MLD WTP AT TAOTHONG LAMSANG

Progress Update : 19/02/2022
Ongoing
Phase 1
bushndb
24.80748517734833,93.94173431396518
24.819407,93.8660074
7.756802292231
75984
DRINKING WATER SUPPLY-OTHER TOWN- PACKAGE VI 1.00 MLD WTP AT TAOTHONG LAMSANG

Progress Update : 19/02/2022
Ongoing
Phase 1
bushndb
24.80748517734833,93.94173431396518
24.8201886,93.8644167
7.9300220645797
75984
DRINKING WATER SUPPLY-OTHER TOWN- PACKAGE VI 1.00 MLD WTP AT TAOTHONG LAMSANG

Progress Update : 19/02/2022
Ongoing
Phase VI
bushndb
24.80748517734833,93.94173431396518
24.819407,93.8660074
7.756802292231
54352.7
DRINKING WATER SUPPLY-OTHER TOWN- PACKAGE VI 1.00 MLD WTP AT TAOTHONG LAMSANG

Progress Update : 19/02/2022
Ongoing
Phase 1
bushndb
24.80748517734833,93.94173431396518
24.819407,93.8660074
7.756802292231
75984
DRINKING WATER SUPPLY-OTHER TOWN- PACKAGE VI 1.00 MLD WTP AT TAOTHONG LAMSANG

Progress Update : 19/02/2022
Ongoing
Phase 1
bushndb
24.80748517734833,93.94173431396518
24.8201886,93.8644167
7.9300220645797
75984
DRINKING WATER SUPPLY-OTHER TOWN- PACKAGE VI 1.00 MLD WTP AT TAOTHONG LAMSANG

Progress Update : 19/02/2022
Ongoing
Phase 1
bushndb
24.80748517734833,93.94173431396518
24.8201886,93.8644167
7.9300220645797
75984
DRINKING WATER SUPPLY-OTHER TOWN- PACKAGE VI 1.00 MLD WTP AT TAOTHONG LAMSANG

Progress Update : 19/02/2022
Ongoing
Phase 1
bushndb
24.80748517734833,93.94173431396518
24.8201886,93.8644167
7.9300220645797
75984
DRINKING WATER SUPPLY-OTHER TOWN- PACKAGE VI 1.00 MLD WTP AT TAOTHONG LAMSANG

Progress Update : 17/02/2022
Ongoing
package III
khleena
24.80748517734833,93.94173431396518
24.7911448,93.9316061
2.0847423782053
54352.7
Irom pukhri Reservoir 4th lift

Progress Update : 17/02/2022
Ongoing
I
khleena
24.80748517734833,93.94173431396518
24.7901241,93.9313158
2.1982285501779
75984
Irom pukhri Reservoir 4th lift

Progress Update : 17/02/2022
Ongoing
I
khleena
24.80748517734833,93.94173431396518
24.7901241,93.9313158
2.1982285501779
75984
Irom pukhri Reservoir 4th lift

Progress Update : 17/02/2022
Ongoing
I
khleena
24.80748517734833,93.94173431396518
24.7911434,93.9316029
2.0850364457262
75984
Irom pukhri reservoir 4th lift

Progress Update : 17/02/2022
Ongoing
I
khleena
24.80748517734833,93.94173431396518
24.7911434,93.9316029
2.0850364457262
75984
Irom pukhri reservoir 4th lift

Progress Update : 17/02/2022
Ongoing
I
khleena
24.80748517734833,93.94173431396518
24.7909549,93.9313738
2.1146666865572
75984
Irom pukhri reservoir 4th lift

Progress Update : 16/02/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81092396,93.88811504
5.4251713836713
54352.7
C/O of chawkidar qtr at iroisemba.

Progress Update : 16/02/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81107323,93.88871021
5.3664583031868
54352.7
C/O SR at iroisemba. Outlet chamber

Progress Update : 16/02/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81087254,93.88881779
5.3540188779466
75984
C/O SR at iroisemba. Outlet chamber

Progress Update : 12/02/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8319636,93.8529651
9.3628601169593
75984
Laying of 800mm pipe. Heibongpokpi

Progress Update : 08/02/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81098728,93.8880814
5.4290572177299
75984
C/O of chawkidar qtr at iroisemba

Progress Update : 08/02/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81096318,93.88813151
5.4238215664512
75984
C/O of chawkidar qtr at iroisemba

Progress Update : 08/02/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81071483,93.88831525
5.4034244190082
75984
C/O 2.5 ML service reservoir at Iroisemba. Chamber

Progress Update : 08/02/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.7863533,93.9124778
3.7738013013761
75984
C/O 2.5 ML service reservoir at Iroisemba. Chamber

Progress Update : 08/02/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8412508,93.8373823
11.179977639504
75984
Laying of 400mm pipe. Abulok

Progress Update : 08/02/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86961709,93.79902242
15.971599087981
75984
Laying of 400mm pipe. Abulok

Progress Update : 08/02/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8670932,93.80698119
15.12657351322
75984
C/O laboratory building at kangchup

Progress Update : 08/02/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8630912,93.81084097
14.583504497035
75984
Laying of 800mm pipe. Abulok truss

Progress Update : 08/02/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8630241,93.81071753
14.591630716592
54352.7
Laying of 800mm pipe. Abulok truss

Progress Update : 04/02/2022
Ongoing
Pkg-1 balance work
herojit
24.80748517734833,93.94173431396518
24.80753962,93.96670801
2.5205843740616
75984
.8 OHT porompat

Progress Update : 04/02/2022
Ongoing
Pkg-1 balance work
herojit
24.80748517734833,93.94173431396518
24.80752896,93.96669138
2.5189034621869
54352.7
.8 OHT porompat

Progress Update : 04/02/2022
Ongoing
Pkg-1 balance work
herojit
24.80748517734833,93.94173431396518
24.80743783,93.96677407
2.5272510118913
54352.7
.45 OHT 3rd lift wall shuttering porompat

Progress Update : 04/02/2022
Ongoing
Pkg-1 balance work
herojit
24.80748517734833,93.94173431396518
24.80714161,93.96693392
2.5436689914849
75984
.45 OHT 3rd lift wall shuttering porompat

Progress Update : 04/02/2022
Ongoing
Pkg-1 balance work
herojit
24.80748517734833,93.94173431396518
24.80804369,93.96693816
2.5445587100681
75984
Wall Shuttering for Chinga SR

Progress Update : 04/02/2022
Ongoing
Pkg-1 balance work
herojit
24.80748517734833,93.94173431396518
24.80769013,93.96704104
2.5542896875615
54352.7
Wall Shuttering for Chinga SR

Progress Update : 04/02/2022
Ongoing
Pkg-1 balance work
herojit
24.80748517734833,93.94173431396518
24.80776963,93.96709359
2.5596864485583
75984
Wall Shuttering for Chinga SR

Progress Update : 28/01/2022
Ongoing
I
khleena
24.80748517734833,93.94173431396518
24.7914015,93.9309324
2.0944939807804
75984
Irom pukhri reservoir lift and column casting

Progress Update : 28/01/2022
Ongoing
III
khleena
24.80748517734833,93.94173431396518
24.7913729,93.9312391
2.0812839157106
54352.7
Irom pukhri reservoir lift wall

Progress Update : 28/01/2022
Ongoing
I
khleena
24.80748517734833,93.94173431396518
24.7913729,93.9312391
2.0812839157106
60786.7
Irom pukhri reservoir lift wall

Progress Update : 22/01/2022
Augmentation of Lamjaotongba wss
Package 6
damudarndb
24.80748517734833,93.94173431396518
24.7982877,93.9092936
3.4303269983186
75984
Boring of pile

Progress Update : 22/01/2022
Augmentation of Lamjaotongba wss
Package 6
damudarndb
24.80748517734833,93.94173431396518
24.7989698,93.9120936
3.1379697997484
54352.7
Boring of pile

Progress Update : 22/01/2022
Augmentation of Lamjaotongba wss
Package 6
damudarndb
24.80748517734833,93.94173431396518
24.7989698,93.9120936
3.1379697997484
54352.7
Boring of pile

Progress Update : 17/01/2022
Ongoing
1
khleena
24.80748517734833,93.94173431396518
24.7912518,93.9311713
2.0963580038243
75984
Irom pukhri gsr chamber wall casting

Progress Update : 17/01/2022
Ongoing
1
khleena
24.80748517734833,93.94173431396518
24.7912518,93.9311713
2.0963580038243
75984
Irom pukhri GSR chamber wall casting

Progress Update : 17/01/2022
Ongoing
1
khleena
24.80748517734833,93.94173431396518
24.7912518,93.9311713
2.0963580038243
75984
Irom pukhri GSR chamber wall casting

Progress Update : 17/01/2022
ONGOING
III
kimaimol
24.80748517734833,93.94173431396518
24.8152943,93.9438666
0.89456430553922
75984
C/O O.6 MLD OHT AT NORTH AOC

Progress Update : 17/01/2022
Ongoing
I
khleena
24.80748517734833,93.94173431396518
24.7893977,93.929933
2.3374349520291
54352.7
Irom pukhri GSR wall casting

Progress Update : 17/01/2022
Ongoing
I
khleena
24.80748517734833,93.94173431396518
24.7893977,93.929933
2.3374349520291
75984
Irom pukhri GSR wall casting

Progress Update : 15/01/2022
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.775626,93.9261723
3.8750837748684
75984
Chingtham leikai zone, pcc for new pump house

Progress Update : 15/01/2022
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7772364,93.925468
3.7427406784771
75984
Chingtham leikai zone, pcc for new pump house

Progress Update : 13/01/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81009073,93.88513183
5.7201302632244
75984
Laying of 800 mm pipem lamdeng khunou bridge

Progress Update : 13/01/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81010063,93.88525046
5.7082282922978
54352.7
Laying of 800 mm pipem lamdeng khunou bridge

Progress Update : 12/01/2022
Active
3
ben
24.80748517734833,93.94173431396518
24.8220911,93.98585
4.7392470743648
54352.7
Construction of (1000 mm dia)pipe crossing bridge over Iril bridge

Progress Update : 12/01/2022
Active
3
ben
24.80748517734833,93.94173431396518
24.8234212,93.964074
2.8675508214403
54352.7
Construction of (1000 mm dia)pipe crossing bridge over kongba bridge

Progress Update : 12/01/2022
Active
3
ben
24.80748517734833,93.94173431396518
24.7943786,93.9428266
1.4614791645484
75984
Construction of 5.45 ML CAPACITY Intake well AT NINGTHEMPUKHRI

Progress Update : 12/01/2022
Active
3
ben
24.80748517734833,93.94173431396518
24.7921228,93.9450467
1.7405490475412
54352.7
Construction of 0.45 ML CAPACITY OHT AT NEW THUMBUTHONG

Progress Update : 12/01/2022
Active
3
ben
24.80748517734833,93.94173431396518
24.7952459,93.9384081
1.4016806121897
54352.7
Construction of 0.6 ML CAPACITY OHT AT OLD THUMBUTHONG

Progress Update : 11/01/2022
Ongoing
Pk 1 balance work
herojit
24.80748517734833,93.94173431396518
24.80797924,93.96706231
2.5569220067088
75984
Chinga reservoir raft r/f work

Progress Update : 11/01/2022
Ongoing
Pk 1 balance work
herojit
24.80748517734833,93.94173431396518
24.80819969,93.96740957
2.5925956919175
54352.7
Chinga reservoir raft r/f work

Progress Update : 11/01/2022
Ongoing
1
khleena
24.80748517734833,93.94173431396518
24.7908697,93.9309411
2.1447571941074
75984
Construction of ESR Irom Pukhri

Progress Update : 11/01/2022
Ongoing
1
khleena
24.80748517734833,93.94173431396518
24.7912971,93.9312206
2.0894909959656
75984
Construction of ESR Irom Pukhri

Progress Update : 07/01/2022
active
III
Naresh55
24.80748517734833,93.94173431396518
24.7992753,93.9515774
1.3491923392194
75984
Construction of 5.45 MLD Capacity WSS at ningthempukhri (aerator, flash mixer, parcel flume)

Progress Update : 07/01/2022
active
III
Naresh55
24.80748517734833,93.94173431396518
24.7992753,93.9515774
1.3491923392194
54352.7
Construction of 5.45 MLD Capacity WSS at ningthempukhri (clariflocculator)

Progress Update : 07/01/2022
active
III
Naresh55
24.80748517734833,93.94173431396518
24.7990191,93.9516112
1.3711062076541
75984
Construction of 5.45 MLD Capacity WSS at ningthempukhri (clariflocculator)

Progress Update : 07/01/2022
active
III
Naresh55
24.80748517734833,93.94173431396518
24.7990191,93.9516112
1.3711062076541
75984
Construction of WSS at ningthempukhri (filter house)

Progress Update : 07/01/2022
active
III
Naresh55
24.80748517734833,93.94173431396518
24.7990191,93.9516112
1.3711062076541
75984
Construction of 0.45 ML capacity OHT at ningthempukhri

Progress Update : 07/01/2022
active
III
Naresh55
24.80748517734833,93.94173431396518
24.7758715,93.9475651
3.5640462147231
75984
Construction of 0.45 ML capacity OHT at kongba irong (Akampat)

Progress Update : 07/01/2022
active
III
Naresh55
24.80748517734833,93.94173431396518
24.7758715,93.9475651
3.5640462147231
75984
Construction of 0.45 ML capacity OHT at kongba irong (Akampat)

Progress Update : 07/01/2022
active
III
Naresh55
24.80748517734833,93.94173431396518
24.7916721,93.9663162
3.0410110956436
75984
construction of 0.8 ML capacity OHT at Thambalkhong (Rahmania shift II B)

Progress Update : 07/01/2022
active
III
Naresh55
24.80748517734833,93.94173431396518
24.7916721,93.9663162
3.0410110956436
75984
construction of 0.45 ML capacity ESR at Thambalkhong (Rahmania shift II B)

Progress Update : 07/01/2022
active
III
Naresh55
24.80748517734833,93.94173431396518
24.7915563,93.9662994
3.0470946226594
75984
construction of 0.45 ML capacity ESR at Thambalkhong (Rahmania shift II B)

Progress Update : 07/01/2022
active
PACKAGE I (B)
Naresh55
24.80748517734833,93.94173431396518
24.7915563,93.9662994
3.0470946226594
54352.7
construction of 0.8 ML capacity OHT at Thambalkhong (Rahmania shift II B)

Progress Update : 03/01/2022
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86724832,93.80898538
14.952698746873
75984
800 mm pipe laying at Abulok

Progress Update : 30/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.83027519,93.85434288
9.1763604045818
75984
800mm Pipe laying at lamsang

Progress Update : 30/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.853934,93.8192613
13.394522367008
75984
800mm Pipe laying at abulok

Progress Update : 30/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86697282,93.80924068
14.916029944085
75984
800mm Pipe laying at abulok

Progress Update : 30/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86696694,93.80918064
14.921170773043
75984
800mm Pipe laying at abulok

Progress Update : 29/12/2021
Ongoing
Package 1 ( balance work)
HARIDEVA
24.80748517734833,93.94173431396518
24.7999494,93.9172584
2.6086416764371
75984
Construction of 0.8ML OHT at Nepra Menjor ( Tera Boys) (Casting of conical shell)

Progress Update : 29/12/2021
Ongoing
Package 1 (balance work)
HARIDEVA
24.80748517734833,93.94173431396518
24.7999704,93.9172851
2.6053397312972
75984
Construction of 0.2ML ESR at Nepra Menjor(Tera Boys) ( Casting of RCC raft foundation)

Progress Update : 29/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86158391,93.81077044
14.519795300587
75984
800 mm pipe laying at abulok

Progress Update : 29/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86197315,93.81084544
14.530880251338
75984
800 mm pipe laying at abulok

Progress Update : 29/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86666941,93.80917896
14.90670323552
75984
800 mm pipe laying at abulok

Progress Update : 29/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86684814,93.80926777
14.907442642646
75984
800 mm pipe laying at abulok

Progress Update : 29/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.853934,93.8192613
13.394522367008
75984
800 mm pipe laying at abulok

Progress Update : 29/12/2021
Ongoing
III
kimaimol
24.80748517734833,93.94173431396518
24.8147645,93.9440436
0.84227332867571
75984
C/O OHT at north AOC

Progress Update : 29/12/2021
Ongoing
Package II
mrajimp
24.80748517734833,93.94173431396518
24.82772,93.9705478
3.6766650807696
75984
Construction of 0.2 ML ESR at Sajor Leikai

Progress Update : 29/12/2021
Ongoing
Package II
mrajimp
24.80748517734833,93.94173431396518
24.8276149,93.9707146
3.6828805464404
75984
Construction of 0.2 ML ESR at Sajor Leikai

Progress Update : 29/12/2021
Ongoing
Package II
mrajimp
24.80748517734833,93.94173431396518
24.8276215,93.9707789
3.68848135691
60786.7
Construction of 0.2 ML ESR at Sajor Leikai

Progress Update : 29/12/2021
Work in progress
II
pahten123
24.80748517734833,93.94173431396518
24.7501133,93.9274833
6.5393736998079
75984
Lab building canchipur

Progress Update : 29/12/2021
Ongoing
Package II
mrajimp
24.80748517734833,93.94173431396518
24.8275788,93.9708417
3.690644305551
75984
Construction of 0.2 ML ESR at Sajor Leikai

Progress Update : 29/12/2021
Ongoing
Package II
mrajimp
24.80748517734833,93.94173431396518
24.8275788,93.9708417
3.690644305551
75984
Construction of 0.2 ML ESR at Sajor Leikai

Progress Update : 29/12/2021
Ongoing
Package II
mrajimp
24.80748517734833,93.94173431396518
24.8276471,93.9708089
3.6926150093379
75984
Construction of 0.6 ML OHT at Sajor Leikai

Progress Update : 29/12/2021
Ongoing
Package II
mrajimp
24.80748517734833,93.94173431396518
24.8275987,93.9706023
3.6727897187348
75984
Construction of 0.6 ML OHT at Sajor Leikai

Progress Update : 29/12/2021
Ongoing
Package II
mrajimp
24.80748517734833,93.94173431396518
24.8152553,93.9648392
2.4867885912163
75984
Construction of 0.6 ML OHT at Sajor Leikai

Progress Update : 29/12/2021
Ongoing
Package II
mrajimp
24.80748517734833,93.94173431396518
24.8147687,93.9645372
2.4397450184915
75984
Construction of 0.6 ML OHT at Sajor Leikai

Progress Update : 29/12/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8152736,93.9648404
2.4876096124435
75984
0.8 ML OHT Laiwangma T.V tower shift II

Progress Update : 29/12/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8152719,93.9648387
2.4873829846124
75984
0.8 ML OHT Laiwangma T.V tower shift II

Progress Update : 29/12/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8155154,93.9645906
2.4735660475533
75984
0.8 ML OHT Laiwangma T.V tower shift II

Progress Update : 29/12/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8150896,93.9646844
2.465767442758
75984
0.8 ML OHT Laiwangma T.V tower shift II

Progress Update : 29/12/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8301285,93.9645663
3.4129437639244
54352.7
0.8 ML OHT Laiwangma T.V tower shift II

Progress Update : 28/12/2021
Ongoing
Pk-1 balance work
herojit
24.80748517734833,93.94173431396518
24.8094269,93.9680073
2.660467993951
45258.7
0.45 ML OHT Bottom dome and conical casting

Progress Update : 28/12/2021
Ongoing
Pk-1 balance work
herojit
24.80748517734833,93.94173431396518
24.80767439,93.96648912
2.4985719098981
75984
.45OHT dome and conical

Progress Update : 28/12/2021
Ongoing
Pk-1 balance work
herojit
24.80748517734833,93.94173431396518
24.80761902,93.96734224
2.5846314949787
45258.7
PCC for 2 ML Chinga Service reservoir

Progress Update : 27/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86180549,93.810854
14.522340152145
75984
800mm pipe laying at abulok

Progress Update : 27/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8633618,93.8125867
14.43706656858
75984
800mm pipe laying at abulok

Progress Update : 27/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8668571,93.8075031
15.067743720172
75984
800mm pipe laying at abulok

Progress Update : 27/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81309108,93.92878426
1.4480335774406
75984
C/O OHT at lalambung

Progress Update : 27/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8134535,93.928371
1.503138047201
75984
C/O OHT and ESR at lalambung.

Progress Update : 27/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8133832,93.92842146
1.4951254729954
75984
C/O OHT and ESR at lalambung.

Progress Update : 27/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8133291,93.9286574
1.4710961144783
75984
C/O OHT and ESR at lalambung.

Progress Update : 24/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8298752,93.8550542
9.0951263081401
75984
Laying of 800mm pipe. Lamsang

Progress Update : 23/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8668581,93.8075061
15.067520273058
75984
Laying of 800mm pipe. Abulok

Progress Update : 23/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86209202,93.81075308
14.544858550058
75984
Laying of 800mm pipe. Abulok

Progress Update : 23/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8619616,93.81085717
14.529269526098
75984
Laying of 800mm pipe. Abulok

Progress Update : 23/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8320723,93.8631442
8.3892008943488
75984
Laying of 800mm pipe.. lamsang

Progress Update : 23/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8320723,93.8631442
8.3892008943488
75984
Laying of 800mm pipe.. lamsang

Progress Update : 23/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8299566,93.8590087
8.7145521059764
75984
Laying of 800mm pipe.. lamsang

Progress Update : 23/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.82951629,93.8553123
9.0592162278081
75984
Laying of 800mm pipe.. lamsang

Progress Update : 23/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.82963179,93.8554284
9.0514178891346
75984
Laying of 800mm pipe.. lamsang

Progress Update : 22/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8291014,93.85566875
9.0121899988605
75984
800mm pipe laying. Lamsang

Progress Update : 22/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8284426,93.8602811
8.5442215080395
75984
800mm pipe laying. Lamsang

Progress Update : 22/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.82911011,93.85581408
8.9983137299079
75984
800mm pipe laying. Lamsang

Progress Update : 22/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8262205,93.8602811
8.4802411837862
75984
800mm pipe laying. Lamsang

Progress Update : 22/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86229852,93.81083678
14.546779032606
75984
800mm pipe laying. Abulok

Progress Update : 22/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8316259,93.8516928
9.4750946817891
75984
800mm pipe laying. Lamsang

Progress Update : 22/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.82930583,93.85588897
8.9968685007572
75984
800mm pipe laying. Lamsang

Progress Update : 21/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8299566,93.8590087
8.7145521059764
75984
Laying of 800mm pipe. Lamsang

Progress Update : 21/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8299566,93.8590087
8.7145521059764
75984
Laying of 800mm pipe. Lamsang

Progress Update : 21/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8299566,93.8590087
8.7145521059764
75984
Laying of 800mm pipe. Lamsang

Progress Update : 21/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8299566,93.8590087
8.7145521059764
75984
Laying of 800mm pipe. Lamsang

Progress Update : 21/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86224347,93.81088422
14.539871002411
75984
Laying of 800mm pipe. Abulok

Progress Update : 21/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86246052,93.81102813
14.536806393138
75984
Laying of 800mm pipe. Abulok

Progress Update : 21/12/2021
Ongoing
Iii
ulen
24.80748517734833,93.94173431396518
24.86531842,93.81014547
14.75323152371
75984
Laying of 800mm at abulok

Progress Update : 21/12/2021
Ongoing
Iii
ulen
24.80748517734833,93.94173431396518
24.8540105,93.8194181
13.383206581176
75984
Laying of 800mm at abulok

Progress Update : 21/12/2021
Ongoing
Iii
ulen
24.80748517734833,93.94173431396518
24.82881471,93.8565145
8.9214396442821
75984
Laying of 800mm at lamsang

Progress Update : 21/12/2021
Ongoing
Iii
ulen
24.80748517734833,93.94173431396518
24.82838819,93.85665534
8.8952434855139
75984
Laying of 800mm at lamsang

Progress Update : 19/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86448577,93.8104486
14.685555922029
75984
Laying of 800mm pipe. Abulok

Progress Update : 19/12/2021
active
III
Naresh55
24.80748517734833,93.94173431396518
24.7757687,93.9475531
3.5751208945699
75984
Construction of 0.45 ML capacity OHT at Akampat (kongba irong)

Progress Update : 18/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8550693,93.8183077
13.532162676248
75984
Laying of 800mm pipe . Abulok

Progress Update : 17/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8642653,93.8131885
14.425914326356
75984
Laying of 800mm pipe. Abulok

Progress Update : 17/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8550693,93.8183077
13.532162676248
75984
Laying of 800mm pipe. Abulok

Progress Update : 17/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8289273,93.8558278
8.9915746302045
75984
Laying of 800mm pipe. Lamsang/ heibongpokpi

Progress Update : 17/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8289273,93.8558278
8.9915746302045
75984
Laying of 800mm pipe. Lamsang/ heibongpokpi

Progress Update : 16/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86370123,93.81095478
14.601981319333
75984
Laying of 800 mm pipes. Abulok

Progress Update : 16/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8622913,93.8109977
14.531700253901
75984
Laying of 800 mm pipes. Abulok

Progress Update : 16/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.829314,93.8551916
9.0649027104722
75984
Laying of 800 mm pipes.

Progress Update : 16/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.829314,93.8551916
9.0649027104722
75984
Laying of 800 mm pipes.

Progress Update : 14/12/2021
ONGOING
III
kimaimol
24.80748517734833,93.94173431396518
24.8145795,93.9442282
0.82799821837003
75984
C/o OHT at North AOC

Progress Update : 14/12/2021
ONGOING
III
kimaimol
24.80748517734833,93.94173431396518
24.8145574,93.9443149
0.82836699136615
75984
C/o OHT at North AOC

Progress Update : 14/12/2021
ONGOING
III
kimaimol
24.80748517734833,93.94173431396518
24.8145574,93.9443149
0.82836699136615
75984
C/o OHT at North AOC

Progress Update : 14/12/2021
ONGOING
III
kimaimol
24.80748517734833,93.94173431396518
24.8149536,93.9447023
0.882785854608
75984
C/o OHT at North AOC

Progress Update : 14/12/2021
ONGOING
III
kimaimol
24.80748517734833,93.94173431396518
24.8149536,93.9447023
0.882785854608
75984
C/o OHT at North AOC

Progress Update : 14/12/2021
ONGOING
III
kimaimol
24.80748517734833,93.94173431396518
24.8146813,93.9445518
0.84916075007557
54352.7
C/o OHT at North AOC

Progress Update : 03/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8539906,93.8170363
13.604350252971
75984
Laying of 800 k9 transmission pipe . Phayeng

Progress Update : 03/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8539906,93.8170363
13.604350252971
75984
Laying of 800 k9 transmission pipe . Phayeng

Progress Update : 01/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81313463,93.92874978
1.45326166984
75984
C/O OHT at lalambung. Top dome curing

Progress Update : 01/12/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81317331,93.92889288
1.4421322217263
75984
C/O OHT at lalambung. Top dome curing

Progress Update : 29/11/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8131773,93.9286347
1.4657860353528
54352.7
C/O OHT at lalambung. Top ring beam and top dome casting

Progress Update : 29/11/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8136377,93.9286957
1.4831387265501
75984
C/O OHT at lalambung. Top ring beam and top dome casting

Progress Update : 29/11/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8134838,93.9282968
1.5113447521265
75984
C/O OHT at lalambung. Top ring beam and top dome casting

Progress Update : 26/11/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81294427,93.92861799
1.4563199705362
75984
C/O OHT at lalambung. Top dome shuttering

Progress Update : 26/11/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8109383,93.9270384
1.532117106358
75984
C/O OHT at lalambung. Top dome shuttering

Progress Update : 26/11/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8132401,93.92869615
1.4632342736654
75984
C/O OHT at lalambung. Top dome shuttering

Progress Update : 12/11/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.815335,93.9646042
2.4676818787214
75984
Casting of top dome of 0.8MLD OHT at TV Laiwangma Shift II

Progress Update : 12/11/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8153108,93.9647298
2.478597153027
75984
Casting of top dome of 0.8MLD OHT at TV Laiwangma Shift II

Progress Update : 12/11/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8153108,93.9647298
2.478597153027
75984
Casting of top dome of 0.8MLD OHT at TV Laiwangma Shift II

Progress Update : 12/11/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.815342,93.9642166
2.4314104612533
75984
Casting of top dome of 0.8MLD OHT at TV Laiwangma Shift II

Progress Update : 12/11/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8151958,93.9648978
2.4900502401073
75984
Casting of top dome of 0.8MLD OHT at TV Laiwangma Shift II

Progress Update : 12/11/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8151907,93.9648877
2.4888980153012
75984
Casting of top dome of 0.8MLD OHT at TV Laiwangma Shift II

Progress Update : 12/11/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8269939,93.8590087
8.6259740001046
75984
Laying od 800 transmission pipe. Taothong

Progress Update : 09/11/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8605042,93.8084553
14.684184121359
75984
Laying of DI k9 800.. kangchup bridge

Progress Update : 09/11/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86297946,93.81084712
14.577684592957
75984
Laying of DI k9 800.. kangchup bridge

Progress Update : 09/11/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8140093,93.9312689
1.2813536438332
75984
C/O OHT at lalambung. Wall 4th and final lift reinforcement

Progress Update : 09/11/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8130556,93.9279783
1.5202462690067
75984
C/O OHT at lalambung. Wall 4th and final lift reinforcement

Progress Update : 02/11/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8678379,93.8113155
14.772078197663
75984
C/O laboratory building at Kangchup. Slab reinforcement

Progress Update : 02/11/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86733539,93.80704983
15.132159292454
75984
C/O laboratory building at Kangchup. Slab reinforcement

Progress Update : 02/11/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.783368,93.8847815
6.3434361330687
75984
Laying of 800 transmission pipe . Piling at landeng khunou

Progress Update : 27/10/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8154411,93.9647105
2.4818991292353
75984
Casting of 5th lift tank wall of 0.8MLD OHT at TV Laiwangma Shift II

Progress Update : 27/10/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8151941,93.9647745
2.4783052522585
75984
Casting of 5th lift tank wall of 0.8MLD OHT at TV Laiwangma Shift II

Progress Update : 27/10/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8152984,93.9648558
2.4900272222618
75984
Casting of 5th lift tank wall of 0.8MLD OHT at TV Laiwangma Shift II

Progress Update : 27/10/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8152984,93.9648558
2.4900272222618
75984
Casting of 5th lift tank wall of 0.8MLD OHT at TV Laiwangma Shift II

Progress Update : 27/10/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8071081,93.9586695
1.7097732160902
75984
Casting of 5th lift tank wall of 0.8MLD OHT at TV Laiwangma Shift II

Progress Update : 26/10/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.777887,93.9255479
3.6742751168381
75984
Chingtham leikai zone pipeline lying at Lourembam Leikai

Progress Update : 25/10/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7786961,93.924637
3.6366394782174
75984
Chingtham leikai zone pipeline lying at Lourembam Leikai

Progress Update : 23/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.813272,93.9281755
1.5121713634418
75984
C/OHT at lalambung. Wall 1st lift casting

Progress Update : 23/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8123217,93.9291293
1.3811828236406
75984
C/OHT at lalambung. Wall 1st lift casting

Progress Update : 23/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8135526,93.9285015
1.4962667723026
75984
C/OHT at lalambung. Wall 1st lift casting

Progress Update : 23/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8134029,93.9284131
1.4968452580209
75984
C/OHT at lalambung. Wall 1st lift casting

Progress Update : 23/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8134029,93.9284131
1.4968452580209
75984
C/OHT at lalambung. Wall 1st lift casting

Progress Update : 23/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8134154,93.9289868
1.4456953112176
75984
C/OHT at lalambung. Wall 1st lift casting

Progress Update : 23/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8134154,93.9289868
1.4456953112176
75984
C/OHT at lalambung. Wall 1st lift casting

Progress Update : 23/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8134184,93.9283955
1.4991984609159
75984
C/O OHT at lalambung. Wall 1st lift

Progress Update : 22/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86341353,93.81083779
14.599009916176
75984
Laying of 800mm K9 transmission pipe from Kangchup to Iroisemba. Kangchup bridge

Progress Update : 22/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.861929,93.8106799
14.544023105991
75984
Laying of 800mm K9 transmission pipe from Kangchup to Iroisemba. Kangchup bridge

Progress Update : 22/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86299066,93.81080813
14.581775701873
75984
Laying of 800mm K9 transmission pipe from Kangchup to Iroisemba. Kangchup bridge

Progress Update : 22/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.861929,93.8106799
14.544023105991
75984
Laying of 800mm K9 transmission pipe from Kangchup to Iroisemba. Kangchup bridge

Progress Update : 22/10/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.773801666667,93.921756666667
4.2536605498744
75984
Chingtham leikai zone pipeline lying at Konjeng leikai pukhri achouba

Progress Update : 19/10/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.776653333333,93.925741666667
3.7892570227358
75984
Chingtham leikai zone 0.8ml capacity overhead tank casting for overhead tank

Progress Update : 18/10/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8153109,93.9648133
2.4864937686229
75984
Casting of 3rd lift tank wall of 0.8MLD OHT at TV Laiwangma Shift II

Progress Update : 18/10/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8153109,93.9648133
2.4864937686229
75984
Casting of 3rd lift tank wall of 0.8MLD OHT at TV Laiwangma Shift II

Progress Update : 18/10/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8151606,93.9647345
2.4732302510043
75984
Casting of 3rd lift tank wall of 0.8MLD OHT at TV Laiwangma Shift II

Progress Update : 18/10/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8152247,93.9647382
2.4760482393037
75984
Casting of 3rd lift tank wall of 0.8MLD OHT at TV Laiwangma Shift II

Progress Update : 16/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.82303312,93.86562285
7.8735296381509
75984
Laying of 800mm k9 transmission pipe. Lamsang

Progress Update : 16/10/2021
In progress
Phase III
pahten123
24.80748517734833,93.94173431396518
24.7495492,93.931906
6.5178394200441
75984
Canchipur lab building

Progress Update : 13/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8649481,93.8084553
14.889214151218
75984
C/O laboratory building at Kangchup. Column casting

Progress Update : 12/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81035127,93.88819066
5.4134491798795
75984
C/O SR at Iroisemba. Slab

Progress Update : 12/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81036761,93.88823449
5.4091401672559
75984
C/O SR at Iroisemba. Slab

Progress Update : 11/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81042745,93.88844546
5.3882835005792
75984
C/O SR at Iroisemba. Slab casting

Progress Update : 11/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81051316,93.88829167
5.4043601511342
75984
C/O SR at Iroisemba. Slab casting

Progress Update : 11/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81035189,93.88827671
5.4047834504225
75984
C/O SR at Iroisemba. Slab casting

Progress Update : 10/10/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7716682,93.9195154
4.5706169349789
75984
Chingtham leikai zone pipeline lying at Konjeng Leikai Kounathabi

Progress Update : 10/10/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7716682,93.9195154
4.5706169349789
75984
Chingtham leikai zone pipeline lying at Konjeng Leikai Kounathabi

Progress Update : 08/10/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8222683,93.95751
2.2883916100022
75984
Casting of 5th lift of 0.8 MLD OHT at Khuman lampak

Progress Update : 08/10/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8222515,93.9575746
2.2915937388851
75984
Casting of 5th lift of 0.8 MLD OHT at Khuman lampak

Progress Update : 08/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8660429,93.8090909
14.884102429458
75984
C/O laboratory building at Kangchup. Column casting

Progress Update : 08/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8660429,93.8090909
14.884102429458
75984
C/O laboratory building at Kangchup. Column casting

Progress Update : 08/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8660429,93.8090909
14.884102429458
75984
C/O laboratory building at Kangchup. Column casting

Progress Update : 08/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8660429,93.8090909
14.884102429458
75984
C/O laboratory building at Kangchup. Column casting

Progress Update : 07/10/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8155102,93.9646419
2.4781869881004
75984
Casting of tank wall of 0.8MLD OHT at TV Laiwangma Shift II

Progress Update : 07/10/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8155102,93.9646419
2.4781869881004
75984
Casting of tank wall of 0.8MLD OHT at TV Laiwangma Shift II

Progress Update : 07/10/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8157024,93.9635868
2.3872467926612
75984
Casting of tank wall of 0.8MLD OHT at TV Laiwangma Shift II

Progress Update : 05/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86336209,93.81091362
14.58965334891
75984
Laying of DI k9 transmission pipe. Kangchup bridge

Progress Update : 05/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8600613,93.8113155
14.400272764614
75984
Laying of DI k9 transmission pipe. Kangchup bridge

Progress Update : 05/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86304364,93.81096358
14.570059594434
75984
Laying of DI k9 transmission pipe. Kangchup bridge

Progress Update : 05/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8642074,93.8084553
14.854095255903
75984
Laying of DI k9 transmission pipe. Kangchup bridge

Progress Update : 03/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8123691,93.9340665
0.94541125248494
75984
C/O OHT at lalambung. Bean and bottom conical dome casting

Progress Update : 03/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81313118,93.92863142
1.4638783971071
75984
C/O OHT at lalambung. Bean and bottom conical dome casting

Progress Update : 03/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8134543,93.9283865
1.5017738569887
75984
C/O OHT at lalambung. Bean and bottom conical dome casting

Progress Update : 03/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81293428,93.92868136
1.4500442685054
75984
C/O OHT at lalambung. Bean and bottom conical dome casting

Progress Update : 01/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8104355,93.88822397
5.410651014685
75984
C/O SR at Iroisemba. Slab reinforcement

Progress Update : 01/10/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.7967742,93.8675982
7.5770108096788
75984
C/O SR at Iroisemba. Slab reinforcement

Progress Update : 01/10/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7774153,93.9252339
3.7353515925438
75984
Chingtham leikai zone 0.8ml capacity overhead tank, casting of contener wall

Progress Update : 01/10/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7809576,93.933032
3.0776111061043
75984
Chingtham leikai zone 0.8ml capacity overhead tank, casting of contener wall

Progress Update : 30/09/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81311876,93.92863894
1.4626008833905
75984
C/O OHT at lalambung. Bottom conical reinforcement

Progress Update : 30/09/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8132211,93.9283059
1.4978535124258
75984
C/O OHT at lalambung. Bottom conical reinforcement

Progress Update : 30/09/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81306143,93.92871066
1.4533325065582
75984
C/O OHT at lalambung. Bottom conical reinforcement

Progress Update : 30/09/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8135608,93.9282074
1.5232239256168
75984
C/O OHT at lalambung. Bottom conical reinforcement

Progress Update : 28/09/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8642155,93.8081375
14.88351663676
75984
C/O laboratory building at Kangchup. Grade beam

Progress Update : 28/09/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86702428,93.80714677
15.108200580067
75984
C/O laboratory building at Kangchup. Grade beam

Progress Update : 27/09/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.820956,93.9595767
2.3422315203758
75984
Casting of bottom raft for intake well at Khuman lampak

Progress Update : 27/09/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8209468,93.9595865
2.3423382373315
75984
Casting of bottom raft for intake well at Khuman lampak

Progress Update : 27/09/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8220788,93.9574237
2.267213647227
75984
Casting of 3rd lift tank wall for 0.8 ML OHT at Khuman lampak

Progress Update : 27/09/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8219801,93.9573541
2.2544554143315
75984
Casting of 3rd lift tank wall for 0.8 ML OHT at Khuman lampak

Progress Update : 27/09/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8221088,93.9575052
2.2753481930952
75984
Casting of 3rd lift tank wall for 0.8 ML OHT at Khuman lampak

Progress Update : 27/09/2021
ONGOING
II
kimaimol
24.80748517734833,93.94173431396518
24.8148871,93.9439356
0.85247572509825
75984
C/o OHT at north AOC

Progress Update : 25/09/2021
ACTIVE
III
Naresh55
24.80748517734833,93.94173431396518
24.7991787,93.9523743
1.4164513683264
75984
Construction of 0.8 ML capacity OHT at Ningthempukhri

Progress Update : 25/09/2021
ACTIVE
III
Naresh55
24.80748517734833,93.94173431396518
24.7991014,93.9524501
1.4278573498103
75984
Construction of 5.45MLD capacity WTP at Ningthempukhri (Clariflocculator)

Progress Update : 25/09/2021
ACTIVE
III
Naresh55
24.80748517734833,93.94173431396518
24.799124,93.9523876
1.4214400338513
75984
Construction of 5.45MLD capacity WTP at Ningthempukhri (Cascade Aerator, Flash mixture)

Progress Update : 25/09/2021
ACTIVE
III
Naresh55
24.80748517734833,93.94173431396518
24.7990002,93.9527158
1.455545603262
75984
Construction of 5.45MLD capacity WTP at Ningthempukhri (Filter house)

Progress Update : 25/09/2021
ACTIVE
II
Naresh55
24.80748517734833,93.94173431396518
24.7984826,93.9589996
2.0096687536287
75984
Laying of 100 mm dia pipeline at kongpal mutum leikai Ningthempukhri Zone

Progress Update : 25/09/2021
ACTIVE
II
Naresh55
24.80748517734833,93.94173431396518
24.7916778,93.9663755
3.0455308273977
75984
Construction of 0.45 ML capacity ESR at Thambalkhong (Rahmania shift II B)

Progress Update : 25/09/2021
ACTIVE
II
Naresh55
24.80748517734833,93.94173431396518
24.791686,93.9663571
3.0434878698128
75984
Construction of 0.45 ML capacity ESR at Thambalkhong (Rahmania shift II B)

Progress Update : 25/09/2021
Acitive
III
Naresh55
24.80748517734833,93.94173431396518
24.7915097,93.9663788
3.0566281809784
75984
Construction of 0.8 ML Capacity OHT at Thambalkhong for Rahmania shift II B

Progress Update : 25/09/2021
Active
III
Naresh55
24.80748517734833,93.94173431396518
24.7759443,93.9474232
3.5537203056281
75984
Construction of 0.45 ML capacity OHT at Akampat (Kongba irong)

Progress Update : 25/09/2021
Active
3
ben
24.80748517734833,93.94173431396518
24.8245288,93.9634158
2.8947000728025
75984
Laying of transmission main pipeline of 350 mm dia at Ukhrul road , sajor leikai zone

Progress Update : 25/09/2021
Active
3
ben
24.80748517734833,93.94173431396518
24.8205182,93.9577256
2.1690282345439
75984
Construction of 0.2 ML CAPACITY ESR at LAIWANGMA SHIFT I

Progress Update : 25/09/2021
Active
3
ben
24.80748517734833,93.94173431396518
24.820709,93.9577324
2.183765551781
75984
Construction of 0.45 ML CAPACITY OHT at LAIWANGMA SHIFT I

Progress Update : 25/09/2021
Active
3
ben
24.80748517734833,93.94173431396518
24.7892975,93.9430412
2.0265779002355
75984
Construction of 5.45 ML CAPACITY intake well at Ninngthempukhri

Progress Update : 25/09/2021
Active
3
ben
24.80748517734833,93.94173431396518
24.7891875,93.9434045
2.04148360339
75984
Construction of 0.45 ML CAPACITY OHT at new thumbuthong

Progress Update : 25/09/2021
In progress
Phase III package IWS P-II (W)
pahten123
24.80748517734833,93.94173431396518
24.74941,93.92541
6.6643295023968
75984
Canchipur Hill top Reservoir

Progress Update : 25/09/2021
In progress
Phase III package IWS P-II (W)
pahten123
24.80748517734833,93.94173431396518
24.7515663,93.9279923
6.370483661277
75984
Canchipur Hill top Reservoir

Progress Update : 25/09/2021
Active
3
ben
24.80748517734833,93.94173431396518
24.7923664,93.9448519
1.7102488012226
75984
Construction of 0.6 ML CAPACITY OHT at Old thumbuthong

Progress Update : 25/09/2021
In progress
Phase III package IWS P-II (W)
pahten123
24.80748517734833,93.94173431396518
24.7499633,93.9275217
6.5547950717028
75984
Canchipur Lab buliding

Progress Update : 25/09/2021
In progress
Phase III package IWS P-II (W)
pahten123
24.80748517734833,93.94173431396518
24.7500933,93.92754
6.5402865545381
75984
Canchipur Lab buliding

Progress Update : 24/09/2021
active
III
Naresh55
24.80748517734833,93.94173431396518
24.8066753,93.9554612
1.3883729196991
33259.2
Laying of 100 mm di pipe at nongmeibung ningthempukhri zone

Progress Update : 23/09/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8149426,93.9647891
2.4701631354746
75984
Casting of walkway and wall starter 0.8MLD Laiwangma Shift II OHT TV Tower

Progress Update : 23/09/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8149426,93.9647891
2.4701631354746
75984
Casting of walkway and wall starter 0.8MLD Laiwangma Shift II OHT TV Tower

Progress Update : 23/09/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8153918,93.9645248
2.4624351853561
75984
Casting of walkway and wall starter at 0.8MLD Laiwangma Shift II OHT TV Tower

Progress Update : 23/09/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8153918,93.9645248
2.4624351853561
75984
Casting of walkway and wall starter at 0.8MLD Laiwangma Shift II OHT TV Tower

Progress Update : 22/09/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.776458333333,93.925761666667
3.8080294500047
75984
Chingtham leikai zone 0.8ml capacity overhead tank casting of dome

Progress Update : 22/09/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7773666,93.9252075
3.7413868104381
75984
Chingtham leikai zone 0.8ml capacity overhead tank casting of dome

Progress Update : 20/09/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86716619,93.80717426
15.11262204649
75984
C/O laboratory building at Kangchup. Foundation

Progress Update : 20/09/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86724745,93.80711138
15.122286850138
75984
C/O laboratory building at Kangchup. Foundation

Progress Update : 18/09/2021
ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7773836,93.9251951
3.7402534665651
75984
construction of overhead tank 0.8ml. casting if ring beam ....

Progress Update : 18/09/2021
ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7773836,93.9251951
3.7402534665651
33259.2
construction of overhead tank 0.8ml. casting if ring beam ....

Progress Update : 18/09/2021
ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7755927,93.9274464
3.8281852040744
75984
construction of overhead tank 0.8ml. casting if ring beam ....

Progress Update : 17/09/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7773535,93.925226
3.7418586793466
75984
Chingtham leikai zone 0.8ml capacity overhead tank

Progress Update : 17/09/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7773535,93.925226
3.7418586793466
75984
Chingtham leikai zone 0.8ml capacity overhead tank

Progress Update : 16/09/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7690589,93.9223503
4.6993477447671
75984
Chingtham leikai zone pipeline lying at Mongsangei lai leirak

Progress Update : 16/09/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7687819,93.9230684
4.697828125169
75984
Chingtham leikai zone pipeline lying at Mongsangei lai leirak

Progress Update : 15/09/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8153758,93.9646146
2.4702709105761
75984
Casting of conical shell at 0.8MLD T.V Tower laiwangma shift II

Progress Update : 15/09/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8153478,93.9646028
2.468053383427
75984
Casting of conical shell at 0.8MLD T.V Tower laiwangma shift II

Progress Update : 15/09/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8153746,93.9647089
2.479122841494
33259.2
Casting of conical shell at 0.8MLD TV Tower Laiwangma Shift II

Progress Update : 15/09/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8154935,93.9648499
2.4971204446711
75984
Casting of conical shell at 0.8MLD TV Tower Laiwangma Shift II

Progress Update : 15/09/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8648209,93.8178111
14.035920268932
75984
Laying of DI k9 pipes from Kangchup to Iroisemba MR-2. Pile cap at kangchup bridge

Progress Update : 15/09/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8648209,93.8178111
14.035920268932
75984
Laying of DI k9 pipes from Kangchup to Iroisemba MR-2. Pile cap at kangchup bridge

Progress Update : 13/09/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8224617,93.957545
2.306327952643
75984
Casting of first lift of tank wall of 0.8ML OHT at Khuman lampak

Progress Update : 09/09/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8153969,93.9646248
2.4720669857426
75984
Casting of bottom dome 0.8MLD OHT at Laiwangma shift II

Progress Update : 09/09/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8153927,93.9646446
2.4737686318287
75984
Casting of bottom dome 0.8MLD OHT at Laiwangma shift II

Progress Update : 09/09/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8154198,93.9645174
2.4628508661321
75984
Casting of bottom dome 0.8MLD OHT at Laiwangma shift II

Progress Update : 09/09/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8153857,93.9644804
2.4580074768863
75984
Casting of bottom dome 0.8MLD OHT at Laiwangma shift II

Progress Update : 09/09/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8154816,93.9646438
2.4772229933587
75984
Casting of bottom dome 0.8MLD OHT at Laiwangma shift II

Progress Update : 09/09/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8153551,93.9645221
2.4607268976858
75984
Casting of bottom ring beam 0.8MLD OHT at Laiwangma shift II

Progress Update : 09/09/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.815295,93.9646535
2.4707702347922
75984
Casting of bottom ring beam 0.8MLD OHT at Laiwangma shift II

Progress Update : 09/09/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8151116,93.9646022
2.4588183149673
75984
Casting of bottom ring beam 0.8MLD OHT at Laiwangma shift II

Progress Update : 08/09/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7690838,93.9213948
4.7378247085602
75984
Chingtham leikai zone pipeline lying at Club Keithel

Progress Update : 08/09/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.7971528,93.86728
7.6022436242386
75984
C/O SR at Iroisemba. 4th and final wall lift

Progress Update : 08/09/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81036833,93.88823929
5.408661291966
75984
C/O SR at Iroisemba. 4th and final wall lift

Progress Update : 08/09/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81050287,93.88812918
5.4206574750317
75984
C/O SR at Iroisemba. 4th and final wall lift

Progress Update : 08/09/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8105962,93.88808322
5.4259368953229
75984
C/O SR at Iroisemba. 4th and final wall lift

Progress Update : 07/09/2021
ONGOING
III
kimaimol
24.80748517734833,93.94173431396518
24.8150965,93.9438903
0.87382552570068
75984
C/O OHT AT NORTH AOC

Progress Update : 06/09/2021
Active
Phase lll
Laksmee
24.80748517734833,93.94173431396518
24.8153901,93.9646053
2.4699587540886
33259.2
Reinforcement work at 0.8MLD OHT TV TOWER Laiwangma shift II

Progress Update : 06/09/2021
Active
Phasr lll
Laksmee
24.80748517734833,93.94173431396518
24.8153901,93.9646053
2.4699587540886
75984
Reinforcement work at 0.8MLD OHT TV TOWER Laiwangma shift II

Progress Update : 06/09/2021
Active
Phasr lll
Laksmee
24.80748517734833,93.94173431396518
24.8153876,93.9646056
2.4698881694622
75984
Reinforcement work at 0.8MLD OHT TV TOWER Laiwangma shift II

Progress Update : 04/09/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8220965,93.9573622
2.2642947579014
75984
Casting of conical wall for OHT tank at Khuman lampak

Progress Update : 04/09/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8220528,93.956243
2.1835111788419
75984
Casting of conical wall for OHT tank at Khuman lampak

Progress Update : 04/09/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8220531,93.9572963
2.2562002932041
75984
Casting of conical wall for OHT tank at Khuman lampak

Progress Update : 04/09/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.864602,93.8075019
14.959806481255
75984
C/O laboratory building at Kangchup. Foundation

Progress Update : 04/09/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.864602,93.8075019
14.959806481255
75984
C/O laboratory building at Kangchup. Foundation

Progress Update : 04/09/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.86735102,93.80720164
15.119167512403
75984
C/O laboratory building at Kangchup. Foundation

Progress Update : 04/09/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7679644,93.9217133
4.8367775543214
75984
Chingtham leikai zone pipeline lying

Progress Update : 04/09/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.820882,93.9596511
2.3427694436658
75984
Casting of 11th lift intake well at Khuman lampak

Progress Update : 31/08/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7638902,93.9217133
5.251769012174
75984
Chingtham leikai zone pipeline lying on Mongsangei

Progress Update : 31/08/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81314157,93.92868038
1.4599132547041
75984
C/O OHT and ESR at lalambung. Pump house slab casting

Progress Update : 31/08/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81313151,93.92869318
1.4582656553015
75984
C/O OHT and ESR at lalambung. Pump house slab casting

Progress Update : 31/08/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8144963,93.9268094
1.696088179809
75984
C/O OHT and ESR at lalambung. Pump house slab casting

Progress Update : 31/08/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81298827,93.92891809
1.4309287963376
75984
C/O OHT and ESR at lalambung. Pump house slab casting

Progress Update : 31/08/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81325049,93.92897135
1.4388214028693
75984
C/O OHT and ESR at lalambung. Pump house slab casting

Progress Update : 31/08/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81311096,93.92862346
1.4636420221749
75984
C/O OHT and ESR at lalambung. Pump house slab casting

Progress Update : 31/08/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81296291,93.92851474
1.4666582109446
33259.2
C/O OHT and ESR at lalambung. Pump house slab casting

Progress Update : 31/08/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81307844,93.9287725
1.4485010583246
75984
C/O OHT and ESR at lalambung. Pump house slab casting

Progress Update : 27/08/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8220073,93.9572988
2.2527231494476
75984
Casting of bottom dome for 0.8ML OHT at Khuman lampak

Progress Update : 27/08/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8221392,93.9573361
2.2658722518448
75984
Casting of bottom dome for 0.8ML OHT at Khuman lampak

Progress Update : 27/08/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8220767,93.9573452
2.261520169332
75984
Casting of bottom dome for 0.8ML OHT at Khuman lampak

Progress Update : 25/08/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8220924,93.9572893
2.2588483176478
75984
Reinforcement work for dome portion of 0.8ML OHT at Khuman lampak

Progress Update : 25/08/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8221021,93.9573059
2.2607881434469
75984
Reinforcement work for dome portion of 0.8ML OHT at Khuman lampak

Progress Update : 24/08/2021
Ongoing
I
ulen
24.80748517734833,93.94173431396518
24.81082078,93.88771188
5.4649727307946
75984
C/O RCC type-II Quarter at Iroisemba MR-II. Foundation

Progress Update : 24/08/2021
Ongoing
I
ulen
24.80748517734833,93.94173431396518
24.81072825,93.88791576
5.4437540029869
75984
C/O RCC type-II Quarter at Iroisemba MR-II. Foundation

Progress Update : 24/08/2021
Ongoing
I
ulen
24.80748517734833,93.94173431396518
24.81074567,93.88801927
5.4334584486567
75984
C/O RCC type-II Quarter at Iroisemba MR-II. Foundation

Progress Update : 24/08/2021
Ongoing
I
ulen
24.80748517734833,93.94173431396518
24.8106275,93.88801515
5.4330151276824
75984
C/O RCC type-II Quarter at Iroisemba MR-II. Foundation

Progress Update : 24/08/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81039498,93.88815869
5.416957415889
75984
C/O SR at Iroisemba. 3rd wall lift

Progress Update : 24/08/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81042445,93.88815587
5.417437570663
75984
C/O SR at Iroisemba. 3rd wall lift

Progress Update : 24/08/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81049853,93.88851571
5.3816911290532
75984
C/O SR at Iroisemba. 3rd wall lift

Progress Update : 22/08/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7639732,93.9185284
5.3753720333617
75984
Chingtham leikai zone pipe lying

Progress Update : 12/08/2021
ONGOING
III
kimaimol
24.80748517734833,93.94173431396518
24.814829,93.9453563
0.89464745753362
75984
C/O of OHT at north AOC. column casting

Progress Update : 11/08/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.782248,93.9273745
3.1583591707315
75984
Chingtham leikai zone pipeline lying

Progress Update : 11/08/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8153958,93.9646856
2.4777591627132
75984
0.80 ML OHT Laiwangma shift II T. V. Tower

Progress Update : 11/08/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8156356,93.9635352
2.379598352861
75984
0.80 ML OHT Laiwangma shift II T. V. Tower

Progress Update : 10/08/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7840024,93.9238618
3.1736506749394
75984
Chingtham leikai zone pipeline lying

Progress Update : 09/08/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81313571,93.92868652
1.4590733803705
75984
C/O ESR at lalambung. Pump house column casting upto 3 mts.

Progress Update : 09/08/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8130569,93.9283441
1.4866664878601
75984
C/O ESR at lalambung. Pump house column casting upto 3 mts.

Progress Update : 09/08/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81286081,93.92856125
1.4576981709817
75984
C/O ESR at lalambung. Pump house column casting upto 3 mts.

Progress Update : 09/08/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81302606,93.92883052
1.4407147613443
75984
C/O ESR at lalambung. Pump house column casting upto 3 mts.

Progress Update : 08/08/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7827295,93.9236242
3.3042896241103
75984
Chingtham leikai zone pipe lying

Progress Update : 05/08/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7815685,93.9255353
3.3132501675875
75984
Chingtham leikai zone pipe lying

Progress Update : 01/08/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7859928,93.9246142
2.9490728191219
75984
Chingtham leikai zone, earth filling for pipe lying

Progress Update : 01/08/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7859939,93.9246633
2.9460722378593
75984
Chingtham leikai zone, pipe lying

Progress Update : 30/07/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7858912,93.9251442
2.9273061738577
75984
Chingtham leikai zone earth filling for pipe lying

Progress Update : 30/07/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.785895,93.9251459
2.9268614411641
75984
Chingtham leikai zone earth filling for pipe lying

Progress Update : 30/07/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7857607,93.9261076
2.8849239217881
75984
Chingtham leikai zone, pipe lying at Laishram Leikai

Progress Update : 30/07/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8309178,93.9557066
2.9625604320632
75984
100mm DI pipe laying at Laipham khunou for Khuman lampak zone

Progress Update : 30/07/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8311467,93.955908
2.9946229578842
75984
100mm DI pipe laying at Laipham khunou for Khuman lampak zone

Progress Update : 30/07/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8313113,93.9560914
3.0195516378095
75984
150mm DI pipe laying at Laipham khunou for Khuman lampak zone

Progress Update : 15/07/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81302095,93.92897607
1.4272044361376
75984
C/O OHT AT LALAMBUNG. 2nd column casting

Progress Update : 15/07/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81299327,93.9288621
1.436275977077
75984
C/O OHT AT LALAMBUNG. 2nd column casting

Progress Update : 15/07/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81285893,93.92891185
1.4254108342182
75984
C/O OHT AT LALAMBUNG. 2nd column casting

Progress Update : 15/07/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81297292,93.9287491
1.4456436869816
75984
C/O OHT AT LALAMBUNG. 2nd column casting

Progress Update : 15/07/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8123445,93.9291571
1.37958966866
30259.2
C/O OHT AT LALAMBUNG. 2nd column casting

Progress Update : 15/07/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81288014,93.92869171
1.4465889446222
30259.2
C/O ESR AT LALAMBUNG. Slab casting

Progress Update : 15/07/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8133922,93.9284228
1.495443129808
75984
C/O ESR AT LALAMBUNG. Slab casting

Progress Update : 15/07/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8131536,93.9284086
1.4852813989921
75984
C/O OHT AT LALAMBUNG. 2nd column casting

Progress Update : 15/07/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8134144,93.9293764
1.4107643311125
75984
C/O OHT AT LALAMBUNG. 2nd column casting

Progress Update : 15/07/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8134144,93.9293764
1.4107643311125
75984
C/O OHT AT LALAMBUNG. 2nd column casting

Progress Update : 12/07/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8209591,93.9595733
2.3421881658249
75984
Casting for 9th lift 5.45 MLD Intake well Khuman lampak

Progress Update : 12/07/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8214784,93.9585306
2.3009414854732
30259.2
Casting for 9th lift 5.45 MLD Intake well Khuman lampak

Progress Update : 11/07/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8134275,93.9285644
1.4843600861938
75984
C/O OHT and ESR at lalambung.

Progress Update : 11/07/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8131447,93.9282088
1.5031508742047
75984
C/O OHT and ESR at lalambung.

Progress Update : 05/07/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8304193,93.9526073
2.7761035096698
75984
100 mm DI Pipe laying at Nagaram E- block for Khuman lampak zone

Progress Update : 03/07/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8128472,93.9282968
1.4814722377503
75984
C/O ESR at lalambung. Wall 3rd lift

Progress Update : 03/07/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81317126,93.92855963
1.4723350966623
75984
C/O OHT at lalambung.

Progress Update : 01/07/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.777336,93.9252592
3.7421105195219
75984
Chingtham leikai zone 0.8ml capacity overhead tank Casting of third lift

Progress Update : 01/07/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7773637,93.9251708
3.7433286037721
75984
Chingtham leikai zone 0.8ml capacity overhead tank Casting of third lift

Progress Update : 30/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81035433,93.88851738
5.3805515734144
75984
C/O SR at Iroisemba.

Progress Update : 30/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81050676,93.88801966
5.431716615291
75984
C/O SR at Iroisemba.

Progress Update : 29/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81297979,93.92871606
1.4489892888289
75984
C/O ESR at lalambung. Wall 2nd lift casting

Progress Update : 29/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.813126,93.9281205
1.5103842843823
75984
C/O ESR at lalambung. Wall 2nd lift casting

Progress Update : 29/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8129179,93.929505
1.3741583349451
75984
C/O ESR at lalambung. Wall 2nd lift casting

Progress Update : 28/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8134037,93.928446
1.4939026747072
75984
C/O OHT and ESR at lalambung.

Progress Update : 28/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8134037,93.928446
1.4939026747072
75984
C/O OHT and ESR at lalambung.

Progress Update : 23/06/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8209614,93.9595766
2.342607737849
75984
Casting of 7th lift for 5.45MLD Intake well at Khuman lampak

Progress Update : 21/06/2021
active
III
Naresh55
24.80748517734833,93.94173431396518
24.7520657,93.9829908
7.4375822423442
75984
laying of 600mm dia pipe from irilbung bridge to wss

Progress Update : 21/06/2021
active
III
Naresh55
24.80748517734833,93.94173431396518
24.7520029,93.9831808
7.4541186141646
75984
laying of 600mm dia pipe from irilbung bridge to wss

Progress Update : 19/06/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7775909,93.9253454
3.7128563417782
75984
Chingtham leikai zone 0.8ml capacity overhead tank casting of 3rd blessing bim

Progress Update : 19/06/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.776653333333,93.925768333333
3.7881110327763
75984
Chingtham leikai zone 0.8ml capacity overhead tank casting of 3rd blessing bim

Progress Update : 19/06/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.776416666667,93.925753333333
3.8125830562087
75984
Chingtham leikai zone 0.8ml capacity overhead tank casting of 3rd blessing bim

Progress Update : 19/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81322569,93.92881351
1.4518863371287
75984
C/O ESR AT LALAMBUNG. COLUMN & WALL 1ST LIFT CASTING

Progress Update : 19/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8131465,93.9297494
1.3635910633315
75984
C/O ESR AT LALAMBUNG. COLUMN & WALL 1ST LIFT CASTING

Progress Update : 19/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81294696,93.92885501
1.4347363678038
75984
C/O ESR AT LALAMBUNG. COLUMN & WALL 1ST LIFT CASTING

Progress Update : 19/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8123863,93.9291116
1.3856372959374
75984
C/O ESR AT LALAMBUNG. COLUMN & WALL 1ST LIFT CASTING

Progress Update : 19/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8134057,93.9283282
1.5046825500216
75984
C/O ESR AT LALAMBUNG. COLUMN & WALL 1ST LIFT CASTING

Progress Update : 19/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8134861,93.9284309
1.499325425166
75984
C/O ESR AT LALAMBUNG. COLUMN & WALL 1ST LIFT CASTING

Progress Update : 19/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81287221,93.92857729
1.4567424848466
75984
C/O ESR AT LALAMBUNG. WALL 1ST LIFT CASTING

Progress Update : 18/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.7903038,93.859963
8.4718971588672
75984
C/O 2.5 ML SR at Iroisemba. Wall 2nd lift casting

Progress Update : 18/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81046018,93.88828506
5.404663396671
75984
C/O 2.5 ML SR at Iroisemba. Wall 2nd lift casting

Progress Update : 18/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.824954,93.9516602
2.1854552582539
75984
C/O 2.5 ML SR at Iroisemba. Wall 2nd lift casting

Progress Update : 18/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.7967661,93.8679163
7.5454470373316
75984
C/O 2.5 ML SR at Iroisemba. Wall 2nd lift casting

Progress Update : 17/06/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8152744,93.9646549
2.4700986586017
75984
Steel reinforcement of bottom ring beam 0.8 OHT TV tower Laiwangma shift II

Progress Update : 17/06/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8153848,93.964485
2.4584053358132
30259.2
Steel reinforcement of bottom ring beam 0.8 OHT TV tower Laiwangma shift II

Progress Update : 16/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81303087,93.92885994
1.4382604198084
75984
C/O OHT at lalambung. Column 1st lift casting

Progress Update : 16/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81308037,93.92883807
1.4426196060406
75984
C/O OHT at lalambung. Column 1st lift casting

Progress Update : 16/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8130558,93.9287246
1.4517930027266
75984
C/O OHT at lalambung. Column 1st lift casting

Progress Update : 16/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81299924,93.9289494
1.4285958977097
75984
C/O ESR AT LALAMBUNG. Haunch portion casting

Progress Update : 16/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81300698,93.92898318
1.4258875807044
75984
C/O ESR AT LALAMBUNG. Haunch portion casting

Progress Update : 16/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8144463,93.9287206
1.524524896011
75984
C/O ESR AT LALAMBUNG. Haunch portion casting

Progress Update : 11/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81041595,93.88814157
5.4188214819763
75984
C/O SR at Iroisemba. Wall shuttering

Progress Update : 11/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81059743,93.88804011
5.4302877464882
75984
C/O SR at Iroisemba. Wall shuttering

Progress Update : 11/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81306535,93.92868682
1.4556947275211
75984
C/O OHT & ESR at lalambung. ESR wall shuttering

Progress Update : 11/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81302355,93.92869498
1.4529740367323
75984
C/O OHT & ESR at lalambung. ESR wall shuttering

Progress Update : 11/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8132111,93.9283546
1.4929331980729
75984
C/O OHT & ESR at lalambung. ESR wall shuttering

Progress Update : 11/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81298788,93.92884129
1.4379209428798
75984
C/O OHT & ESR at lalambung. Column shuttering

Progress Update : 08/06/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7774244,93.9252304
3.7346035084732
75984
Chingtham leikai zone 0.8ml capacity overhead tank casting of second lifts Callum

Progress Update : 08/06/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7789483,93.9322366
3.3146750883533
75984
Chingtham leikai zone 0.8ml capacity overhead tank casting of second lifts Callum

Progress Update : 07/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8125697,93.9296762
1.3418962847815
75984
C/O OHT & ESR at lalambung. Cube test for raft casting ESR

Progress Update : 07/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81298096,93.92890272
1.4319842182283
75984
C/O OHT & ESR at lalambung. Cube test for raft casting ESR

Progress Update : 07/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8130613,93.9283061
1.490357146077
75984
C/O OHT & ESR at lalambung. Raft casting of ESR

Progress Update : 07/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81301821,93.92884894
1.4386610302206
75984
C/O OHT & ESR AT LALAMBUNG. ESR RAFT CASTING

Progress Update : 07/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8118123,93.9303133
1.2490765928568
75984
C/O OHT & ESR AT LALAMBUNG. ESR RAFT CASTING

Progress Update : 07/06/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81314253,93.92844802
1.4811566833339
75984
C/O OHT & ESR AT LALAMBUNG. ESR RAFT CASTING

Progress Update : 30/05/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81299111,93.92863346
1.4570811855192
75984
C/O OHT at lalambung.1st bracing beam

Progress Update : 26/05/2021
Ongoing
1
Shitalkumar
24.80748517734833,93.94173431396518
24.8000645,93.9180215
2.5316211842987
75984
Construction of OHT 0.8ML at Nepra Menjor (Tera boys) (SH: Casting of RCC column 3rd lift for OHT)

Progress Update : 23/05/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81316402,93.92886644
1.4440789747399
75984
C/O OHT at lalambung. First bracing beam

Progress Update : 16/05/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.777513,93.9252766
3.7237060239415
75984
Chingtham leikai zone 0.8ml capacity overhead tank second lift blessing bim

Progress Update : 11/05/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8264727,93.9570521
2.6166808039901
75984
Laying of 100mm pipe laying at Lairikyengbam Leikai

Progress Update : 09/05/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81289769,93.92899456
1.4196576628524
75984
C/O OHT at lalambung. Pile cap complete casting

Progress Update : 08/05/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81308013,93.92896614
1.4309568406028
75984
C/O OHT at lalambung. Pile cap casting

Progress Update : 08/05/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8124094,93.9290913
1.3885319288581
75984
C/O OHT at lalambung. Pile cap casting

Progress Update : 08/05/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81294491,93.92892459
1.4282801919099
75984
C/O OHT at lalambung. Pile cap casting

Progress Update : 08/05/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81294732,93.92895504
1.4256130948332
75984
C/O OHT at lalambung. Pile cap casting

Progress Update : 08/05/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8125331,93.9288488
1.4164497618527
75984
C/O OHT at lalambung. Pile cap casting

Progress Update : 07/05/2021
active
phase-III
Naresh55
24.80748517734833,93.94173431396518
24.7650878,93.9770216
5.9086331139864
75984
laying of pipe under ndb package 1 Irilbung zone

Progress Update : 05/05/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81316437,93.92881171
1.4490656517171
75984
C/O OHT at lalambung. Pile cap reinforcement

Progress Update : 05/05/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81311693,93.92881323
1.4466367257833
75984
C/O OHT at lalambung. Pile cap reinforcement

Progress Update : 05/05/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81294315,93.92886178
1.4339380301383
75984
C/O OHT at lalambung. Pile cap reinforcement

Progress Update : 05/05/2021
Ongoing
1
Shitalkumar
24.80748517734833,93.94173431396518
24.8000356,93.917931
2.5413043652
75984
Construction of RCC OHT at Nepra Menjor (Tera Boys) Casting of RCC 3rd bracing beam

Progress Update : 28/04/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8152524,93.9647396
2.4772525546078
75984
Casting of 4th base beam 0.8ML OHT Laiwangma shift II

Progress Update : 28/04/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.81525378,93.9647637
2.479585854668
30259.2
Casting of 4th base beam 0.8ML OHT Laiwangma shift II

Progress Update : 28/04/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8220096,93.9574477
2.2634098836035
75984
Casting of 4th bracing beam for 0.8ML OHT at khuman lampak

Progress Update : 28/04/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8220107,93.9574545
2.2639780210225
75984
Casting of 4th bracing beam for 0.8ML OHT at khuman lampak

Progress Update : 24/04/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8215824,93.958357
2.2959431880222
75984
Casting of kerb well for intake at Khuman lampak

Progress Update : 24/04/2021
III
Ongoing
ulen
24.80748517734833,93.94173431396518
24.8128823,93.9284125
1.4723759982268
75984
C/O OHT at lalambung..PCC

Progress Update : 24/04/2021
III
Ongoing
ulen
24.80748517734833,93.94173431396518
24.8134564,93.9284251
1.4983836111251
75984
C/O OHT at lalambung..PCC

Progress Update : 22/04/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8249624,93.9513415
2.1717362671642
75984
C/O 2.5 ML SR at Iroisemba. Haunch portion casting

Progress Update : 22/04/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8179375,93.9226687
2.2479372129442
75984
C/O 2.5 ML SR at Iroisemba. Haunch portion casting

Progress Update : 22/04/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.7981307,93.8580544
8.5098772309228
75984
C/O 2.5 ML SR at Iroisemba. Haunch portion casting

Progress Update : 22/04/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8113178,93.8924204
4.9953521160706
75984
C/O 2.5 ML SR at Iroisemba. Haunch portion casting

Progress Update : 22/04/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8113178,93.8924204
4.9953521160706
75984
C/O 2.5 ML SR at Iroisemba. Haunch portion casting

Progress Update : 21/04/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81067773,93.88860197
5.3742774206905
75984
C/o 2.5 ml SR at Iroisemba.

Progress Update : 21/04/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81060618,93.88818149
5.4161096796633
75984
C/o 2.5 ml SR at Iroisemba.

Progress Update : 21/04/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81034059,93.88898438
5.3334109216722
75984
C/o 2.5 ml SR at Iroisemba.

Progress Update : 15/04/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8153092,93.9646963
2.4753690863858
75984
Casting of 3rd portion of 0.8 OHT at Laiwangma shift II

Progress Update : 15/04/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.81530672,93.96475196
2.4805324045615
75984
Casting of 3rd portion of 0.8 OHT at Laiwangma shift II

Progress Update : 14/04/2021
In progress
Canchipur hill top
pahten123
24.80748517734833,93.94173431396518
24.7482622,93.9268548
6.7541357172197
75984
5th wall lift casting

Progress Update : 10/04/2021
Active
III
Naresh55
24.80748517734833,93.94173431396518
24.798661,93.9526192
1.472984952861
75984
Construction of 5.45 MLD Capacity WTP at Ningthempukhri- casting of 4th lift wall for filter house

Progress Update : 10/04/2021
Actibe
III
Naresh55
24.80748517734833,93.94173431396518
24.7916123,93.9662719
3.0412182209628
75984
construction of 0.45 ML capacity Reservoir at Rahmania (Thambalkhong)- casting of 3rd lift wall for reservoir

Progress Update : 27/03/2021
Packege 1
Ongoing
herojit
24.80748517734833,93.94173431396518
24.8073963,93.9663072
2.4801447610589
75984
Casting of beam for 0.45ml OHT and casting of column for 0.80ml OHT @t porompat w/s plat.

Progress Update : 27/03/2021
Packege 1
Ongoing
herojit
24.80748517734833,93.94173431396518
24.8064386,93.9656838
2.4200145220072
75984
Casting of beam for 0.45ml OHT and casting of column for 0.80ml OHT @t porompat w/s plat.

Progress Update : 27/03/2021
Packege 1
Ongoing
herojit
24.80748517734833,93.94173431396518
24.8077592,93.9663308
2.482690336531
75984
Casting of beam for 0.45ml OHT and casting of column for 0.80ml OHT @t porompat w/s plat.

Progress Update : 27/03/2021
Packege 1
Ongoing
herojit
24.80748517734833,93.94173431396518
24.8064386,93.9656838
2.4200145220072
75984
Casting of beam for 0.45ml OHT and casting of column for 0.80ml OHT @t porompat w/s plat.

Progress Update : 27/03/2021
Packege 1
Ongoing
herojit
24.80748517734833,93.94173431396518
24.8163531,93.9688716
2.9109331876639
75984
Casting of beam for 0.45ml OHT and casting of column for 0.80ml OHT @t porompat w/s plat.

Progress Update : 26/03/2021
Ongoing
III
Shitalkumar
24.80748517734833,93.94173431396518
24.8001439,93.9179222
2.5382449879311
75984
Construction of OHT 0.8ML at Tera Boys (Nepra Menjor) (Casting of Column 1st lift)

Progress Update : 26/03/2021
Ongoing
III
Shitalkumar
24.80748517734833,93.94173431396518
24.8001046,93.9177303
2.5579914884063
75984
Construction of OHT 0.8ML at Tera Boys (Nepra Menjor) (Casting of Column 1st lift)

Progress Update : 26/03/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7774695,93.9264909
3.6750536273526
75984
Chingtham leikai zone 0.8ml capacity overhead tank Callum casting for second blessing

Progress Update : 26/03/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.776725,93.925745
3.7819054785374
75984
Chingtham leikai zone 0.8ml capacity overhead tank Callum casting for second blessing

Progress Update : 26/03/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8152419,93.9647157
2.4745848393069
75984
Casting of third brace beam at Laiwangma shift II TV Tower

Progress Update : 26/03/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.81531774,93.96484408
2.4896699659823
75984
Casting of third brace beam at Laiwangma shift II TV Tower

Progress Update : 25/03/2021
In progress
Canchipur hill top GLSR
pahten123
24.80748517734833,93.94173431396518
24.749503,93.9250393
6.6636771277522
75984
Wall 4th lift casting

Progress Update : 23/03/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8245921,93.9513415
2.1349737235893
75984
C/O 2.5 ML SR at Iroisemba. Casting of base slab

Progress Update : 23/03/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8104687,93.88818405
5.4148968363648
75984
C/O 2.5 ML SR at Iroisemba. Casting of base slab

Progress Update : 23/03/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81046961,93.88818738
5.4145675573979
75984
C/O 2.5 ML SR at Iroisemba. Casting of base slab

Progress Update : 22/03/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8245921,93.9513415
2.1349737235893
75984
C/O 2.5 ML SR at Iroisemba. Reinforcement works

Progress Update : 22/03/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81040991,93.88812978
5.4199690664187
75984
C/O 2.5 ML SR at Iroisemba. Reinforcement works

Progress Update : 21/03/2021
Active
III
Naresh55
24.80748517734833,93.94173431396518
24.7984781,93.9525417
1.4808376293791
75984
Construction of 5.45 MLD capacity WTP at ningthempukhri (RCC work for beam, wall and slab for cascade aerator, parshall flume, stilling chamber, flash mixture

Progress Update : 20/03/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.81513729,93.96477281
2.4759679682782
75984
Casting of column( second portion) of 0.8MLD OHT at TV Tower shift II laiwangma

Progress Update : 20/03/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8152981,93.96464589
2.4701723747234
75984
Casting of column( second portion) of 0.8MLD OHT at TV Tower shift II laiwangma

Progress Update : 20/03/2021
Package 1
On going
herojit
24.80748517734833,93.94173431396518
24.8076023,93.9663457
2.4840429241804
75984
Casting of beam for 0.80ml at porompat

Progress Update : 20/03/2021
Package 1
On going
herojit
24.80748517734833,93.94173431396518
24.8109644,93.9686735
2.7462983063485
75984
Casting of beam for 0.80ml at porompat

Progress Update : 20/03/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.7967415,93.8688708
7.4507696324262
75984
C/O SR 2.5 ML at Iroisemba. Reinforcement works

Progress Update : 20/03/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.7967415,93.8688708
7.4507696324262
75984
C/O SR 2.5 ML at Iroisemba. Reinforcement works

Progress Update : 18/03/2021
Active
3
Ton
24.80748517734833,93.94173431396518
24.8177825,93.9848132
4.4959732139079
75984
Pile work for 1000 mm dia transmission main pipe crossing bridge at Iril River

Progress Update : 18/03/2021
Active
3
ben
24.80748517734833,93.94173431396518
24.82214045,93.98572271
4.7290675139579
75984
Construction of pipe crossing bridge for 1000 mm dia pipe laying at iril bridge

Progress Update : 18/03/2021
Active
3
Ton
24.80748517734833,93.94173431396518
24.8177825,93.9848132
4.4959732139079
75984
Pipe laying work of 1000 mm dia Di main along Khurai Tinsid Rd

Progress Update : 18/03/2021
Active
3
Ton
24.80748517734833,93.94173431396518
24.8177825,93.9848132
4.4959732139079
33259.2
Pipe laying work of 1000 mm dia Di main along Khurai Tinsid Rd

Progress Update : 18/03/2021
Active
3
ben
24.80748517734833,93.94173431396518
24.8232539,93.9870186
4.8950013235996
75984
Pipe laying of 1000 mm dia at the southern side of khurai tinsid road

Progress Update : 17/03/2021
Package 1
Ongoing
herojit
24.80748517734833,93.94173431396518
24.8076124,93.9663391
2.4833828427901
75984
Casting of 8 nos colunm for 0.45 ml over head tank of porompat(oht)

Progress Update : 17/03/2021
Package 1
Ongoing
herojit
24.80748517734833,93.94173431396518
24.8076031,93.9664707
2.4966593658517
75984
Casting of 8 nos colunm for 0.45 ml over head tank of porompat(oht)

Progress Update : 17/03/2021
Package 1
Ongoing
herojit
24.80748517734833,93.94173431396518
24.8076108,93.9664286
2.4924148776659
75984
Casting of 8 nos colunm for 0.45 ml over head tank of porompat(oht)

Progress Update : 17/03/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81036231,93.8881771
5.4148875347576
75984
C/O 2.5 ML SR at Iroisemba. REINFORCEMENT

Progress Update : 17/03/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81027432,93.88811022
5.4210592606955
75984
C/O 2.5 ML SR at Iroisemba. REINFORCEMENT

Progress Update : 16/03/2021
Actibe
III
Naresh55
24.80748517734833,93.94173431396518
24.7987341,93.9523975
1.4509076056476
75984
Construction of 5.45MLD capacity WTP at ningthempukhri (casting of 2nd lift wall for filter)

Progress Update : 15/03/2021
Active
III
Naresh55
24.80748517734833,93.94173431396518
24.7913221,93.9664404
3.0738406728109
75984
Construction of 0.45 ML capacity ESR at rahmania (thambalkhong) casting of 1st lift wall for reservoir

Progress Update : 15/03/2021
Ongoing
III
kimaimol
24.80748517734833,93.94173431396518
24.8147735,93.9439775
0.84141551987076
75984
C/O 0.6 ML CAPACITY OHT AT NORTH AOC

Progress Update : 15/03/2021
Ongoing
III
kimaimol
24.80748517734833,93.94173431396518
24.8144571,93.9441063
0.81132823688944
75984
C/O 0.6 ML CAPACITY OHT AT NORTH AOC

Progress Update : 14/03/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8115746,93.9593649
1.8365906008634
75984
Casting of 2nd base beam 0.8ML OHT Laiwangma shift II

Progress Update : 14/03/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.81513591,93.96465533
2.4647836257262
75984
Casting of 2nd base beam 0.8ML OHT Laiwangma shift II

Progress Update : 13/03/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7767287,93.9264909
3.7500161608234
75984
Chingtham leikai zone 0.8ml capacity overhead tank casting of first blessing

Progress Update : 13/03/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7774695,93.9264909
3.6750536273526
75984
Chingtham leikai zone 0.8ml capacity overhead tank casting of first blessing

Progress Update : 12/03/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81046906,93.88805404
5.4279963478099
75984
C/O SR at Iroisemba. Raft reinforcement

Progress Update : 12/03/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.823933,93.9341359
1.9830954846189
75984
C/O SR at Iroisemba. Raft reinforcement

Progress Update : 12/03/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8221517,93.9574728
2.2764764295255
75984
Casting of 3rd bracing beam of 0.8ML. Capacity OHT at khuman lampak

Progress Update : 12/03/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8219642,93.9573705
2.2543502616291
75984
Casting of 3rd bracing beam of 0.8ML. Capacity OHT at khuman lampak

Progress Update : 12/03/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8218963,93.9573612
2.2483067065554
75984
Casting of 3rd bracing beam of 0.8ML. Capacity OHT at khuman lampak

Progress Update : 10/03/2021
Active
III
Naresh55
24.80748517734833,93.94173431396518
24.7759286,93.9474591
3.5560301489509
75984
Construction of 0.8 ML capacity OHT at kongba irong (akampat) casting of bracing beam

Progress Update : 09/03/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8104618,93.888103
5.4230149879665
75984
C/O SR 2.5 ML at Iroisemba. Reinforcement floor slab

Progress Update : 09/03/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.7899416,93.8596449
8.5123313465169
75984
C/O SR 2.5 ML at Iroisemba. Reinforcement floor slab

Progress Update : 09/03/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81058427,93.88796797
5.4374612758472
75984
C/O SR 2.5 ML at Iroisemba. Reinforcement floor slab

Progress Update : 07/03/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.81524249,93.96460489
2.4641284919426
75984
Casting of column, 0.8ML OHT Laiwangma Shift II TV Tower

Progress Update : 07/03/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.81525899,93.96454825
2.4594185338638
75984
Casting of column, 0.8ML OHT Laiwangma Shift II TV Tower

Progress Update : 07/03/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.81536936,93.96439585
2.4493889441583
75984
Casting of column, 0.8ML OHT Laiwangma Shift II TV Tower

Progress Update : 06/03/2021
ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7763501,93.9268094
3.7755023525336
75984
Chingtham leikai zone 0.8ml capacity overhead tank. pile cap casting

Progress Update : 06/03/2021
ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77664915,93.9256764
3.7924889587483
75984
Chingtham leikai zone 0.8ml capacity overhead tank. pile cap casting

Progress Update : 06/03/2021
ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77673292,93.92567429
3.7841613068785
75984
chingtham leikai zone . 0.8ml overhead tank. pule cap casting

Progress Update : 06/03/2021
ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77673232,93.92564279
3.7855848224223
75984
chingtham leikai zone . 0.8ml overhead tank. pule cap casting

Progress Update : 06/03/2021
ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7770991,93.9264909
3.7124956593616
75984
chingtham leikai zone overhead tank 0.8 ml . pile cap casting

Progress Update : 06/03/2021
ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7770991,93.9264909
3.7124956593616
75984
chingtham leikai zone overhead tank 0.8 ml . pile cap casting

Progress Update : 06/03/2021
On going
Package one
herojit
24.80748517734833,93.94173431396518
24.8074812,93.9663038
2.4797811022881
75984
Casting of column for 0.80ml OHT at porompat

Progress Update : 06/03/2021
On going
Package one
herojit
24.80748517734833,93.94173431396518
24.8074636,93.9662725
2.4766233142232
75984
Casting of column for 0.80ml OHT at porompat

Progress Update : 06/03/2021
On going
Package one
herojit
24.80748517734833,93.94173431396518
24.8074812,93.9663038
2.4797811022881
75984
Casting of beam for 0.45ml OHT

Progress Update : 06/03/2021
ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
chingtham leikai zone 0.8ml overhead tank. pile cap...concreting

Progress Update : 06/03/2021
ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77660746,93.92576375
3.7929243894665
75984
chingtham leikai zone 0.8ml overhead tank. pile cap...concreting

Progress Update : 06/03/2021
ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7752306,93.9271279
3.877621112991
75984
chingtham leikai zone 0.8ml overhead tank. pile cap...concreting

Progress Update : 05/03/2021
Active
3
ben
24.80748517734833,93.94173431396518
24.82313465,93.99220743
5.3828955846857
75984
Pipe laying of 1000 mm dia Along the northern side of lamlong tinsid road

Progress Update : 04/03/2021
Active
III
Naresh55
24.80748517734833,93.94173431396518
24.7917802,93.9660628
3.0131962431746
75984
Construction of 0.8 ML capacity OHT at rahmania (Thambalkhong)_ casting of raft

Progress Update : 04/03/2021
ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
chingtham leikai zone 0.8ml overhead tank. preparation of shutering for pile cap

Progress Update : 04/03/2021
ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
chingtham leikai zone 0.8ml overhead tank. preparation of shutering for pile cap

Progress Update : 04/03/2021
ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
chingtham leikai zone 0.8ml overhead tank. preparation of shutering for pile cap

Progress Update : 04/03/2021
ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77662503,93.92566682
3.7953269414066
75984
chingtham leikai zone 0.8ml overhead tank. preparation of shutering for pile cap

Progress Update : 04/03/2021
ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77669483,93.92582586
3.7814662611987
75984
chingtham leikai zone 0.8ml overhead tank. preparation of shutering for pile cap

Progress Update : 04/03/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.7881746,93.8850998
6.1064612071671
75984
C/O 2.5 ML SR at Iroisemba. PCC casting

Progress Update : 04/03/2021
package 1
ongoing
eemaintiiphed
24.80748517734833,93.94173431396518
24.7918002,93.9663084
3.0321530144289
75984
raft casting of 0.8 ML OHT at Thambalkhong (Rahmania)

Progress Update : 04/03/2021
package 1
ongoing
eemaintiiphed
24.80748517734833,93.94173431396518
24.79186,93.9661738
3.0172153185124
75984
raft casting of 0.8 ML OHT at Thambalkhong (Rahmania)

Progress Update : 04/03/2021
package 1
ongoing
eemaintiiphed
24.80748517734833,93.94173431396518
24.79186,93.9661738
3.0172153185124
75984
raft casting of 0.8 ML OHT at Thambalkhong (Rahmania)

Progress Update : 03/03/2021
In progress
Phase III
pahten123
24.80748517734833,93.94173431396518
24.7500677,93.9275893
6.5419757408309
75984
Lab building , foundation work

Progress Update : 03/03/2021
ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7764372,93.9275614
3.7369103119543
75984
chingtham leikai zone 0.8ml overhead tank. pile cap reinforcement detail

Progress Update : 03/03/2021
ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
chingtham leikai zone 0.8ml overhead tank. pile cap reinforcement detail

Progress Update : 03/03/2021
ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
chingtham leikai zone 0.8ml overhead tank. pile cap reinforcement detail

Progress Update : 03/03/2021
ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77672193,93.92562028
3.7876036299499
75984
chingtham leikai zone 0.8ml overhead tank. pile cap reinforcement detail

Progress Update : 03/03/2021
ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
chingtham leikai zone 0.8ml overhead tank. pile cap reinforcement detail

Progress Update : 02/03/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank piles cap reinforcement

Progress Update : 02/03/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank piles cap reinforcement

Progress Update : 26/02/2021
Active
III
Naresh55
24.80748517734833,93.94173431396518
24.8228502,93.993282
5.4756892497885
75984
Laying of 1000mm dia pipe from chingkheiching to ghari

Progress Update : 26/02/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7774695,93.9264909
3.6750536273526
75984
Chingtham leikai zone 0.8ml capacity overhead tank cap reinforcement

Progress Update : 26/02/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.776898333333,93.925648333333
3.7686781798056
75984
Chingtham leikai zone 0.8ml capacity overhead tank cap reinforcement

Progress Update : 26/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8127606,93.9284012
1.4679588342133
75984
C/O OHT AT LALAMBUNG. CUBE CASTING

Progress Update : 26/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81286891,93.92850478
1.4632664102035
75984
C/O OHT AT LALAMBUNG. CUBE CASTING

Progress Update : 26/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8133619,93.9281599
1.5178721560333
75984
C/O OHT AT LALAMBUNG. PILE CASTING

Progress Update : 26/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81301353,93.92874779
1.4476748599895
75984
C/O OHT AT LALAMBUNG. PILE CASTING

Progress Update : 26/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8131112,93.9278167
1.5376598281852
75984
C/O OHT AT LALAMBUNG. PILE CASTING

Progress Update : 26/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81304598,93.92870712
1.4529238372002
75984
C/O OHT AT LALAMBUNG. PILE CASTING

Progress Update : 26/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81306701,93.92866543
1.4577264915598
75984
C/O OHT AT LALAMBUNG. PILE CASTING

Progress Update : 26/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8133437,93.928402
1.4949719842982
75984
C/O OHT AT LALAMBUNG. PILE CASTING

Progress Update : 26/02/2021
ONGOING
III
kimaimol
24.80748517734833,93.94173431396518
24.8151038,93.9438746
0.87421878887489
75984
C/O OF 0.6 ML OHT AT NORTH AOC

Progress Update : 26/02/2021
Active
III
Naresh55
24.80748517734833,93.94173431396518
24.7758651,93.9475483
3.5644684576545
75984
Construction of 0.45 ML capqcity OHT at akampat for kongba irong (casting of raft)

Progress Update : 26/02/2021
Active
III
Naresh55
24.80748517734833,93.94173431396518
24.7759604,93.9475831
3.5545988487105
75984
Construction of 0.45 ML capqcity OHT at akampat for kongba irong (casting of raft)

Progress Update : 25/02/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8115978,93.9589984
1.8014284184247
75984
Casting of base beam of 0.8 OHT at Tv Tower Laiwangma shift II

Progress Update : 25/02/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.81526623,93.96458704
2.4633666479286
75984
Casting of base beam of 0.8 OHT at Tv Tower Laiwangma shift II

Progress Update : 24/02/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7760213,93.9252168
3.8754509664839
75984
Chingtham leikai zone 0.8ml capacity overhead tank piles cap reinforcement

Progress Update : 24/02/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7774695,93.9264909
3.6750536273526
75984
Chingtham leikai zone 0.8ml capacity overhead tank piles cap reinforcement

Progress Update : 24/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8132204,93.9283623
1.4926717415454
75984
C/o OHT AT LALAMBUNG. PILE CASTING

Progress Update : 24/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81293952,93.92873834
1.445065917085
75984
C/o OHT AT LALAMBUNG. PILE CASTING

Progress Update : 24/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8133265,93.928263
1.5067861453789
75984
C/o OHT AT LALAMBUNG. PILE CASTING

Progress Update : 24/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81297352,93.92876067
1.444613341336
75984
C/o OHT AT LALAMBUNG. PILE CASTING

Progress Update : 24/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81296072,93.92876985
1.4431726845195
75984
C/o OHT AT LALAMBUNG. PILE CASTING

Progress Update : 24/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81293384,93.92877441
1.4414968800331
75984
C/o OHT AT LALAMBUNG. PILE CASTING

Progress Update : 24/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81286933,93.92879546
1.4365657867046
75984
C/o OHT AT LALAMBUNG. PILE CASTING

Progress Update : 24/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8129378,93.92871471
1.4471508496553
75984
C/o OHT AT LALAMBUNG. PILE CASTING

Progress Update : 23/02/2021
Active
III
Naresh55
24.80748517734833,93.94173431396518
24.7916575,93.9664632
3.0540645341793
75984
Construction of 0.45 ML capacity ESR at rahmania shift 2 B Thambalkhong_ casting of raft

Progress Update : 22/02/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8216929,93.9572793
2.2264134867971
75984
Casting of second lift column for 0.8ML Capacity OHT at khuman lampak

Progress Update : 22/02/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8218786,93.9573066
2.2430402093994
75984
Casting of second lift column for 0.8ML Capacity OHT at khuman lampak

Progress Update : 22/02/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8223267,93.9575449
2.2955069680446
75984
Casting of second lift column for 0.8ML Capacity OHT at khuman lampak

Progress Update : 22/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81297712,93.92897586
1.4251287758085
75984
C/O OHT at lalambung. Casting of 43rd pile

Progress Update : 22/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8134876,93.9284798
1.4949818161003
75984
C/O OHT at lalambung. Casting of 43rd pile

Progress Update : 22/02/2021
Active
III
Naresh55
24.80748517734833,93.94173431396518
24.7917833,93.9664562
3.0454457656799
75984
Construction of 0.8ML capacity OHT at rahmania shift II B (Thambalkhong)

Progress Update : 22/02/2021
Active
III
Naresh55
24.80748517734833,93.94173431396518
24.7916524,93.9663227
3.042813350538
75984
Construction of 0.45 ML capacity emergency service reservoir at rahmania shift II B (thambalkhong)

Progress Update : 20/02/2021
ONGOING
III
kimaimol
24.80748517734833,93.94173431396518
24.8132828,93.9431888
0.66113830382536
75984
C/O OF 0.6 ML CAPACITY OHT AT NORTH AOC. PILE CASTING

Progress Update : 20/02/2021
ONGOING
III
kimaimol
24.80748517734833,93.94173431396518
24.8150184,93.9440615
0.86992306737896
75984
C/O OF 0.6 ML CAPACITY OHT AT NORTH AOC. PILE CASTING

Progress Update : 20/02/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.811608,93.9589959
1.8014725634153
75984
Completed casting of pile cap of 0.8 OHT at TV Tower Laiwangma shift II

Progress Update : 20/02/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.81524228,93.96455032
2.4589619501655
75984
Completed casting of pile cap of 0.8 OHT at TV Tower Laiwangma shift II

Progress Update : 19/02/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.811608,93.9589959
1.8014725634153
75984
Casting of pile cap of 0.8 OHT at TV Tower Laiwangma shift II

Progress Update : 19/02/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.815287,93.96469603
2.4744773358614
75984
Casting of pile cap of 0.8 OHT at TV Tower Laiwangma shift II

Progress Update : 19/02/2021
Ongoing
III
RajendroN
24.80748517734833,93.94173431396518
24.7996113,93.917961
2.5542296382312
75984
C/O. OHT 0.80 ML capacity at aTera Bazar (Nepra Menjor Zone) - casting of pile cap

Progress Update : 19/02/2021
Ongoing
III
RajendroN
24.80748517734833,93.94173431396518
24.800293,93.9180602
2.5197484162419
75984
C/O. OHT 0.80 ML capacity at aTera Bazar (Nepra Menjor Zone) - casting of pile cap

Progress Update : 19/02/2021
Ongoing
III
RajendroN
24.80748517734833,93.94173431396518
24.8004861,93.9180914
2.5100208581291
75984
C/O. OHT 0.80 ML capacity at aTera Bazar (Nepra Menjor Zone) - casting of pile cap

Progress Update : 19/02/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8116077,93.9589968
1.8015519211268
75984
casting of pile cap of 0.8 OHT at TV Tower Laiwangma shift II

Progress Update : 19/02/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.81526765,93.96472865
2.4768085457745
75984
casting of pile cap of 0.8 OHT at TV Tower Laiwangma shift II

Progress Update : 19/02/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.81528724,93.9647085
2.475665399426
75984
Ready for casting of pile cap of 0.8 OHT at TV Tower Laiwangma shift II

Progress Update : 18/02/2021
Package
On going
herojit
24.80748517734833,93.94173431396518
24.807536,93.9663035
2.4797566735543
75984
Casting of 8nos column for 0.45ml oht of porompat

Progress Update : 18/02/2021
Package
On going
herojit
24.80748517734833,93.94173431396518
24.807536,93.9663035
2.4797566735543
75984
Casting of 8nos column for 0.45ml oht of porompat

Progress Update : 18/02/2021
Column casting
1
herojit
24.80748517734833,93.94173431396518
24.80750605,93.9666625
2.5159852230281
75984
Casting

Progress Update : 18/02/2021
Active
III
Naresh55
24.80748517734833,93.94173431396518
24.7988388,93.9525313
1.453225457974
75984
Construction of 5.45 ML capacity WTP(filter wall casting at ningthempukhri)

Progress Update : 18/02/2021
Column casting
1
herojit
24.80748517734833,93.94173431396518
24.80739037,93.96689355
2.5393269316491
75984
Coloumn formwork

Progress Update : 18/02/2021
Column casting
1
herojit
24.80748517734833,93.94173431396518
24.80738038,93.96686439
2.5363888172564
75984
Coloumn formwork

Progress Update : 18/02/2021
Column casting
1
herojit
24.80748517734833,93.94173431396518
24.80731711,93.96687148
2.5371471105424
75984
Coloumn formwork

Progress Update : 17/02/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8116073,93.958996
1.8014625258964
75984
Completed reinforcement of pile cap for 0.8ML OHT at TV tower Laiwangma shift II

Progress Update : 17/02/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.81520381,93.96458255
2.4605134751982
75984
Completed reinforcement of pile cap for 0.8ML OHT at TV tower Laiwangma shift II

Progress Update : 17/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8129744,93.9284258
1.475356767598
75984
C/o OHT at lalambung. Pile casting

Progress Update : 17/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81297481,93.92872506
1.4479321898889
75984
C/o OHT at lalambung. Pile casting

Progress Update : 17/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8129277,93.9283562
1.4796238106114
75984
C/o OHT at lalambung. Pile casting

Progress Update : 17/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81303791,93.92880997
1.4431530236824
75984
C/o OHT at lalambung. Pile casting

Progress Update : 17/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81305896,93.92877816
1.4470562943442
75984
C/o OHT at lalambung. Pile casting

Progress Update : 17/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81298683,93.92869725
1.4510407392201
75984
C/o OHT at lalambung. Pile casting

Progress Update : 17/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8129844,93.92878142
1.4432274724298
75984
C/o OHT at lalambung. Pile casting

Progress Update : 17/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8127626,93.9284873
1.4600863747122
75984
C/O OHT at Lalambung.pile casting

Progress Update : 17/02/2021
In progress
Phase III
pahten123
24.80748517734833,93.94173431396518
24.7482681,93.9268693
6.7531706837041
75984
Preparation for wall lift

Progress Update : 17/02/2021
ONGOING
III
kimaimol
24.80748517734833,93.94173431396518
24.8150049,93.9439455
0.86538505174951
75984
C/O 0.6 ML CAPACITY OHT AT NORTH AOC . PILE BORING

Progress Update : 17/02/2021
ONGOING
III
kimaimol
24.80748517734833,93.94173431396518
24.8146433,93.9443783
0.83945123258111
75984
C/O 0.6 ML CAPACITY OHT AT NORTH AOC . PILE BORING

Progress Update : 17/02/2021
ONGOING
III
kimaimol
24.80748517734833,93.94173431396518
24.8150236,93.9437516
0.86256651343719
75984
C/O 0.6 ML CAPACITY OHT AT NORTH AOC . PILE BORING

Progress Update : 16/02/2021
ONGOING
III
kimaimol
24.80748517734833,93.94173431396518
24.8144955,93.9441802
0.81762959833779
75984
C/O 0.6 ML CAPACITY OHT AT NORTH AOC. 44 NOS. PILE

Progress Update : 16/02/2021
ONGOING
III
kimaimol
24.80748517734833,93.94173431396518
24.8150328,93.9436695
0.86164465829667
75984
C/O 0.6 ML CAPACITY OHT AT NORTH AOC. 44 NOS. PILE

Progress Update : 16/02/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.776375,93.9258538
3.8125063234713
75984
Chingtham leikai zone 0.8ml capacity overhead tank piles cap reinforcement

Progress Update : 15/02/2021
Package
On going
herojit
24.80748517734833,93.94173431396518
24.808005,93.967076666667
2.5584335164468
75984
Casting of wall for 2ml resarvoir at porompat water supply plant

Progress Update : 15/02/2021
Package
On going
herojit
24.80748517734833,93.94173431396518
24.8071877,93.9653651
2.385270897761
75984
Casting of wall for 2ml resarvoir at porompat water supply plant

Progress Update : 15/02/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7752306,93.9271279
3.877621112991
75984
Chingtham leikai zone 0.8ml capacity overhead tank piles cap reinforcement

Progress Update : 15/02/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.776741666667,93.92573
3.7808763005317
75984
Chingtham leikai zone 0.8ml capacity overhead tank piles cap reinforcement

Progress Update : 14/02/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.811608,93.9589959
1.8014725634153
75984
Reinforcement work of raft for 0.8MLD at TV Tower Laiwangma Shift II

Progress Update : 14/02/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.81523236,93.96465695
2.46865783112
75984
Reinforcement work of raft for 0.8MLD at TV Tower Laiwangma Shift II

Progress Update : 13/02/2021
Package
Ongoing
herojit
24.80748517734833,93.94173431396518
24.806447,93.9653651
2.3878405122729
75984
Casting of wall for 2ml reservoir at porompat water supply plant

Progress Update : 13/02/2021
Package
Ongoing
herojit
24.80748517734833,93.94173431396518
24.807416666667,93.96671
2.5207907122341
75984
Casting of wall for 2ml reservoir at porompat water supply plant

Progress Update : 13/02/2021
Package
Ongoing
herojit
24.80748517734833,93.94173431396518
24.807473333333,93.966563333333
2.5059760073545
75984
Casting of wall for 2ml reservoir at porompat water supply plant

Progress Update : 13/02/2021
Package
Ongoing
herojit
24.80748517734833,93.94173431396518
24.8102092,93.9631338
2.1809455272035
75984
Casting of wall for 2ml reservoir at porompat water supply plant

Progress Update : 13/02/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.822066,93.9573801
2.2631229680108
75984
Ready for casting bracing beam of 0.8ML capacity OHT at khuman lampak

Progress Update : 13/02/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8220139,93.9573664
2.258010638915
75984
Ready for casting bracing beam of 0.8ML capacity OHT at khuman lampak

Progress Update : 13/02/2021
In progress
Phase ii
pahten123
24.80748517734833,93.94173431396518
24.749575,93.9250717
6.6551044631286
75984
2nd lift preparation

Progress Update : 13/02/2021
In progress
Phase ii
pahten123
24.80748517734833,93.94173431396518
24.7493283,93.925265
6.6767621663753
75984
2nd lift preparation

Progress Update : 13/02/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7774695,93.9264909
3.6750536273526
75984
Chingtham leikai zone 0.8ml capacity overhead tank piles PCC

Progress Update : 13/02/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7770991,93.9264909
3.7124956593616
75984
Chingtham leikai zone 0.8ml capacity overhead tank piles PCC

Progress Update : 13/02/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.776506666667,93.925738333333
3.8041604144646
75984
Chingtham leikai zone 0.8ml capacity overhead tank piles PCC

Progress Update : 13/02/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7756343,93.9258538
3.8873869302593
75984
Chingtham leikai zone 0.8ml capacity overhead tank piles PCC

Progress Update : 11/02/2021
ONGOING
III
kimaimol
24.80748517734833,93.94173431396518
24.8150042,93.943973
0.86602981411323
75984
C/O OF 0.6 ML OHT AT NORTH AOC. PILE CASTING

Progress Update : 10/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81297206,93.92871231
1.4489704252666
75984
C/o OHT at lalambung. 32nd pile casting

Progress Update : 10/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81301673,93.92867563
1.4544223280541
75984
C/o OHT at lalambung. 32nd pile casting

Progress Update : 10/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81303321,93.92866918
1.4557877065373
75984
C/o OHT at lalambung. 32nd pile casting

Progress Update : 10/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81308049,93.92868113
1.4569322248202
75984
C/o OHT at lalambung. 32nd pile casting

Progress Update : 10/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8131677,93.9283379
1.4924087084655
75984
C/O OHT at Lalambung.32nd pile reinforcement

Progress Update : 10/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81306835,93.92872818
1.4520622015335
75984
C/O OHT at Lalambung.32nd pile reinforcement

Progress Update : 10/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8131867,93.9283596
1.4913215776993
75984
C/O OHT at Lalambung.32nd pile reinforcement

Progress Update : 10/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8136223,93.931906
1.2039906828231
75984
C/O OHT at Lalambung.32nd pile reinforcement

Progress Update : 10/02/2021
Ongoing
III
RajendroN
24.80748517734833,93.94173431396518
24.7742199,93.9052329
5.2207970573248
75984
C/O. of OHT 0.8 ML capacity at Ghari 1 (casting of bracing beam)

Progress Update : 10/02/2021
Ongoing
III
RajendroN
24.80748517734833,93.94173431396518
24.7742482,93.9052222
5.2193305796792
75984
C/O. of OHT 0.8 ML capacity at Ghari 1 (casting of bracing beam)

Progress Update : 10/02/2021
ONGOING
III
kimaimol
24.80748517734833,93.94173431396518
24.8143852,93.9442103
0.80688190397584
75984
C/O OF 0.6 ML CAPACITY OHT AT NORTH AOC.

Progress Update : 09/02/2021
Active
Phase-III
Laksmee
24.80748517734833,93.94173431396518
24.81526454,93.96456499
2.4612170893448
75984
Reinforcement of raft 0.8MLD OHT laiwangma shift-ii, TV Tower.

Progress Update : 09/02/2021
package 2
ongoing
eemaintiiphed
24.80748517734833,93.94173431396518
24.8276971,93.9705934
3.678750055084
75984
0.6ML OHT at Sajor leikai 1

Progress Update : 09/02/2021
package 2
ongoing
eemaintiiphed
24.80748517734833,93.94173431396518
24.8277677,93.9705846
3.6828480495071
75984
0.6ML OHT at Sajor leikai 1

Progress Update : 08/02/2021
Package
On going
herojit
24.80748517734833,93.94173431396518
24.8075195,93.9663732
2.4867881001794
75984
Casting pile cap for 0.8ml oht at porompat

Progress Update : 08/02/2021
Package
On going
herojit
24.80748517734833,93.94173431396518
24.8072043,93.966357
2.4853495075157
75984
Pile cap steel binding for porompat 0.8ml OHT

Progress Update : 08/02/2021
Ongoing
III
kimaimol
24.80748517734833,93.94173431396518
24.8150105,93.9437416
0.86091310424036
75984
C/O OF 0.6 ML CAPACITY OHT AT NORTH AOC. casting of 36 nos. Pile

Progress Update : 07/02/2021
Active
III
Naresh55
24.80748517734833,93.94173431396518
24.7927278,93.9660026
2.9483257973843
75984
Construction of 0.8 ML capacity OHT at Rahmania (thambalkhong- laying of pcc )

Progress Update : 07/02/2021
Active
III
Naresh55
24.80748517734833,93.94173431396518
24.7993762,93.9522296
1.3910768944825
75984
Construction of 5.45 MLD capacity WTP at ningthempukhri (laying of rcc raft for filter house)

Progress Update : 06/02/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.81551069,93.96461076
2.4752748402212
75984
Casting of column for pump house of 0.2 MLD ESR at Laiwangma shift II T.V. Tower

Progress Update : 06/02/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.81547779,93.96451685
2.4651157088982
75984
Casting of column for pump house of 0.2 MLD ESR at Laiwangma shift II T.V. Tower

Progress Update : 06/02/2021
ONGOING
III
kimaimol
24.80748517734833,93.94173431396518
24.8144267,93.9443367
0.8152905048575
75984
C/O 0.6 ML CAPACITY OHT AT NORTH AOC. PILE CASTING

Progress Update : 06/02/2021
ONGOING
III
kimaimol
24.80748517734833,93.94173431396518
24.8150279,93.9439949
0.86915159548018
75984
C/O 0.6 ML CAPACITY OHT AT NORTH AOC. PILE CASTING

Progress Update : 04/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81311269,93.92856155
1.4693753489782
75984
C/O OHT at Lalambung. pile casting

Progress Update : 04/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8132009,93.9282739
1.4998234107398
75984
C/O OHT at Lalambung. pile casting

Progress Update : 04/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8130966,93.9281684
1.5046293979336
75984
C/O OHT at Lalambung. pile casting

Progress Update : 04/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81312289,93.92868027
1.4590297896658
75984
C/O OHT at Lalambung. pile casting

Progress Update : 04/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8129731,93.92870852
1.4493660670563
75984
C/O OHT at Lalambung. pile casting

Progress Update : 04/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8132028,93.9282787
1.4994741590733
75984
C/O OHT at Lalambung. pile casting

Progress Update : 04/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8132253,93.9282832
1.5001254238002
75984
C/O OHT at Lalambung. pile casting

Progress Update : 04/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8132253,93.9282832
1.5001254238002
75984
C/O OHT at Lalambung. pile casting

Progress Update : 04/02/2021
Package
On going
herojit
24.80748517734833,93.94173431396518
24.8069133,93.9662403
2.4741949472693
75984
Pile cap steel binding for porompat 0.8ml OHT

Progress Update : 03/02/2021
Pile cape reinforement
1
herojit
24.80748517734833,93.94173431396518
24.8090393,93.9653651
2.3912755705875
75984
Foundation beam

Progress Update : 03/02/2021
Pile cape reinforement
1
herojit
24.80748517734833,93.94173431396518
24.80764266,93.9666615
2.5159427725529
75984
Foundation beam

Progress Update : 03/02/2021
Ongoing
III
kimaimol
24.80748517734833,93.94173431396518
24.8150312,93.9437538
0.86344008981306
75984
C/O OF 0.6 ML OHT AT NORTH AOC. PILE CASTING

Progress Update : 03/02/2021
Ongoing
III
kimaimol
24.80748517734833,93.94173431396518
24.8149952,93.9438025
0.86072963695551
75984
C/O OF 0.6 ML OHT AT NORTH AOC. PILE CASTING

Progress Update : 03/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81328314,93.92873108
1.462168135915
75984
C/O OHT at Lalambung. Casting of 22nd pile

Progress Update : 03/02/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8140176,93.9309503
1.3084983875808
75984
C/O OHT at Lalambung. Casting of 22nd pile

Progress Update : 02/02/2021
Active
III
Naresh55
24.80748517734833,93.94173431396518
24.7927278,93.9660026
2.9483257973843
75984
Construction of 0.45 ML capacity ESR at Rahmania(Thambalkhong-laying of pcc)

Progress Update : 02/02/2021
Ongoing
phase 3 package I
BabliRK
24.80748517734833,93.94173431396518
24.8373224,93.9028696
5.1370600169914
75984
casting 3rd lift @langol 1

Progress Update : 02/02/2021
Ongoing
phase 3 package I
BabliRK
24.80748517734833,93.94173431396518
24.8373733,93.902865
5.141070422816
75984
casting 3rd lift @langol 1

Progress Update : 01/02/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.81550503,93.96469261
2.482755883863
75984
Laying of slab and beam for 0.2 MLD ESR at T.V. Tower Laiwangma Shift II

Progress Update : 01/02/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8155313,93.96459434
2.4745565481334
75984
Laying of slab and beam for 0.2 MLD ESR at T.V. Tower Laiwangma Shift II

Progress Update : 01/02/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.81542391,93.9646707
2.4774650061587
75984
Laying of slab and beam for 0.2 MLD ESR at TV Tower Laiwangma Shift II

Progress Update : 01/02/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.81549054,93.96465828
2.4789437594048
75984
Reinforcement work completed for laying of slab and beam for 0.2 MLD ESR at TV Tower Laiwangma Shift II

Progress Update : 01/02/2021
On going
Phase 1
herojit
24.80748517734833,93.94173431396518
24.8067189,93.9662067
2.47145750483
15090.8
Shutting works for 1lift of wall 2ml Glsr porompat

Progress Update : 01/02/2021
On going
Phase 1
herojit
24.80748517734833,93.94173431396518
24.806447,93.9653651
2.3878405122729
75984
Pile cap steel works for 0.8ml oht at porompat

Progress Update : 01/02/2021
On going
Phase 1
herojit
24.80748517734833,93.94173431396518
24.8074477,93.9663697
2.4864361322397
15090.8
Colunm steel works for 0.45ml oht porompat

Progress Update : 01/02/2021
Ongoing
III
RajendroN
24.80748517734833,93.94173431396518
24.774275,93.9050863
5.2269207900885
75984
C/O. of OHT 0.80 ML capacity at Ghari 1 (casting of column)

Progress Update : 01/02/2021
Ongoing
III
RajendroN
24.80748517734833,93.94173431396518
24.7743128,93.9050419
5.2271267952291
15090.8
C/O. of OHT 0.80 ML capacity at Ghari 1 (casting of column)

Progress Update : 01/02/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8220652,93.9572822
2.256176409418
15090.8
Column reinforcement for 0.8ML Capacity OHT at khuman lampak

Progress Update : 01/02/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8221069,93.9573531
2.2644851560338
75984
Column reinforcement for 0.8ML Capacity OHT at khuman lampak

Progress Update : 31/01/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81020089,93.88810198
5.4214302706166
75984
C/o SR 2.5 ML at Iroisemba

Progress Update : 31/01/2021
Active
III
Naresh55
24.80748517734833,93.94173431396518
24.7758997,93.9475828
3.5612494932878
15090.8
Construction of 0.45 ML capacity OHT at kongba irong(akampat-)

Progress Update : 30/01/2021
Active
III
Naresh55
24.80748517734833,93.94173431396518
24.7927278,93.9660026
2.9483257973843
15090.8
Construction of 0.45 ML capacity ESR at porompat shift-II B Rahmania( Thambalkhong- compaction of sand gravel with 9 ton vibrating roller )

Progress Update : 30/01/2021
Active
III
Naresh55
24.80748517734833,93.94173431396518
24.7927278,93.9660026
2.9483257973843
15090.8
Construction of 0.8 ML capacity OHT at porompat shift-II B (Rahmania/Thambalkhong)

Progress Update : 29/01/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.7906497,93.8603856
8.4217022874896
75984
C/o service reservoir 2.5 ML at Iroisemba

Progress Update : 29/01/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.809307,93.9127963
2.9276882933318
75984
C/o service reservoir 2.5 ML at Iroisemba

Progress Update : 29/01/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.809307,93.9127963
2.9276882933318
75984
C/o service reservoir 2.5 ML at Iroisemba

Progress Update : 28/01/2021
Active
III
Naresh55
24.80748517734833,93.94173431396518
24.7988794,93.952299
1.4327075712057
15090.8
Construction of 5.45MLD Capacity WTP at ningthempukhri (preparatiom for raft foundation of filter house)

Progress Update : 28/01/2021
III
ONGOING
kimaimol
24.80748517734833,93.94173431396518
24.814997,93.9439988
0.86594059429632
75984
C/o 0.6 ML CAPACITY OHT AT NORTH AOC. Pile casting

Progress Update : 28/01/2021
Work in progress
IWSP for Imphal Plannibg area Phase -III
pahten123
24.80748517734833,93.94173431396518
24.7496087,93.9248577
6.6569754286299
15090.8
RCC wall

Progress Update : 28/01/2021
Work in progress
IWSP for Imphal Plannibg area Phase -III
pahten123
24.80748517734833,93.94173431396518
24.749915,93.926055
6.5940036218258
75984
RCC wall

Progress Update : 28/01/2021
Ongoing
III
kimaimol
24.80748517734833,93.94173431396518
24.8146138,93.944159
0.82954526802607
75984
C/O of 0.6ML OHT AT NORTH AOC. PILE REINFORCEMENT

Progress Update : 28/01/2021
Ongoing
III
kimaimol
24.80748517734833,93.94173431396518
24.8144572,93.9442655
0.81622417096206
75984
C/O of 0.6ML OHT AT NORTH AOC. PILE REINFORCEMENT

Progress Update : 27/01/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8128139,93.9282386
1.4853707756418
15090.8
C/O OHT at lalambung.boring of 15th pile

Progress Update : 27/01/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81316918,93.92885806
1.4450904566602
75984
C/O OHT at lalambung.boring of 15th pile

Progress Update : 26/01/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778565,93.9258538
3.6636980002156
15090.8
Chingtham leikai zone 0.8ml capacity overhead tank dismantling of piles

Progress Update : 26/01/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank dismantling of piles

Progress Update : 25/01/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8131646,93.9282573
1.4996372105954
75984
C/o OHT at Lalambung. Casting of pile

Progress Update : 25/01/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.8127693,93.92870525
1.4402747684423
75984
C/o OHT at Lalambung. Casting of pile

Progress Update : 25/01/2021
Active
III
Naresh55
24.80748517734833,93.94173431396518
24.7743263,93.9475175
3.7328513226394
75984
Construction of 0.45 ML capacity OHT at akampat for kongba irong ( pile breaking)

Progress Update : 23/01/2021
Ongoing
III
kimaimol
24.80748517734833,93.94173431396518
24.815054,93.9438401
0.86799521998083
75984
C/o OHT AT North AOC

Progress Update : 23/01/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8150486,93.9621776
2.2280694591357
75984
Casting of third leaf 0.2MLD ESR at Laiwangma shift II TV Tower

Progress Update : 23/01/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8150486,93.9621776
2.2280694591357
15090.8
Casting of third leaf 0.2MLD ESR at Laiwangma shift II TV Tower

Progress Update : 23/01/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.8150486,93.9621776
2.2280694591357
75984
Shuttering work of 0.2MLD ESR at Laiwangma Shift II TV Tower

Progress Update : 22/01/2021
Ongoing
III
RajendroN
24.80748517734833,93.94173431396518
24.800278333333,93.917616666667
2.5627498186688
15090.8
C/O. of OHT 0.80 ML capacity at Nepra Menjor Zone (Tera Amudon Akham Leikai)

Progress Update : 22/01/2021
Ongoing
III
ulen
24.80748517734833,93.94173431396518
24.81303859,93.92864512
1.4582407596167
75984
C/O of OHT at lalambung

Progress Update : 22/01/2021
Ongoing
III
kimaimol
24.80748517734833,93.94173431396518
24.8144405,93.944258
0.81422370433371
75984
C/O OHT at North AOC

Progress Update : 22/01/2021
Ongoing
III
kimaimol
24.80748517734833,93.94173431396518
24.8143909,93.9441179
0.80464741004217
75984
C/O OHT at North AOC

Progress Update : 22/01/2021
Ongoing
III
kimaimol
24.80748517734833,93.94173431396518
24.8145234,93.9441262
0.81896452995748
75984
C/O OHT at North AOC

Progress Update : 22/01/2021
Ongoing
III
kimaimol
24.80748517734833,93.94173431396518
24.8145044,93.9444662
0.8277354286183
75984
C/O OHT at North AOC

Progress Update : 19/01/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7752306,93.9271279
3.877621112991
75984
Chingtham leikai zone 0.8ml capacity overhead tank dismantling of piles

Progress Update : 19/01/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank dismantling of piles

Progress Update : 18/01/2021
Active
Phase III
Laksmee
24.80748517734833,93.94173431396518
24.812001,93.9602741
1.9373712332816
75984
PCC of 0.8 MLD OHT at Laiwangma shift II TV Tower

Progress Update : 18/01/2021
construction
Raft
eemaintiiphed
24.80748517734833,93.94173431396518
24.8090393,93.9653651
2.3912755705875
75984
Raft of 2 ML GLSR at Porompat

Progress Update : 17/01/2021
Active
Phase-I
Laksmee
24.80748517734833,93.94173431396518
24.81535115,93.96470952
2.4782601854525
15090.8
Laying of PCC bed for 0.8MLD capacity OHT Laiwangma Shift II TV Tower

Progress Update : 17/01/2021
Active
Phase-I
Laksmee
24.80748517734833,93.94173431396518
24.81533949,93.96475603
2.4821964381094
75984
Laying of PCC bed for 0.8MLD capacity OHT Laiwangma Shift II TV Tower

Progress Update : 17/01/2021
Active
Phase-I
Laksmee
24.80748517734833,93.94173431396518
24.81534557,93.96470396
2.4775162583725
75984
Laying of PCC bed for 0.8MLD capacity OHT Laiwangma Shift II TV Tower

Progress Update : 17/01/2021
Active
PhaseI
Laksmee
24.80748517734833,93.94173431396518
24.81548641,93.96467687
2.4805302429089
75984
Casting of ESR wall 0.2MLD ESR laiwangma shift II tv tower

Progress Update : 17/01/2021
Construction
Raft
eemaintiiphed
24.80748517734833,93.94173431396518
24.8270668,93.9698279
3.5747883444794
15090.8
Raft steel for 0.2 ML ESR at Sajor leikai 1

Progress Update : 17/01/2021
Construction
Raft
eemaintiiphed
24.80748517734833,93.94173431396518
24.8293792,93.9700592
3.754676624155
75984
Raft steel for 0.2 ML ESR at Sajor leikai 1

Progress Update : 17/01/2021
Construction
Raft
eemaintiiphed
24.80748517734833,93.94173431396518
24.8276635,93.9706845
3.6837569146464
75984
Raft steel for 0.2 ML ESR at Sajor leikai 1

Progress Update : 17/01/2021
Construction
Raft
eemaintiiphed
24.80748517734833,93.94173431396518
24.8270668,93.9698279
3.5747883444794
15090.8
Raft steel for 0.2 ML ESR at Sajor leikai 1

Progress Update : 15/01/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank 81st piles

Progress Update : 15/01/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7782102,93.9264909
3.600424821013
75984
Chingtham leikai zone 0.8ml capacity overhead tank 81st piles

Progress Update : 12/01/2021
ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77653749,93.92575174
3.8004827352295
75984
chingtham leikai zone 0.8ml capacity overhead tank. 80th pile casting

Progress Update : 12/01/2021
ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
chingtham leikai zone 0.8ml capacity overhead tank. 80th pile casting

Progress Update : 11/01/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8218554,93.9572604
2.2379333558403
75984
Reinforcement for pile cap for 0.8ML Capacity OHT at Khuman lampak

Progress Update : 11/01/2021
Reinforcement
1
herojit
24.80748517734833,93.94173431396518
24.80787701,93.967407
2.5914883847784
75984
Reservoir 2.0ML

Progress Update : 11/01/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8 ml capacity overhead tank 79th piles

Progress Update : 07/01/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8199949,93.9581343
2.1620092529583
75984
Bottom reinforcement of 25 mm for pile cap of 0.8ML capacity OHT at Khuman lampak.

Progress Update : 07/01/2021
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8214429,93.9582735
2.2792036196152
75984
Bottom reinforcement of 25 mm for pile cap of 0.8ML capacity OHT at Khuman lampak.

Progress Update : 05/01/2021
Ongoing
phase 3 package 1
BabliRK
24.80748517734833,93.94173431396518
24.8283852,93.9338174
2.4573803093728
75984
glsr at cheiraoching 2+2 ML

Progress Update : 04/01/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7748602,93.9271279
3.9157444960685
75984
Chingtham leikai zone 0.8 ml capacity overhead tank 75th piles

Progress Update : 04/01/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7763584,93.9264909
3.7876026425404
75984
Chingtham leikai zone 0.8 ml capacity overhead tank 75th piles

Progress Update : 03/01/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8 ml capacity overhead tank 74th piles

Progress Update : 03/01/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8 ml capacity overhead tank 74th piles

Progress Update : 02/01/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778482,93.9261723
3.6505788486438
75984
Chingtham leikai zone 0.8 ml capacity overhead tank 73th piles

Progress Update : 02/01/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8 ml capacity overhead tank 73th piles

Progress Update : 02/01/2021
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.776738333333,93.925635
3.7853183940992
75984
Chingtham leikai zone 0.8 ml capacity overhead tank 73th piles

Progress Update : 02/01/2021
Active
2
Ton
24.80748517734833,93.94173431396518
24.7888346,93.9418763
2.0737993292544
75984
Construction of overhead tank 0.45 ML at New Thumbuthong Shift II

Progress Update : 02/01/2021
Active
2
Ton
24.80748517734833,93.94173431396518
24.789156666667,93.943178333333
2.0431449317772
75984
Construction of overhead tank 0.45 ML at New Thumbuthong Shift II

Progress Update : 01/01/2021
Ready foe casting
1
herojit
24.80748517734833,93.94173431396518
24.8090393,93.9653651
2.3912755705875
15090.8
Pile cap

Progress Update : 31/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.776635,93.925706666667
3.7926071591407
75984
Chingtham leikai zone 0.8 ml capacity overhead tank 72 th piles

Progress Update : 31/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8 ml capacity overhead tank 72 th piles

Progress Update : 30/12/2020
Pile cap
1
herojit
24.80748517734833,93.94173431396518
24.80743545,93.96662067
2.5117690800171
75984
Pile cap

Progress Update : 30/12/2020
Ongoing
phase 3 package 1
BabliRK
24.80748517734833,93.94173431396518
24.8373167,93.9028317
5.1395718142515
75984
casting at langol

Progress Update : 30/12/2020
Ongoing
phase 3 package 1
BabliRK
24.80748517734833,93.94173431396518
24.8358242,93.9041992
4.9272165858457
15090.8
casting at langol

Progress Update : 29/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778232,93.9271279
3.6126599129405
75984
Chingtham leikai zone 0.8ml capacity overhead tank 70th piles

Progress Update : 29/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.776013,93.9255353
3.8625643949928
75984
Chingtham leikai zone 0.8ml capacity overhead tank 70th piles

Progress Update : 29/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank 70th piles

Progress Update : 29/12/2020
Ongoing
package 1 phase 3
BabliRK
24.80748517734833,93.94173431396518
24.8358242,93.9041992
4.9272165858457
75984
glsr at langol hilltop 0.23ML

Progress Update : 28/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank 69th piles

Progress Update : 28/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7748602,93.9271279
3.9157444960685
75984
Chingtham leikai zone 0.8ml capacity overhead tank 69th piles

Progress Update : 25/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7748602,93.9271279
3.9157444960685
75984
Chingtham leikai zone 0.8ml capacity overhead tank 66th piles

Progress Update : 25/12/2020
Ongoing
III
RajendroN
24.80748517734833,93.94173431396518
24.774078333333,93.904861666667
5.2584196487003
15090.8
C/O. OHT 0.8 ML at Ghari - 1 (casting of pile cap)

Progress Update : 25/12/2020
Ongoing
III
RajendroN
24.80748517734833,93.94173431396518
24.773856666667,93.904921666667
5.2715901674913
75984
C/O. OHT 0.8 ML at Ghari - 1 (casting of pile cap)

Progress Update : 24/12/2020
Pile cape
1
herojit
24.80748517734833,93.94173431396518
24.8061019,93.9644088
2.2936953865018
75984
Reinforcement for pile cap

Progress Update : 23/12/2020
Ongoing
Phase 3 package I
BabliRK
24.80748517734833,93.94173431396518
24.8191844,93.9032441
4.0966247458121
75984
longol type 2 glsr 0.23 ML

Progress Update : 22/12/2020
Ongoing
phase III package I
BabliRK
24.80748517734833,93.94173431396518
24.829758,93.9368185
2.5257079908637
75984
cheiraoching glsr 4.0ML

Progress Update : 22/12/2020
Ongoing
phase III package I
BabliRK
24.80748517734833,93.94173431396518
24.8149868,93.936366
0.9946244929809
75984
cheiraoching glsr 4.0ML

Progress Update : 21/12/2020
Active
Phase I
Laksmee
24.80748517734833,93.94173431396518
24.8154974,93.9646643
2.4797846873536
75984
Casting of column 0.2ML capacity ESR at Laiwangma shift II TV Tower

Progress Update : 21/12/2020
Active
Phase I
Laksmee
24.80748517734833,93.94173431396518
24.8154858,93.9647144
2.4840420861368
75984
Casting of column 0.2ML capacity ESR at Laiwangma shift II TV Tower

Progress Update : 21/12/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.787251666667,93.912485
3.711844799543
75984
C/O. ESR 0.45 ML at Sangaiprou (casting of top slab)

Progress Update : 21/12/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.7881476,93.9127671
3.629338361503
75984
C/O. ESR 0.45 ML at Sangaiprou (casting of top slab)

Progress Update : 21/12/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.7880865,93.9128367
3.6277168652974
75984
C/O ESR 0.2 ML at Sangaiprou (ready for casting top slab)

Progress Update : 21/12/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.7892748,93.91407
3.4492059646244
75984
C/O ESR 0.2 ML at Sangaiprou (ready for casting top slab)

Progress Update : 21/12/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.7868992,93.9130927
3.6874461966757
75984
C/O ESR 0.2 ML at Sangaiprou (ready for casting top slab)

Progress Update : 21/12/2020
ongoing
construction
eemaintiiphed
24.80748517734833,93.94173431396518
24.8077186,93.9668195
2.5319609058154
75984
construction of 0.8 ML OHT at Porompat pile head breaking

Progress Update : 21/12/2020
ongoing
construction
eemaintiiphed
24.80748517734833,93.94173431396518
24.8077653,93.9668846
2.5385889740004
75984
construction of 0.8 ML OHT at Porompat pile head breaking

Progress Update : 21/12/2020
ongoing
construction
eemaintiiphed
24.80748517734833,93.94173431396518
24.8090477,93.9650463
2.3592532950605
75984
construction of 0.8 ML OHT at Porompat pile head breaking

Progress Update : 19/12/2020
Ongoing
phase 3 package 1
BabliRK
24.80748517734833,93.94173431396518
24.7953843,93.8927387
5.1251028088609
75984
langjing glsr casting

Progress Update : 19/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7782102,93.9264909
3.600424821013
75984
Chingtham leikai zone 0.8ml capacity overhead tank 62th piles

Progress Update : 19/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank 62th piles

Progress Update : 19/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778232,93.9271279
3.6126599129405
75984
Chingtham leikai zone 0.8ml capacity overhead tank 62th piles

Progress Update : 19/12/2020
Ongoing
phase 3 package 1
BabliRK
24.80748517734833,93.94173431396518
24.7953843,93.8927387
5.1251028088609
75984
glsr at langjing hilltop

Progress Update : 18/12/2020
Exacavating
1
herojit
24.80748517734833,93.94173431396518
24.80758862,93.96711576
2.5617563293641
75984
Excavation for 0.8 OHT

Progress Update : 18/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank 61th piles

Progress Update : 18/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank 61th piles

Progress Update : 18/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7774584,93.9251376
3.7354120996244
75984
Chingtham leikai zone 0.8ml capacity overhead tank 60th piles

Progress Update : 18/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7782102,93.9264909
3.600424821013
75984
Chingtham leikai zone 0.8ml capacity overhead tank 61th piles

Progress Update : 18/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7748602,93.9271279
3.9157444960685
75984
Chingtham leikai zone 0.8ml capacity overhead tank 60th piles

Progress Update : 18/12/2020
Shuttering work for pile cap (OHT)
1
herojit
24.80748517734833,93.94173431396518
24.80774475,93.96666568
2.5164681996523
75984
0.45 OHT

Progress Update : 18/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank 60th piles

Progress Update : 17/12/2020
Active
Phase I
Laksmee
24.80748517734833,93.94173431396518
24.81556907,93.96448909
2.4661828085307
75984
Placing of concrete for the raft foundation of 0.2ML capacity ESR at Tv tower Laiwangma shift II

Progress Update : 17/12/2020
Active
Phase I
Laksmee
24.80748517734833,93.94173431396518
24.81558549,93.96451318
2.4691122952149
75984
Placing of concrete for the raft foundation of 0.2ML capacity ESR at Tv tower Laiwangma shift II

Progress Update : 16/12/2020
Active
Phase I
Laksmee
24.80748517734833,93.94173431396518
24.81558951,93.96461676
2.479011228882
75984
Steel reinforcement for raft foundation of 0.2ML capacity ESR at laiwangma shift II

Progress Update : 16/12/2020
Active
Phase I
Laksmee
24.80748517734833,93.94173431396518
24.81549288,93.96468392
2.4814524272733
75984
Casting of 79th pile for 0.8ML OHT at laiwangma shift II

Progress Update : 16/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank 58th piles

Progress Update : 16/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank 58th piles

Progress Update : 15/12/2020
Ongoing
1
herojit
24.80748517734833,93.94173431396518
24.80752035,93.96673113
2.5229138172585
15090.8
Pcc works for 0.45 OHT porompat

Progress Update : 14/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7763584,93.9264909
3.7876026425404
75984
Chingtham leikai zone 0.8ml capacity overhead tank 57th piles

Progress Update : 14/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7763584,93.9264909
3.7876026425404
75984
Chingtham leikai zone 0.8ml capacity overhead tank 56th piles

Progress Update : 13/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7748602,93.9271279
3.9157444960685
75984
Chingtham leikai zone 0.8ml capacity overhead tank 55th piles

Progress Update : 13/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7782102,93.9264909
3.600424821013
75984
Chingtham leikai zone 0.8ml capacity overhead tank 55th piles

Progress Update : 13/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7748602,93.9271279
3.9157444960685
75984
Chingtham leikai zone 0.8ml capacity overhead tank 55th piles

Progress Update : 11/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7765439,93.92555137
3.8084687486699
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 54th pipe

Progress Update : 11/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 54th pipe

Progress Update : 11/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 54th pipe

Progress Update : 11/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77672524,93.92572352
3.7828071879963
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 54th pipe

Progress Update : 11/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7748602,93.9271279
3.9157444960685
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 54th pipe

Progress Update : 11/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 54th pipe

Progress Update : 11/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7777485,93.9263852
3.6514185449805
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 54th pipe

Progress Update : 11/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7777485,93.9263852
3.6514185449805
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 54th pipe

Progress Update : 11/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7777485,93.9263852
3.6514185449805
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 54th pile

Progress Update : 11/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77674673,93.92576197
3.7789893358391
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 54th pile

Progress Update : 11/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77675636,93.92579911
3.7764225638073
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 54th pile

Progress Update : 11/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank 53th piles

Progress Update : 11/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank 53th piles

Progress Update : 11/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank 53th piles

Progress Update : 10/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.776661666667,93.925626666667
3.7933798257184
75984
Chingtham leikai zone 0.8ml capacity overhead tank 52th piles

Progress Update : 10/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank 52th piles

Progress Update : 10/12/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.800083333333,93.917878333333
2.5446084426917
75984
C/O. ESR 0.2 ML capacity at Sangaiprou

Progress Update : 10/12/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.800083333333,93.917878333333
2.5446084426917
75984
C/O. ESR 0.2 ML capacity at Sangaiprou

Progress Update : 10/12/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.800083333333,93.917878333333
2.5446084426917
75984
C/O. OHT 0.8 ML capacity at Sangaiprou

Progress Update : 09/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank 51 piles

Progress Update : 09/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank 51 piles

Progress Update : 09/12/2020
Active
Phase-I
Laksmee
24.80748517734833,93.94173431396518
24.81535136,93.96473683
2.480847546094
75984
Placing of PCC for the foundation bed of 0.2 ML capacity ESR at laiwangma shift-II

Progress Update : 09/12/2020
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8221158,93.9573934
2.2680278572393
75984
77th pile boring for 0.8ML OHT at khuman lampak

Progress Update : 09/12/2020
Active
Phase-1
Laksmee
24.80748517734833,93.94173431396518
24.81556213,93.96472476
2.488068519927
75984
Laying of gravel for foundation bed of 0.2ML capacity ESR Laiwangma Shift II

Progress Update : 09/12/2020
Active
Phase I
Laksmee
24.80748517734833,93.94173431396518
24.815057,93.9618588
2.1986650787106
75984
Excavation almost completed fir 0.2MLD ESR at Laiwangma shift II

Progress Update : 08/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7748602,93.9271279
3.9157444960685
75984
Chingtham leikai zone 0.8ml capacity overhead tank 50th piles

Progress Update : 08/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7766,93.925831666667
3.7907670713102
75984
Chingtham leikai zone 0.8ml capacity overhead tank 50th piles

Progress Update : 08/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank 50th piles

Progress Update : 08/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank 49th piles

Progress Update : 06/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7763667,93.9261723
3.7999408144684
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 48th pile

Progress Update : 06/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7763667,93.9261723
3.7999408144684
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 48th pile

Progress Update : 06/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 48 th pile

Progress Update : 06/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77665752,93.9257547
3.7882755024356
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 48 th pile

Progress Update : 06/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77676284,93.92567267
3.781225548286
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 48 th pile

Progress Update : 06/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77674126,93.92583206
3.7765267943046
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 48 th pile

Progress Update : 06/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 47 th pile

Progress Update : 06/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7782102,93.9264909
3.600424821013
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 47 th pile

Progress Update : 06/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7782102,93.9264909
3.600424821013
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 47 th pile

Progress Update : 06/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 47 th pile

Progress Update : 06/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 47 th pile

Progress Update : 06/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 47 th pile

Progress Update : 06/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 47 th pile

Progress Update : 06/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 47 th pile

Progress Update : 05/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank 46th pile

Progress Update : 05/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank 46th pile

Progress Update : 05/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7748602,93.9271279
3.9157444960685
75984
Chingtham leikai zone 0.8ml capacity overhead tank 45th pile

Progress Update : 05/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7782102,93.9264909
3.600424821013
75984
Chingtham leikai zone 0.8ml capacity overhead tank 46th pile

Progress Update : 04/12/2020
Ongoing
II
eemaintiphed
24.80748517734833,93.94173431396518
24.77664306,93.92578727
3.7883322227815
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 45th pile casting

Progress Update : 04/12/2020
Ongoing
II
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 45th pile casting

Progress Update : 04/12/2020
Ongoing
II
eemaintiphed
24.80748517734833,93.94173431396518
24.7766825,93.92582312
3.7828249719475
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 45th pile casting

Progress Update : 04/12/2020
Ongoing
II
eemaintiphed
24.80748517734833,93.94173431396518
24.77662795,93.92558324
3.7986466580999
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 45th pile casting

Progress Update : 04/12/2020
Work in progress
Phase 1
pahten123
24.80748517734833,93.94173431396518
24.7591681,93.9175356
5.9016645887097
75984
Side walls casting in progress

Progress Update : 04/12/2020
Work in progress
Phase 1
pahten123
24.80748517734833,93.94173431396518
24.7591681,93.9175356
5.9016645887097
75984
Side walls casting in progress

Progress Update : 04/12/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.800083333333,93.917878333333
2.5446084426917
75984
OHT at Tera (Nepra Menjor Zone)

Progress Update : 04/12/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.800083333333,93.917878333333
2.5446084426917
75984
C/O OHT 0.8 ML capacity at Tera Bazar (Nepra Menjor Zone)

Progress Update : 04/12/2020
Ongoing
III
RajendroN
24.80748517734833,93.94173431396518
24.7742481,93.905137
5.2254151240989
15090.8
C/O. OHT 0.8 ML capacity at Ghari 1 (pile cap)

Progress Update : 03/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai 0.8ml capacity overhead tank 44th pile

Progress Update : 03/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77657199,93.92569655
3.7993801351771
75984
Chingtham leikai zone 0.8ml capacity overhead tank . 44th pile casting

Progress Update : 03/12/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77665294,93.92583939
3.7851046622437
75984
Chingtham leikai zone 0.8ml capacity overhead tank . 44th pile casting

Progress Update : 03/12/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.7742585,93.9051077
5.2266889587571
75984
C/O. OHT 0.8 ML capacity at Ghari 1 (ready for casting of PCC for pile cap)

Progress Update : 03/12/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.7742641,93.9050939
5.2272343405606
75984
C/O. OHT 0.8 ML capacity at Ghari 1 (ready for casting of PCC for pile cap)

Progress Update : 03/12/2020
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8273388,93.9375711
2.2471444216623
75984
Levelling of underground for 4.0ML GSLR at Cheiraoching

Progress Update : 03/12/2020
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8274908,93.9373846
2.2673181417496
75984
Levelling of underground for 4.0ML GSLR at Cheiraoching

Progress Update : 01/12/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.7896452,93.91407
3.4251880382273
75984
C/O. OHT 0.8 ML at Sangaiprou

Progress Update : 01/12/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.7867103,93.9126992
3.7316351047879
75984
C/O. ESR 0.45 ML at Sangaiprou

Progress Update : 01/12/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.7867164,93.9130625
3.7024812550024
75984
C/O. ESR 0.45 ML at Sangaiprou

Progress Update : 01/12/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.8005097,93.9182275
2.496147752034
75984
C/O. OHT 0.8 ML at Tera Amudon Akham Leikai (Nepra Menjor Zone) - boring of pile

Progress Update : 01/12/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.8003824,93.9182407
2.4993190744026
75984
C/O. OHT 0.8 ML at Tera Amudon Akham Leikai (Nepra Menjor Zone) - boring of pile

Progress Update : 30/11/2020
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8220088,93.9574263
2.2618336764746
75984
69th pile reinforcement for 0.8MLD OHT at khuman lampak

Progress Update : 30/11/2020
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8220069,93.9574607
2.2641152318774
75984
69th pile reinforcement for 0.8MLD OHT at khuman lampak

Progress Update : 27/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77658645,93.92566511
3.7992794622372
75984
Chingtham leikai zone 0.8ml capacity overhead tank 39th pile

Progress Update : 27/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778482,93.9261723
3.6505788486438
75984
Chingtham leikai zone 0.8ml capacity overhead tank 39th pile

Progress Update : 27/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77661015,93.92567099
3.7966430829942
75984
Chingtham leikai zone 0.8ml capacity overhead tank 39th pile

Progress Update : 27/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7759797,93.9268094
3.8133023341351
75984
Chingtham leikai zone 0.8ml capacity overhead tank 39th pile

Progress Update : 26/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77662621,93.92564538
3.7961336905306
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 37th pile

Progress Update : 26/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 37th pile

Progress Update : 26/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7752306,93.9271279
3.877621112991
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 37th pile

Progress Update : 26/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7752306,93.9271279
3.877621112991
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 37th pile

Progress Update : 26/11/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.774005,93.904878333333
5.2629940305544
75984
C/O. OHT 0.8 ML at Ghari 1

Progress Update : 26/11/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.786933333333,93.912576666667
3.7260945120567
75984
C/O. OHT 0.8 ML at Ghari 1

Progress Update : 23/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77654808,93.92566609
3.8030957898464
75984
Chingtham leikai zone 0.8ml capacity overhead tank 34th pile

Progress Update : 23/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77656646,93.92565858
3.8015708763205
75984
Chingtham leikai zone 0.8ml capacity overhead tank 34th pile

Progress Update : 23/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77657403,93.92570126
3.7989723592523
75984
Chingtham leikai zone 0.8ml capacity overhead tank 34th pile

Progress Update : 23/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7752306,93.9271279
3.877621112991
75984
Chingtham leikai zone 0.8ml capacity overhead tank 34th pile

Progress Update : 23/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7752306,93.9271279
3.877621112991
75984
Chingtham leikai zone 0.8ml capacity overhead tank 34th pile

Progress Update : 23/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7752306,93.9271279
3.877621112991
75984
Chingtham leikai zone 0.8ml capacity overhead tank 34th pile

Progress Update : 23/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank 34th pile

Progress Update : 23/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank 34th pile

Progress Update : 23/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank 34th pile

Progress Update : 23/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank 34th pile

Progress Update : 23/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank 34th pile

Progress Update : 23/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank 34th pile

Progress Update : 23/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank 34th pile

Progress Update : 23/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77654121,93.92573628
3.8007710109549
75984
Chingtham leikai zone 0.8ml capacity overhead tank 34th pile

Progress Update : 23/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7767121,93.9271279
3.7257894735568
75984
Chingtham leikai zone 0.8ml capacity overhead tank 34th pile

Progress Update : 23/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77663891,93.92580778
3.7878707932791
75984
Chingtham leikai zone 0.8ml capacity overhead tank 34th pile

Progress Update : 23/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77664461,93.92581001
3.787201376081
75984
Chingtham leikai zone 0.8ml capacity overhead tank 34th pile

Progress Update : 23/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 34th pile

Progress Update : 23/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77666375,93.92578228
3.7864639666646
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 34th pile

Progress Update : 23/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77669735,93.92552561
3.794183091195
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 34th pile

Progress Update : 22/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77655506,93.92569167
3.8012930960418
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 32nd pile

Progress Update : 22/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77656186,93.92568522
3.8008864998228
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 32nd pile

Progress Update : 22/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7769535,93.9256173
3.7644962498009
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 32nd pile

Progress Update : 22/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7769535,93.9256173
3.7644962498009
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 32nd pile

Progress Update : 22/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77656802,93.92576395
3.7968858873887
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 32nd pile

Progress Update : 22/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 32nd pile

Progress Update : 22/11/2020
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8221153,93.9572268
2.2563040895729
75984
Reinforcement for 65th pile for o.8MLD OHT at khuman lampak

Progress Update : 22/11/2020
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8221002,93.957154
2.250006068256
75984
Reinforcement for 65th pile for o.8MLD OHT at khuman lampak

Progress Update : 21/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77658995,93.92571368
3.7968367690269
75984
Chingtham leikai zone 0.8 ml capacity overhead tank. 30th pile

Progress Update : 21/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8 ml capacity overhead tank. 30th pile

Progress Update : 19/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7771074,93.9261723
3.7251029306904
75984
Chingtham leikai zone 0.8mp capacity overhead tank. Pile 27th no.

Progress Update : 19/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77659328,93.92582891
3.7915618180182
75984
Chingtham leikai zone 0.8mp capacity overhead tank. Pile 27th no.

Progress Update : 19/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8mp capacity overhead tank. Pile 27th no.

Progress Update : 19/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77672467,93.92584709
3.7775523037511
75984
Chingtham leikai zone 0.8mp capacity overhead tank. Pile 27th no.

Progress Update : 19/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7752306,93.9271279
3.877621112991
75984
Chingtham leikai zone 0.8mp capacity overhead tank. Pile 27th no.

Progress Update : 19/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77657784,93.92576926
3.7956697062364
75984
Chingtham leikai zone 0.8mp capacity overhead tank. Pile 27th no.

Progress Update : 19/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77661965,93.92577443
3.7912392917843
75984
Chingtham leikai zone 0.8mp capacity overhead tank. Pile 27th no.

Progress Update : 19/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7771074,93.9261723
3.7251029306904
75984
Chingtham leikai zone 0.8mp capacity overhead tank. Pile 27th no.

Progress Update : 19/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77665144,93.9257322
3.7898546707747
75984
Chingtham leikai zone 0.8mp capacity overhead tank. Pile 27th no.

Progress Update : 19/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77665291,93.925738
3.7894573039252
75984
Chingtham leikai zone 0.8mp capacity overhead tank. Pile 27th no.

Progress Update : 19/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7771074,93.9261723
3.7251029306904
75984
Chingtham leikai zone 0.8mp capacity overhead tank. Pile 27th no.

Progress Update : 18/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.8124541,93.9902344
4.9260625884252
75984
Chingtham leikai zone 0.8ml capacity overhead tank. Cube test

Progress Update : 18/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.8124541,93.9902344
4.9260625884252
75984
Chingtham leikai zone 0.8ml capacity overhead tank. Cube test

Progress Update : 17/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7771074,93.9261723
3.7251029306904
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 27 th pile fasting

Progress Update : 17/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7771074,93.9261723
3.7251029306904
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 27 th pile fasting

Progress Update : 17/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 27 th pile fasting

Progress Update : 17/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7763584,93.9264909
3.7876026425404
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 27 th pile fasting

Progress Update : 17/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.776375,93.9258538
3.8125063234713
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 27 th pile fasting

Progress Update : 17/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7771074,93.9261723
3.7251029306904
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 27 pile casting

Progress Update : 17/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7771074,93.9261723
3.7251029306904
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 27 pile casting

Progress Update : 17/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 27 pile casting

Progress Update : 17/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778232,93.9271279
3.6126599129405
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 27 pile casting

Progress Update : 15/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7761138,93.9263374
3.8187507542379
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 24th pile casting

Progress Update : 15/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7756176,93.9264909
3.8630154106493
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 24th pile casting

Progress Update : 15/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77664498,93.92579713
3.787716135844
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 24th pile casting

Progress Update : 15/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7782102,93.9264909
3.600424821013
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 24th pile casting

Progress Update : 15/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77660402,93.92577611
3.7927405627735
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 24th pile casting

Progress Update : 15/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77663299,93.92579018
3.7892210763317
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 24th pile casting

Progress Update : 15/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7761185,93.9263355
3.8183514677435
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 24th pile casting

Progress Update : 15/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7761165,93.9263363
3.8185217220894
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 24th pile casting

Progress Update : 15/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7761165,93.9263363
3.8185217220894
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 24th pile casting

Progress Update : 15/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7761165,93.9263363
3.8185217220894
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 24th pile casting

Progress Update : 15/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77668606,93.92584441
3.7815545539117
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 24th pile casting

Progress Update : 13/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77642877,93.92577309
3.8105200539297
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 22nd pile casting

Progress Update : 13/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7782102,93.9264909
3.600424821013
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 22nd pile casting

Progress Update : 13/11/2020
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8124626,93.9899155
4.8941879045918
75984
28 days cube testing for pile for 0.8 MLD OHT at khuman lampak

Progress Update : 13/11/2020
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8077247,93.9870454
4.5732893053818
75984
28 days cube testing for pile for 0.8 MLD OHT at khuman lampak

Progress Update : 13/11/2020
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8077755,93.9851321
4.3802219703791
75984
28 days cube testing for pile for 0.8 MLD OHT at khuman lampak

Progress Update : 13/11/2020
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.7962206,93.9739724
3.486650229281
75984
28 days cube testing for pile for 0.8 MLD OHT at khuman lampak

Progress Update : 13/11/2020
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.7962206,93.9739724
3.486650229281
75984
28 days cube testing for pile for 0.8 MLD OHT at khuman lampak

Progress Update : 13/11/2020
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.7962206,93.9739724
3.486650229281
75984
28 days cube testing for pile for 0.8 MLD OHT at khuman lampak

Progress Update : 13/11/2020
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.7962206,93.9739724
3.486650229281
75984
28 days cube testing for pile for 0.8 MLD OHT at khuman lampak

Progress Update : 13/11/2020
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8124626,93.9899155
4.8941879045918
75984
7 days cube testing for pile for 0.8 MLD OHT at khuman lampak

Progress Update : 13/11/2020
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.7962206,93.9739724
3.486650229281
75984
7 days cube testing for pile for 0.8 MLD OHT at khuman lampak

Progress Update : 13/11/2020
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.7962206,93.9739724
3.486650229281
75984
7 days cube testing for pile for 0.8 MLD OHT at khuman lampak

Progress Update : 13/11/2020
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.7962206,93.9739724
3.486650229281
75984
7 days cube testing for pile for 0.8 MLD OHT at khuman lampak

Progress Update : 13/11/2020
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.7962206,93.9739724
3.486650229281
75984
7 days cube testing for pile for 0.8 MLD OHT at khuman lampak

Progress Update : 13/11/2020
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.7962206,93.9739724
3.486650229281
75984
7 days cube testing for pile for 0.8 MLD OHT at khuman lampak

Progress Update : 13/11/2020
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.7962206,93.9739724
3.486650229281
75984
7 days cube testing for pile for 0.8 MLD OHT at khuman lampak

Progress Update : 13/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778075,93.9263401
3.6474162758015
75984
Chingtham leikai zone 0.8ml capacity overhead tank. Casting 21st pile.

Progress Update : 12/11/2020
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8219417,93.9574159
2.2557767244019
75984
Boring of 59th pile for 0.8MLD OHT at khuman lampak

Progress Update : 12/11/2020
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8196857,93.954847
1.8951631599272
75984
Boring of 59th pile for 0.8MLD OHT at khuman lampak

Progress Update : 10/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank. Casting of 18th pile

Progress Update : 10/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77660549,93.92578273
3.7923088097353
75984
Chingtham leikai zone 0.8ml capacity overhead tank. Casting of 18th pile

Progress Update : 10/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77659984,93.92578504
3.7927786332783
75984
Chingtham leikai zone 0.8ml capacity overhead tank. Casting of 18th pile

Progress Update : 10/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7752473,93.9264909
3.9008170947898
75984
Chingtham leikai zone 0.8ml capacity overhead tank. Casting of 18th pile

Progress Update : 10/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7752473,93.9264909
3.9008170947898
75984
Chingtham leikai zone 0.8ml capacity overhead tank. Casting of 18th pile

Progress Update : 10/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7752473,93.9264909
3.9008170947898
75984
Chingtham leikai zone 0.8ml capacity overhead tank. Casting of 18th pile

Progress Update : 10/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank. Casting of 18th pile

Progress Update : 10/11/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.787136666667,93.912461666667
3.7214795632434
75984
C/O. OHT 0.8 ML at Sangaiprou ( reinforcement of 98th pile)

Progress Update : 10/11/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.787136666667,93.912461666667
3.7214795632434
75984
C/O. OHT 0.8 ML at Sangaiprou ( reinforcement of 98th pile)

Progress Update : 10/11/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.787136666667,93.912461666667
3.7214795632434
75984
C/O. Emergency Service Reservoir 0.45 ML at Sangaiprou (casting of wall)

Progress Update : 10/11/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.787136666667,93.912461666667
3.7214795632434
75984
C/O. Emergency Service Reservoir 0.45 ML at Sangaiprou (casting of wall)

Progress Update : 10/11/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.7874313,93.9137516
3.5985763705462
75984
C/O. Emergency Service Reservoir 0.45 ML at Sangaiprou (casting of wall)

Progress Update : 09/11/2020
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8208302,93.9535723
1.9050292111794
75984
Reinforcement steel for 57th pile for 0.8 MLD OHT at khuman lampak

Progress Update : 09/11/2020
Ongoing
Package lll
Roni
24.80748517734833,93.94173431396518
24.8217984,93.9589903
2.3591848301244
75984
Reinforcement steel for 57th pile for 0.8 MLD OHT at khuman lampak

Progress Update : 08/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 17tth pile casting

Progress Update : 08/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 17tth pile casting

Progress Update : 08/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7770441,93.9261127
3.7340227891943
75984
Chingtham leikai zone 0.8ml capacity overhead tank. 17tth pile casting

Progress Update : 08/11/2020
Ongoing
III
RajendroN
24.80748517734833,93.94173431396518
24.7849216,93.9105673
4.0238364127949
75984
C/O. Emergency , Service Reservoir 0.45 ML at Sangaiprou

Progress Update : 08/11/2020
Ongoing
iII
RajendroN
24.80748517734833,93.94173431396518
24.7878928,93.9102488
3.8530249425139
75984
C/O. of OHT 0.8 ML capacity at Sangaiprou (95th pile)

Progress Update : 08/11/2020
Ongoing
III
RajendroN
24.80748517734833,93.94173431396518
24.8003139,93.9182684
2.4990869959069
75984
C/O. OHT 0.80 ML capacity at Tera (Nepra Menjor Zone)

Progress Update : 06/11/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.774056666667,93.90463
5.2766949626695
75984
C/O. OHT 0.80 ML capacity at Ghari 1

Progress Update : 06/11/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.77397,93.9047
5.2784815388903
75984
C/O. OHT 0.80 ML capacity at Ghari 1

Progress Update : 06/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8 ml capacity overhead tank. Casting of 16th pile. Cube test

Progress Update : 06/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone 0.8 ml capacity overhead tank. Casting of 16th pile. Cube test

Progress Update : 06/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone. 0.8ml capacity overhead tank. Pile casting 16th pile

Progress Update : 06/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone. 0.8ml capacity overhead tank. Pile casting 16th pile

Progress Update : 06/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7741741,93.9268627
3.9965004326965
75984
Chingtham leikai zone. 0.8ml capacity overhead tank. Pile casting 16th pile

Progress Update : 06/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77664048,93.92575192
3.7901094123241
75984
Chingtham leikai zone. 0.8ml capacity overhead tank. Pile casting 16th pile

Progress Update : 06/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778482,93.9261723
3.6505788486438
75984
Chingtham leikai zone. 0.8ml capacity overhead tank. Pile casting 16th pile

Progress Update : 06/11/2020
Ongoing
Package III
Roni
24.80748517734833,93.94173431396518
24.8077493,93.987181
4.586991315302
75984
Cube testing for pile for 0.8MLD OHT at khuman lampak

Progress Update : 06/11/2020
Ongoing
Package III
Roni
24.80748517734833,93.94173431396518
24.8077493,93.987181
4.586991315302
75984
Cube testing for pile for 0.8MLD OHT at khuman lampak

Progress Update : 06/11/2020
Ongoing
Package III
Roni
24.80748517734833,93.94173431396518
24.8020248,93.980505
3.9600034488147
75984
Cube testing for pile for 0.8MLD OHT at khuman lampak

Progress Update : 06/11/2020
Ongoing
Package III
Roni
24.80748517734833,93.94173431396518
24.7962206,93.9739724
3.486650229281
75984
Cube testing for pile for 0.8MLD OHT at khuman lampak

Progress Update : 06/11/2020
Ongoing
Package III
Roni
24.80748517734833,93.94173431396518
24.8124626,93.9899155
4.8941879045918
75984
Cube testing for pile for 0.8MLD OHT at khuman lampak

Progress Update : 06/11/2020
Ongoing
Package III
Roni
24.80748517734833,93.94173431396518
24.8199765,93.9580551
2.1545767688801
75984
Casting for 56th pile for 0.8MLD OHT at khuman lampak

Progress Update : 06/11/2020
Ongoing
Package III
Roni
24.80748517734833,93.94173431396518
24.8220526,93.9573251
2.2581846960671
75984
Casting for 56th pile for 0.8MLD OHT at khuman lampak

Progress Update : 06/11/2020
Ongoing
Package III
Roni
24.80748517734833,93.94173431396518
24.8220531,93.9574178
2.2647532606889
75984
Reinforcement for 56th pile for 0.8MLD OHT at khuman lampak

Progress Update : 06/11/2020
Ongoing
Package III
Roni
24.80748517734833,93.94173431396518
24.8219943,93.9573214
2.2532791195305
75984
Reinforcement for 56th pile for 0.8MLD OHT at khuman lampak

Progress Update : 06/11/2020
Ongoing
Package III
Roni
24.80748517734833,93.94173431396518
24.8220285,93.9573206
2.2559468134022
75984
Reinforcement for 56th pile for 0.8MLD OHT at khuman lampak

Progress Update : 06/11/2020
Ongoing
Package III
Roni
24.80748517734833,93.94173431396518
24.8201475,93.9583457
2.1892584063647
75984
Reinforcement for 56th pile for 0.8MLD OHT at khuman lampak

Progress Update : 06/11/2020
Ongoing
Package 1
Gunabanta
24.80748517734833,93.94173431396518
24.7953761,93.893057
5.0943503804597
75984
Langjing glsr

Progress Update : 06/11/2020
Ongoing
package 1
BabliRK
24.80748517734833,93.94173431396518
24.7960717,93.891152
5.260832834089
75984
langjing 2.75 glsr slupm test

Progress Update : 06/11/2020
Ongoing
package 1
BabliRK
24.80748517734833,93.94173431396518
24.7957959,93.8911472
5.268789420392
75984
langjing 2.75 glsr

Progress Update : 06/11/2020
Ongoing
package 1
BabliRK
24.80748517734833,93.94173431396518
24.8107395,93.9370614
0.5944457972758
75984
langjing 2.75 glsr

Progress Update : 06/11/2020
Ongoing
package 1
BabliRK
24.80748517734833,93.94173431396518
24.7957959,93.8911472
5.268789420392
75984
langjing 2.75 glsr

Progress Update : 06/11/2020
Ongoing
package 1
BabliRK
24.80748517734833,93.94173431396518
24.79615,93.8911133
5.2625302728795
75984
langjing 2.75 glsr

Progress Update : 06/11/2020
Ongoing
package 1
BabliRK
24.80748517734833,93.94173431396518
24.7957959,93.8911472
5.268789420392
75984
langjing 2.75 glsr

Progress Update : 05/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.8124457,93.9905534
4.9579527396291
75984
Chingtham leikai zone.0.8ml capacity overhead tank. Cube test for pile casting.

Progress Update : 05/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.8124457,93.9905534
4.9579527396291
75984
Chingtham leikai zone.0.8ml capacity overhead tank. Cube test for pile casting.

Progress Update : 05/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.8124457,93.9905534
4.9579527396291
75984
Chingtham leikai zone.0.8ml capacity overhead tank. Cube test for pile casting.

Progress Update : 05/11/2020
Ongoing
Package III
eemaintiphed
24.80748517734833,93.94173431396518
24.8214365,93.9586715
2.3083044689259
75984
Casting for 55th pile for 0.8MLD OHT at khuman lampak

Progress Update : 05/11/2020
Ongoing
Package III
eemaintiphed
24.80748517734833,93.94173431396518
24.8210948,93.9586417
2.2806959624279
75984
Casting for 55th pile for 0.8MLD OHT at khuman lampak

Progress Update : 05/11/2020
Ongoing
Package III
eemaintiphed
24.80748517734833,93.94173431396518
24.8211045,93.958539
2.2736697879015
75984
Casting for 55th pile for 0.8MLD OHT at khuman lampak

Progress Update : 05/11/2020
Ongoing
Package III
eemaintiphed
24.80748517734833,93.94173431396518
24.8199846,93.9580918
2.1579896024205
75984
Casting for 55th pile for 0.8MLD OHT at khuman lampak

Progress Update : 05/11/2020
Ongoing
Package III
eemaintiphed
24.80748517734833,93.94173431396518
24.8214365,93.9586715
2.3083044689259
75984
Reinforcement for 55th pile for 0.8MLD OHT at khuman lampak

Progress Update : 05/11/2020
Ongoing
Package III
eemaintiphed
24.80748517734833,93.94173431396518
24.8214365,93.9586715
2.3083044689259
75984
Reinforcement for 55th pile for 0.8MLD OHT at khuman lampak

Progress Update : 04/11/2020
Ongoing
package 1
BabliRK
24.80748517734833,93.94173431396518
24.7972952,93.891559
5.1895616301415
75984
langjing glsr

Progress Update : 04/11/2020
In progress
Phase 1
pahten123
24.80748517734833,93.94173431396518
24.75657,93.9325431
5.7367687955501
75984
Canchipur ground reservoir 1.5 MLD stone piling in progress

Progress Update : 04/11/2020
In progress
Phase 1
pahten123
24.80748517734833,93.94173431396518
24.757552,93.9233057
5.8554411756623
75984
Canchipur ground reservoir 1.5 MLD stone piling in progress

Progress Update : 03/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77680543,93.92559087
3.7804995798368
75984
Chingtham leikai zone 15th pile casting putting tremie pipe

Progress Update : 03/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77672566,93.92576026
3.781181976306
75984
Chingtham leikai zone 15th pile casting putting tremie pipe

Progress Update : 03/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77662739,93.92576819
3.7907279963851
75984
Chingtham leikai zone pile reinforcement...lapping 15th pile. Overhead tank 0.8ml capacity

Progress Update : 03/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone pile reinforcement...lapping 15th pile. Overhead tank 0.8ml capacity

Progress Update : 03/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77660017,93.92577847
3.7930269678618
75984
Chingtham leikai zone pile reinforcement...lapping 15th pile. Overhead tank 0.8ml capacity

Progress Update : 03/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77660253,93.92578972
3.7923072936252
75984
Chingtham leikai zone pile reinforcement...lapping 15th pile. Overhead tank 0.8ml capacity

Progress Update : 03/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.7778399,93.9264909
3.6376924915222
75984
Chingtham leikai zone pile reinforcement...lapping 15th pile. Overhead tank 0.8ml capacity

Progress Update : 03/11/2020
Ongoing
Package III
eemaintiphed
24.80748517734833,93.94173431396518
24.7854469,93.9612214
3.1422367187584
75984
Cube testing for pile at khuman lampak

Progress Update : 03/11/2020
Ongoing
Package III
eemaintiphed
24.80748517734833,93.94173431396518
24.8191641,93.9605839
2.303338380608
75984
Pile casting at khuman lampak

Progress Update : 03/11/2020
Ongoing
Package III
eemaintiphed
24.80748517734833,93.94173431396518
24.8233553,93.9561218
2.2852056742399
75984
Pile casting at khuman lampak

Progress Update : 03/11/2020
Ongoing
Package III
eemaintiphed
24.80748517734833,93.94173431396518
24.8233553,93.9561218
2.2852056742399
75984
Pile casting at khuman lampak

Progress Update : 03/11/2020
Ongoing
Package III
eemaintiphed
24.80748517734833,93.94173431396518
24.8233553,93.9561218
2.2852056742399
75984
Pile casting at khuman lampak

Progress Update : 03/11/2020
Ongoing
package 1
BabliRK
24.80748517734833,93.94173431396518
24.7950222,93.8924204
5.1667696961469
75984
langjing gslr

Progress Update : 03/11/2020
Active
1
Ton
24.80748517734833,93.94173431396518
24.7943841,93.945287
1.5001901430577
75984
Construction of Overhead Tank 0.6 ML Capacity at Old Thumbuthong Shift I

Progress Update : 03/11/2020
Active
1
Ton
24.80748517734833,93.94173431396518
24.7889292,93.9414635
2.0634123394959
75984
Construction of Overhead Tank 0.45 ML Capacity at Old Thumbuthong Shift II

Progress Update : 02/11/2020
Ongoing
III
eemaintiphed
24.80748517734833,93.94173431396518
24.77664292,93.9257061
3.7918350849471
75984
Chingtham leikai 0.8ml capacity overhead tank.pile casting no.14

Progress Update : 02/11/2020
Active
1
Naresh55
24.80748517734833,93.94173431396518
24.778935,93.9493587
3.2664415359164
75984
Constn of 0.45 ml capacity OHT at Akampat for Kongba Irong ( casting of pile no. 11)

Progress Update : 01/11/2020
Ongoing
Package III
eemaintiphed
24.80748517734833,93.94173431396518
24.8191641,93.9605839
2.303338380608
75984
Pile casting at khuman lanpak

Progress Update : 01/11/2020
Ongoing
Package III
eemaintiphed
24.80748517734833,93.94173431396518
24.8191641,93.9605839
2.303338380608
75984
Pile casting at khuman lanpak

Progress Update : 01/11/2020
Ongoing
Package III
eemaintiphed
24.80748517734833,93.94173431396518
24.8233553,93.9561218
2.2852056742399
75984
52nd pile reinforcement for OHT, khuman lampak

Progress Update : 31/10/2020
Ongong
III
RajendroN
24.80748517734833,93.94173431396518
24.78706,93.913173333333
3.6699762277917
75984
C/O. OHT 0.80 ML at Sangaiprou (87th & 88th pile)

Progress Update : 31/10/2020
Ongong
III
RajendroN
24.80748517734833,93.94173431396518
24.787113333333,93.912658333333
3.7073230636094
75984
C/O. OHT 0.80 ML at Sangaiprou (87th & 88th pile)

Progress Update : 30/10/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.773895,93.904693333333
5.2848491091589
75984
C/O. OHT 0.80 ML at Ghari 1 (70th pile)

Progress Update : 30/10/2020
Ongoing
Package III
eemaintiphed
24.80748517734833,93.94173431396518
24.8198711,93.9618588
2.4539354301253
75984
Pile reinforcement for OHT at Khuman Lampak

Progress Update : 30/10/2020
Ongoing
Package III
eemaintiphed
24.80748517734833,93.94173431396518
24.8191641,93.9605839
2.303338380608
75984
Pile reinforcement for OHT at Khuman Lampak

Progress Update : 30/10/2020
Ongoing
Package III
eemaintiphed
24.80748517734833,93.94173431396518
24.8191641,93.9605839
2.303338380608
75984
Pile reinforcement for OHT at Khuman Lampak

Progress Update : 29/10/2020
active
1
Naresh55
24.80748517734833,93.94173431396518
24.7747552,93.945287
3.6568590948821
75984
construction of 0.45 ML capacity OHT at akampat (kongba irong)

Progress Update : 28/10/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.787131666667,93.912795
3.6951631908587
75984
C/O. OHT 0.80 ML capacity at Sangaiprou (Pile)

Progress Update : 27/10/2020
Ongoing
Package I
eemaintiphed
24.80748517734833,93.94173431396518
24.8232292,93.9609026
2.6089964720148
75984
Reinforcement for 48th pile at khuman lanpak OHT

Progress Update : 27/10/2020
Active
1
Laksmee
24.80748517734833,93.94173431396518
24.9367006,93.8411098
17.591426276086
75984
Construction of 0.8 ML capacity OHT near TV tower Laiwangma shift II

Progress Update : 27/10/2020
Ongoing
package 1
BabliRK
24.80748517734833,93.94173431396518
24.7946167,93.894155
5.0110191074803
75984
construction of rcc glsr at langjing hilltop

Progress Update : 27/10/2020
Ongoing
package 1
BabliRK
24.80748517734833,93.94173431396518
24.7960674,93.8956921
4.8175099636209
75984
construction of rcc glsr at langjing hilltop

Progress Update : 27/10/2020
In progress
Phase 1
pahten123
24.80748517734833,93.94173431396518
24.7568112,93.9233057
5.9336020075093
75984
Casting of Raft foundation for canchipur GLSR Completed

Progress Update : 27/10/2020
In progress
Phase 1
pahten123
24.80748517734833,93.94173431396518
24.7568112,93.9233057
5.9336020075093
75984
Casting of Raft foundation for canchipur GLSR Completed

Progress Update : 27/10/2020
In progress
Phase 1
pahten123
24.80748517734833,93.94173431396518
24.7568112,93.9233057
5.9336020075093
75984
Casting of Raft foundation for canchipur GLSR

Progress Update : 26/10/2020
In progress
Phase 1
pahten123
24.80748517734833,93.94173431396518
24.7568112,93.9233057
5.9336020075093
75984
Casting of Raft foundation for canchipur GLSR

Progress Update : 26/10/2020
In progress
Phase 1
pahten123
24.80748517734833,93.94173431396518
24.7568112,93.9233057
5.9336020075093
75984
Casting of Raft foundation for canchipur GLSR

Progress Update : 26/10/2020
Ongoing
Package I
eemaintiphed
24.80748517734833,93.94173431396518
24.8169759,93.959309
2.063909343136
75984
Reinforcement of pile for OHT at Khuman Lampam

Progress Update : 26/10/2020
active
1
Naresh55
24.80748517734833,93.94173431396518
24.7755127,93.9446498
3.5671668557242
75984
construction of 0.45 ML capacity OHT at akampat

Progress Update : 26/10/2020
Ongoing
Package I
eemaintiphed
24.80748517734833,93.94173431396518
24.8169759,93.959309
2.063909343136
75984
Reinforcement of pile for OHT at Khuman Lampam

Progress Update : 25/10/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.787348333333,93.912848333333
3.6761847665113
75984
C/O. OHT 0.80 ML at Sangaiprou (casting of 78th pile)

Progress Update : 25/10/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.787308333333,93.9128
3.6827633965918
75984
C/O. OHT 0.80 ML at Sangaiprou (casting of 78th pile)

Progress Update : 25/10/2020
In progress
Phase 1
pahten123
24.80748517734833,93.94173431396518
24.7568112,93.9233057
5.9336020075093
75984
Casting of Raft foundation for canchipur GLSR

Progress Update : 25/10/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.787193333333,93.912878333333
3.6843139080396
75984
C/O. OHT 0.80 ML at Sangaiprou (casting of 78th pile)

Progress Update : 25/10/2020
In progress
Phase 1
pahten123
24.80748517734833,93.94173431396518
24.7591986,93.9231601
5.686965617164
75984
Casting of Raft foundation for canchipur GLSR

Progress Update : 25/10/2020
In progress
Phase 1
pahten123
24.80748517734833,93.94173431396518
24.7527154,93.9251102
6.3168399892586
75984
Concrete casting raft foundation for canchipur GLSR of 1.5 ML Capacity .

Progress Update : 25/10/2020
In progress
Phase 1
pahten123
24.80748517734833,93.94173431396518
24.7591986,93.9231601
5.686965617164
75984
Concrete casting raft foundation for canchipur GLSR of 1.5 ML Capacity .

Progress Update : 25/10/2020
In progress
Phase 1
pahten123
24.80748517734833,93.94173431396518
24.7568112,93.9233057
5.9336020075093
75984
Concrete casting raft foundation for canchipur GLSR of 1.5 ML Capacity .

Progress Update : 22/10/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.774058333333,93.904795
5.2647549996417
75984
C/O. OHT 0.8 ML at Ghari 1 (Pile)

Progress Update : 21/10/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.786961666667,93.91249
3.7310801095425
75984
C/O. ESR 0.45 ML at Sangaiprou

Progress Update : 21/10/2020
Ongoing
I
RajendroN
24.80748517734833,93.94173431396518
24.78703,93.912615
3.7164506732223
75984
C/O. ESR 0.2 ML at Sangaiprou

Progress Update : 21/10/2020
in progress
phase 1
mrajimp
24.80748517734833,93.94173431396518
24.8078247,93.9675657
2.6074134404067
75984
construction of 2 ML reservoir at Porompat

Progress Update : 19/10/2020
ongoing
phase1
eemaintiiphed
24.80748517734833,93.94173431396518
24.8221229,93.9660515
2.9448118812238
75984
site location of 0.8 ML OHT near TV Tower

Progress Update : 19/10/2020
ongoing
phase1
eemaintiiphed
24.80748517734833,93.94173431396518
24.8154105,93.9624963
2.2731796617461
75984
site location of 0.8 ML OHT near TV Tower

Progress Update : 19/10/2020
Active
1
ben
24.80748517734833,93.94173431396518
24.7932898,93.9446498
1.6055761518884
75984
Construction of 0.60 ML capacity overhead tank at old thumbuthong

Progress Update : 19/10/2020
Active
1
ben
24.80748517734833,93.94173431396518
24.79206821,93.94475461
1.7411028809592
75984
Construction of 0.60 ML capacity overhead tank at old thumbuthong

Progress Update : 18/10/2020
Ongoing
package-I
BabliRK
24.80748517734833,93.94173431396518
24.793549,93.8921021
5.2438042345383
75984
construction of RCC glsr at Langjing Hilltop

Progress Update : 14/10/2020
ongoing
phase1
eemaintiiphed
24.80748517734833,93.94173431396518
24.7917954,93.9664118
3.0410027328137
75984
site development works at 0.8 ML OHT Thambalkhong for Rahmania zone

Progress Update : 14/10/2020
ongoing
phase1
eemaintiiphed
24.80748517734833,93.94173431396518
24.7914546,93.9662826
3.052305365281
75984
site development works at 0.8 ML OHT Thambalkhong for Rahmania zone

Progress Update : 14/10/2020
ongoing
phase1
eemaintiiphed
24.80748517734833,93.94173431396518
24.7923322,93.9669589
3.0530522624198
75984
site development works at 0.8 ML OHT Thambalkhong for Rahmania zone

Progress Update : 13/10/2020
In progress
Phase 1
pahten123
24.80748517734833,93.94173431396518
24.7564409,93.9233057
5.9727142730138
75984
Construction at canchipur GLSR of 1.5 ML Capacity : Reinforcement work in progress

Progress Update : 13/10/2020
In progress
Phase 1
pahten123
24.80748517734833,93.94173431396518
24.7564409,93.9233057
5.9727142730138
75984
Construction at canchipur GLSR of 1.5 ML Capacity : Reinforcement work in progress

Progress Update : 11/10/2020
ongoing
Phase 1
eemaintiiphed
24.80748517734833,93.94173431396518
24.8278226,93.9707022
3.6959692371608
75984
piling works 0.6 ML OHT at Sajor leikai shift 1

Progress Update : 11/10/2020
ongoing
Phase 1
eemaintiiphed
24.80748517734833,93.94173431396518
24.8277729,93.9706979
3.6922476719319
75984
piling works 0.6 ML OHT at Sajor leikai shift 1

Progress Update : 11/10/2020
ongoing
Phase 1
eemaintiiphed
24.80748517734833,93.94173431396518
24.8077217,93.9666847
2.5183599120037
75984
piling works 0.8 ML OHT at Porompat

Progress Update : 11/10/2020
ongoing
Phase 1
eemaintiiphed
24.80748517734833,93.94173431396518
24.8076368,93.9667421
2.524073093
75984
piling works 0.8 ML OHT at Porompat

Progress Update : 09/10/2020
ongoing
Phase 1
eemaintiiphed
24.80748517734833,93.94173431396518
24.8075224,93.9665271
2.5023215817322
75984
Piling works for 0.8 ML and 0.45 ML OHT at Porompat

Progress Update : 09/10/2020
ongoing
Phase 1
eemaintiiphed
24.80748517734833,93.94173431396518
24.8077571,93.9667134
2.5213001921618
75984
Piling works for 0.8 ML and 0.45 ML OHT at Porompat

Progress Update : 09/10/2020
ongoing
Phase 1
eemaintiiphed
24.80748517734833,93.94173431396518
24.8068358,93.9662992
2.4803743991389
75984
Piling works for 0.8 ML and 0.45 ML OHT at Porompat

Progress Update : 09/10/2020
ongoing
Phase 1
eemaintiiphed
24.80748517734833,93.94173431396518
24.807797,93.9673906
2.5896998344389
75984
Excavation for 2 ML Reservoir at Porompat

Progress Update : 09/10/2020
ongoing
Phase 1
eemaintiiphed
24.80748517734833,93.94173431396518
24.8078151,93.967405
2.5911806044821
75984
Excavation for 2 ML Reservoir at Porompat

Progress Update : 09/10/2020
ongoing
Phase 1
eemaintiiphed
24.80748517734833,93.94173431396518
24.8078315,93.9673975
2.5904500069855
75984
Excavation for 2 ML Reservoir at Porompat

Progress Update : 08/10/2020
ongoing
phase I
eemaintiiphed
24.80748517734833,93.94173431396518
24.8094265,93.9647276
2.3306951977919
75984
Porompat 0.8 ML and 0.45 ML OverHead Tank Piling Works

Progress Update : 08/10/2020
ongoing
phase I
eemaintiiphed
24.80748517734833,93.94173431396518
24.8094265,93.9647276
2.3306951977919
75984
Porompat 0.8 ML and 0.45 ML OverHead Tank Piling Works